Laserfiche WebLink
The project: Includes the design of pavement rehabilitation strategies as well <br />as the identification and replacement of non -ADA compliant curb ramps, <br />sidewalk, replacement of damaged curb and gutter, and the identification <br />and adjustment/protection of utility facilities. The City has recently <br />expanded the scope of the project to include Improvements within S11-241 <br />Caltrans right-of-way. This projectalso included the relocation of an existing <br />median at Portola Parkway and Bake Parkway in order to construct an <br />additional left turn lane. The scope of the reconstruction included design <br />Of plan and profiles and design sections as well as the analysis of the existing <br />and proposed traffic signal system to ensure adequate capacity is available <br />in the existing condults/system. <br />Overlay, Alley Reconstruction, and. <br />Cerritos Ave. Widening Project -Stanton, CA <br />TAIT.& Associates was selected by the City of Stanton to provide roadway <br />and drainage design services on three separate project areas: (1) Cerritos <br />Avenue Widening & Drainage improvement Project, (2) Petals Alley <br />Reconstruction project and (3) Bradford Community and Rutledge Avenue <br />Rehabilitation Project <br />Cerritos avenue widening project required the widening of Cerritos avenue <br />from Rose Ave to Flower Street which included removal and reconstruction <br />of existing parkway improvements, relocation of power poles, fire hydrant, <br />water meter, and roadway signs, construction of new curb and gutter, curb <br />ramps, and alley approach, and the relocation and construction of a new <br />storm drain catch basin and lateral, The existing storm drain lateral was <br />discovered to be extremely shallow which required special design and <br />consideration for the relocated condition. TAIT checked the capacity and <br />flows of the existing Inlets to ensure proposed conditions were not <br />constrained. <br />Newport Heights Alley and Sewer <br />Replacement Project -Newport Beach, CA <br />TAIT was selected by the City of Newport Beach to provide civil engineering <br />services on Newport Height Alley and Sewer Replacement Projects, The <br />project limits spanned across an entire neighborhood in the City s coastal <br />community of Newport Heights and include a total of 3+ miles of alley <br />reconstructions as well as the review and repair of existing alley sewer and <br />lateral connections. in order to facilitate the City's budget and timeilnes, <br />the design project was split in to three phases which required separate <br />design PS&E for each project. <br />Phase 1 Included all sewer main replacements while Phases 2 and 3 <br />Included the alley removal and replacements In the neighborhoods. The <br />proposed design includes the preparation of design plan and profile for <br />Oji TAIT ,,: <br />211115E-569 <br />TAiT & Associates, inc. <br />on-call Engineering Services <br />Reference:. <br />Doug Erdman, PE <br />Tel: 949-282-5233 <br />Key Staff <br />PiC: Jacob Vandervis <br />PM: David Sloan <br />QA/QC: Todd Schmieder <br />Client: <br />City of Lake Forest <br />Construction Cost: <br />$1.5 M <br />Project Dates <br />Design: 2015-2016 <br />Construction: 2016 <br />Reference: <br />Allan Rigg <br />(71A)890-4203 <br />I(ey Staff: <br />PiC: Jacob Vandervis <br />PM: David Sloan <br />QA/QC: Todd Schmieder <br />PE: Chris Engelbach <br />Client: <br />City of Stanton <br />Construction Costa <br />$1.3 M <br />Project Dates <br />Design: Jan -May, 2017 <br />Construction: Summer, 2017 <br />Reference: . <br />Frank Tran, PE <br />(949)644-3340 <br />Key Staff: <br />PIC: Jacob Vandervis <br />PM: David Sloan <br />QA/QC: Todd Schmieder <br />PE: Chris Engeibach <br />Client: City of Newport Beach <br />Construction Cost: <br />$1.3 M (Sewer) <br />TBD $1.8 M (Alley) <br />Project pates: 2016-2017 <br />Page 110 <br />