Laserfiche WebLink
II' <br />VOOTWiNiNG <br />Sean Lin, PhD PE, GE, Chief Geotechnical Engineer <br />Dr. Senn Lin has over 20 years of profeselonal experlenoe as a Geot'ethnfcal <br />In selpnilo site response analysis os it applies to hospitals, schools and high -o <br />professional experience includes soil mochanics and foundatfons, soil rslnfon <br />design and driving arya"$I$, slope stability, and liquefaction analysis. Sean h€ <br />enginogriog projacis for commercial, residential, waterfvfas#ewater, military; e <br />facilities, Scan assn fres a arleh0 In gaotpohnical aril oonstYucfIon projects <br />restdentlal, militortyy educa Ions) and industrial facilities Including technical and <br />supervision of staff and personnel. <br />Overview <br />Joined Twirling In 2014 <br />In the Industry since 1997 <br />Current Licenses Meld <br />California Registered Civil Engineer, PE 67109 <br />California Registered Geotechnicof Engineer, GE 2921 <br />Education <br />Ph.D. Civil Engineering emphasis Earthquake Engineering, <br />University ofSouthemCallfornia, LosAngoles, CA <br />Master of Science, Civil Engineering emphasis Gootechnical Engineering, <br />University of Southern California, Los Angelos, CA <br />Bachelor of Science, Civil Engineering, <br />Chung Yuan Christian University, Taoyuan. City, Taiwan <br />Project Experience Summaries <br />Engineer, He speciallizes <br />so buildings. His <br />ement, geosynthetics, pile <br />A commercial, <br />oversight and <br />• City of Fontana, Street Widening Including Sidewalk Design, Martin Avenue at Sierra <br />Avenue This street improvement project included street and sidewalk Improvements on Martin <br />Avenue from Sierra Avenue to approximately 525 feet east of Sierra Avenue, The roadway and <br />street improvements consisted of curb, gutter, sidewalk, handicapped access ramps, commercial <br />and residential driveways, AC pavement, and utility polo relocations, Sean served as the <br />geoteohnical engineer and project manager, performing pavement condition evaluation, field <br />exploration, geotechnical laboratory testing, and engineering analysis. Sean provided a final <br />structural pavement recommendation report for the project. <br />• City of Colton, ML Vernon Avenue Over UPRR Tracks Bridge Widening Seen is serving as <br />Project Manager for the widening of this bridge from 2 lanes to 4 lanes. He is responsible for the <br />geolochnloal engineering services, which include a preliminary foundation report, geotechnical <br />Investigation, geotechnical laboratory testing, and geotechnical engineering analyses. He <br />communioates with the structural and civil engineers closely and provides geotechnical design <br />recommendations during the design phase. Sean also coordinates stakeholders" right of way <br />information for the City of Colton and the UPRR. <br />City of Simi Valley, Cochran Street and Las Lejas Channel Bridge Widening Sean was the <br />Project Manager for this project, which consisted of widening the bridge from two to four lanes. <br />Ile was responsible for oversight of the geotechnical investigation to explore and evaluate the <br />subsurface conditions, and provided geotechnical engineering recommendations for the design of <br />the project. <br />25E-69 <br />0 <br />0 <br />�.r <br />0 <br />0 <br />0 � <br />0 <br />I <br />I <br />I <br />ii <br />