My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Cali Engineering Services <br />0 1110000000al <br />Reagan 8f. Peterson Park Parking Lot <br />Rehabilitation Project- Diamond Bar, CA <br />TAIT was hired by the City of Olamond Bar to analyze, design and conduct <br />construction management and inspection services for the expansion of two <br />public park parking lots. The design services Included topographic survey, <br />geotechnical Investigation, water quality management design, los Angeles <br />County Flood Control District storm drain permit processing, and the <br />preparation of detailed PSH for the construction of the park Improvements. <br />Design analysis Included addition of handicapped parking stalls, .design of <br />optimal cross and longitudinal grades and the installation of retaining curbs <br />to optimize the parking stall configuration. Extensive coordination between <br />the City's public works and Park Maintenance Division was required In order <br />to ensure the design was both in compliance with public works standards as <br />well as the park.dlvistan's ultimate master plan. <br />OC Animal Care Fadlity - Tustin, CA <br />TAIT prepared rough and precise grading plans, street plans, sewer and water <br />plans, fire water protection plans, Water Quality Management Plan and the <br />Storm Water Pollution Prevention Plan for a 10 -acre site on the former MCAS - <br />Tustin. This County of Orange project was the first Design -Build project by the <br />County. The contract was award In the spring of 2016 and a Rough Grading <br />Permit was issued by the City of Tustin In July 2016 while the OC Animal Care <br />and the Design -Build Contractorfinaiized the facility ands site improvements, <br />As part of the Design TAIT coordinated the project's containment wail and <br />fence locations and develop a site accessibility plan for the overall project. <br />The facility Includes a 2 -story 40,000 SF administration building with state of <br />the art veterinary facilities, six dog kennels, special cat housing quarters and <br />a small corral. Separate parking lots provide for the public and staff parking <br />lots which repurposed nearly 1 -acre of existing concrete tarmac. The project <br />also includes eight stormwater bio -filtration basins to treat storm water <br />runoff from the site before it enters the public storm drain system. Const was <br />completed and the facility was opened to the public in March 2018. <br />REFERENCES <br />City of Lake Forest <br />Doug Erdman, PE <br />(949) 282-3233 <br />25550 Commercentre Drive, <br />Lake Forest, CA 92630 <br />Pro cts: Portola Parkway Resurfacing <br />Reference: <br />John Beshay, <br />Tel; (909)839-7043 <br />Key Staff: <br />PIC: Jacob Vandervis <br />QA/QC: Todd Schmieder <br />PM/CM: David Sloan <br />Inspector: Michael <br />Delagarza <br />Client: <br />City of Diamond Bar <br />Construction Cost: <br />$575 K <br />Project Dates <br />2014.2015 <br />Reference: <br />Joe Seybold, Sr, PM <br />Tel; 714-667-4921 <br />Key Staff: <br />PIC: Jacob Vandervis <br />PM: Todd Schmieder <br />PE; Michael Delagarza <br />PE; Chris Engeibach <br />Client: <br />County of Orange <br />Construction Cost: <br />$35 M <br />Project Dates <br />City of Newport Beach <br />Frank Tran, Pt <br />(949)644-3340 <br />100 Civic Center Drive <br />Newport Beach, CA 92660 <br />EmLes Newport Heights Ailey &,Sewer imp. <br />i� TAIT Page 112 <br />2 1115E-571 <br />
The URL can be used to link to this page
Your browser does not support the video tag.