My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO <br />kyle.hllton*nv6.00m <br />949.686.0477 <br />EXPERIENCE <br />6years <br />EDUCATION <br />B.S. Civil & Environmental <br />Engineering <br />LICENSES/CERTIFICATES <br />CM! Enginear4n-'IYpining <br />KYLE HILTON, EIT <br />Project Engineer <br />... .............. _..m,.,... ... ..,............. ........ .............. ,........ .,........... .....,........_............... .....,.................... <br />Mr, Hilton has more than six years of experience In publioworks Improvements, <br />Including planning and design of streets, arterial streets, right-of-way engineering, and: <br />storm dtain design. His professional experience also includes CAD drafting, bridge <br />mtift Water quality Management Plans (WQMP), Environmental Impact Reports (EIR), <br />and Storm Water pollution Prevention Plans (SWPPP). He also has also served various <br />roles far staff augmentation assignfnents. <br />Project Experience <br />..... ............ ........................w.. W............._.... .... .......... ,.v.._...,_,............... .......... ....... _._... <br />Rancho Palos Verdes Area 9 New Striping and Signing <br />CITY OF RANCHO PALOS VERDES I RANCHO PALOS VERDES, CA <br />: Design Engineer. Mr. Hilton was responsible for striping end,slghing plans for a large <br />neighborhood community, The project consisted crackling hew signs and striping on. <br />the streets of a neighborhood cornhilunity. <br />Bristol Street Widening from aro Street to civic center <br />CITY OF SANTA ANA i SANTA ANA, CA <br />Design l ngtheer. Mr. Hiitdn was rpsponsible.forthe.design rffherstreee.widening <br />Plot*, landscape plans And irrigation plansfcrthis project. The project consisted of <br />addingan additional lsnain each direction. Also, a median was constnicted with a <br />deccvnposed granite walkway and a dry stream No Yves constructed in place ofa <br />gutter, <br />Grand Street Widening from let to 4th Street <br />CITY OF SANTA ANA I SANTA ANA, CA <br />Design Engineer. Mr: Hilton was responsible forthe design of the street widening <br />plans, landscape plans and irrigation plans for this pmjecL The priijeet consisted of <br />adding an additional lane in each direction. Also, a median was aonstr,ucted with a dry <br />stream ted In the middle to allow for runoff to percolate Into the soil. <br />Memorial Park Walkway, Basketball courts, and Volleyball Courts <br />Renovation <br />CITY OF SANTA ANA I SANTAANA, CA <br />Design Engineer. Mr, Hilton was responsible forthe design of the walkway, basketball <br />courts, and volleyball courts reconstruction plans for this project. <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Design Engineer. Our team was selected to provide engineering design services. and <br />Mr. Hilton is responsible for providing the final design of the bus stops while satisfying <br />the needs of multiple government agencies. Phase Il of the Expo Line is expected to <br />to completed in late 2025 and will extend the line to Santa Monica. As a result, Big <br />Blue Bus is implementing a comprehensive redesign of its tranaltsystem to connect <br />Passengers with the Expo Line stations in attempt to create a more efriolent commute <br />for passengers; these Initiatives also include the Inclusion of signage, bus berths <br />and overall pedestrian Improvements. Spaclficaliy, our team Is providing preliminary, <br />sohematio and final design, to Include construction documents detailing bus pads, <br />ADA -compliant wheelchair pads, sidewalk extensions and the location of bus stop <br />25E-531 <br />
The URL can be used to link to this page
Your browser does not support the video tag.