Laserfiche WebLink
VOOTWINING <br />Seen Lin, PhD,, PE, GE, Chief Geatechnical Engineer <br />Dr. Sean Lin has over 20 years of profaselonal oxp6rlejnoe as a Gootethnfc6l <br />In pelpsilo site response analysis os,11: applies to hospitals, schools and filgh-i <br />a once 0 u 09 s nlosondfo n <br />I re <br />�$aa <br />00 <br />"ofos"ono' 0xp in I d Oil 'nocho '01 on 'ou Mfono�o <br />"al,n on' driving n "$I$, slope $101"I". and liquefaction "" <br />enaln"grJog prolocits for comMorciall residential, rnIlIta <br />f cillif � 0 as a a 0 1 1 1 <br />4 $10 :a soon 5 h p riell in 900 eon ca and construction pro <br />re ntlaI milito . od"allons, and Industrial facilities Including technic <br />supervision of sta and personnel. <br />Overview <br />Jolrmd TwInIng In 2014 <br />In the Industry since 1997 <br />Current Licenses Held <br />California Registered Civil Engineer, PE 67109 <br />California Registered Gootechnicof Engineer, GE 2921 <br />Education <br />Ph.D. Civil Engineering emphasis Earthquake Engineering, <br />University ofsouthemballfornia, LosAntioles, CA <br />Master of Science, Civil Engineering emphasis Gootechnioal Engineering, <br />University of Southern California, Los Angeles, CA <br />Bachelor of Science, Civil Engineering, <br />Chung Yuan Christian University, Taoyuan. City, Taiwan <br />Project Experience Summaries <br />Engineer, He specializes <br />so 60dings. His <br />ement, geosynthatics, pile <br />A, commercial, <br />oversight ond <br />• City of Fontana, Street Widening Including Sidewalk Design, Martin Avenue at Sierra <br />Avenue This street Improvement project Included street and sidewalk Improvements on Martin <br />Avenue from Sierra Avenue to approximately 526 feet east of Sierra Avenue, The roadway and <br />street Improvements consisted of curb, gutter, sidewalk, handicapped access ramps, commercial <br />and residential driveways, AC pavement, and utility poto relocations, Sean served as the <br />geoteohnical engineer and project manager, performing pavement condition evaluation, field <br />exploration, geotechnical laboratory testing, and engineering analysis. Sean provided a final <br />structural pavement recommendation report for the project. <br />• City of Colton, ML Vernon Avenue Over UPRR Tracks Bridge Widening Seen Is serving as <br />Project Manager for the widening of this bridge from 2 lanes to 4 lanes. He Is responsible for the <br />geolochriloal engineering services, which include a preliminary foundation report, geoteohnical <br />Investigatlon,.geotechnical laboratory testing, and geotechnioal engineering analyses. He <br />communloates with the structural and civil engineers closely and provides geotechrilcol design <br />recommendations during the design phase. Sean also coordinates stakeholders' right of way <br />Information for the City of Colton and the UPRR. <br />City of Simi Valley, Cochran Street and Las Lejas Channel Bridge Widening Sean Was the <br />Project Manager for this project, which consisted of widening the bridge from two to four lanes. <br />Ile was responsible for oversight of the geolachnical Investigation to explore and evaluate the <br />subsurface conditions, slid provided gootechrical engineering recommendations for the design of <br />tile project. <br />25E-69 <br />0 <br />00 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />&I <br />