My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL- ENGINEERING SERVICES <br />RFP NO: 117-083 <br />City of Santa Aria <br />PROPOSAL <br />Roadway <br />The proposed total street width will be 120 feet, consistent with the CIVs Street standards for a major <br />separated Arterial. Mark Thomas understands very well how the City can accommodate all of the project <br />elements into the desired roadway width. <br />The existing 14 -foot raised landscaped median will be protected -In-place. Turn pockets and turn bay lengths <br />shall be modified as needed or as dictated by the supporting tragic report. <br />WE <br />WE <br />4' Buffer <br />12' 10' 11 <br />' Buffer <br />SW 1 3-12' Lanes Median 3-12' Lanes i SW I <br />tett Exist Walls or New Wall <br />rate Property { 0 Property Un'ee <br />�� It �1 <br />--ij[ _, <br />Rehab Exist Pavemen Landsco e Exist <br />(Where Possible) Wide <br />Median �Upgrode} Bus <br />-Separated Bikeway (As <br />Proposed Roadway improvements <br />Landscaping <br />It is understood that both the proposed parkways and the raised bike lane buffer will be planted per the <br />latest water conservation requirements, and per the City's preferences and pallets requirements. The final <br />landscaping will match the adjacent project aesthetics that were recently completed. <br />In addition to the parkway landscaped strip, any unused property behind the sidewalk will be considered for <br />BMP installations. <br />Proposed Street Section <br />for <br />120NIGHTOFWAY <br />Typical Sectlora of ROW Constraint <br />25E-628 <br />t £ i <br />;s <br />
The URL can be used to link to this page
Your browser does not support the video tag.