|
VOOTWINING
<br />Seen Lin, PhD,, PE, GE, Chief Geatechnical Engineer
<br />Dr. Sean Lin has over 20 years of profaselonal oxp6rlejnoe as a Gootethnfc6l
<br />In pelpsilo site response analysis os,11: applies to hospitals, schools and filgh-i
<br />a once 0 u 09 s nlosondfo n
<br />I re
<br />�$aa
<br />00
<br />"ofos"ono' 0xp in I d Oil 'nocho '01 on 'ou Mfono�o
<br />"al,n on' driving n "$I$, slope $101"I". and liquefaction ""
<br />enaln"grJog prolocits for comMorciall residential, rnIlIta
<br />f cillif � 0 as a a 0 1 1 1
<br />4 $10 :a soon 5 h p riell in 900 eon ca and construction pro
<br />re ntlaI milito . od"allons, and Industrial facilities Including technic
<br />supervision of sta and personnel.
<br />Overview
<br />Jolrmd TwInIng In 2014
<br />In the Industry since 1997
<br />Current Licenses Held
<br />California Registered Civil Engineer, PE 67109
<br />California Registered Gootechnicof Engineer, GE 2921
<br />Education
<br />Ph.D. Civil Engineering emphasis Earthquake Engineering,
<br />University ofsouthemballfornia, LosAntioles, CA
<br />Master of Science, Civil Engineering emphasis Gootechnioal Engineering,
<br />University of Southern California, Los Angeles, CA
<br />Bachelor of Science, Civil Engineering,
<br />Chung Yuan Christian University, Taoyuan. City, Taiwan
<br />Project Experience Summaries
<br />Engineer, He specializes
<br />so 60dings. His
<br />ement, geosynthatics, pile
<br />A, commercial,
<br />oversight ond
<br />• City of Fontana, Street Widening Including Sidewalk Design, Martin Avenue at Sierra
<br />Avenue This street Improvement project Included street and sidewalk Improvements on Martin
<br />Avenue from Sierra Avenue to approximately 526 feet east of Sierra Avenue, The roadway and
<br />street Improvements consisted of curb, gutter, sidewalk, handicapped access ramps, commercial
<br />and residential driveways, AC pavement, and utility poto relocations, Sean served as the
<br />geoteohnical engineer and project manager, performing pavement condition evaluation, field
<br />exploration, geotechnical laboratory testing, and engineering analysis. Sean provided a final
<br />structural pavement recommendation report for the project.
<br />• City of Colton, ML Vernon Avenue Over UPRR Tracks Bridge Widening Seen Is serving as
<br />Project Manager for the widening of this bridge from 2 lanes to 4 lanes. He Is responsible for the
<br />geolochriloal engineering services, which include a preliminary foundation report, geoteohnical
<br />Investigatlon,.geotechnical laboratory testing, and geotechnioal engineering analyses. He
<br />communloates with the structural and civil engineers closely and provides geotechrilcol design
<br />recommendations during the design phase. Sean also coordinates stakeholders' right of way
<br />Information for the City of Colton and the UPRR.
<br />City of Simi Valley, Cochran Street and Las Lejas Channel Bridge Widening Sean Was the
<br />Project Manager for this project, which consisted of widening the bridge from two to four lanes.
<br />Ile was responsible for oversight of the geolachnical Investigation to explore and evaluate the
<br />subsurface conditions, slid provided gootechrical engineering recommendations for the design of
<br />tile project.
<br />25E-69
<br />0
<br />00
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />&I
<br />
|