COW WARAM Psvoment hohobIlItaflon., Thertask included a total of 42 streets, sod had striothudool, funding, And
<br />scheduling components, The City nooded oconsoftnt who could onslyzo toveroll alternative pavement rehablietallop
<br />strategies under a limited corratiruollon budglat,while still meeting the required project pulde4nes toobtain funding.
<br />JImprovemonts entailed grind ago overlay of all strooWnboth bid packages. with the quo of on Asphalt Robber and
<br />Aggregate Membrane (ARAM) Intorloyer, with localized areas of full -depth remove and replace. Klmley-Hom asslated the
<br />city to meet requirements fors grant from the Department of Resources Recycling and Recovery (Cat Recycle) and the
<br />Community Development Wok Giant tPUG),lederst funding program, Klmley-Hom's. knowledge Of how and Innovative
<br />Pavement rehabilitation strategies has helped the City utlllze:reoybleid materials mflnwplgoe recycling methods, which
<br />has broulght N Olty several funding opportunities and millions of dollars to consteuctfort cQsUsovIngs.
<br />Client Rollerah * city ofFontana, Xelth gromer, Public Works-Manoger, 909J60,6644
<br />West Grove Valley pipelines, Riverview Pipelines, Santa Afta, CA (flazell'and Sawyer)
<br />Uo projects with the City of Wig Ana Included a total of over 17,000 Linage Feet 61 water pipeline design ranging In
<br />size from 84hohto 12-inchdiaMoter. The City Is actively replacing aging and undersized water maIns throughout their
<br />distribution system, The West Grove Valley project 1poludecl 9.500 Linear Foot of pipeline replacement design. The
<br />.Riverview project included 7,700 Linear Featof pipeline replacement design;
<br />Client Reference: City of 8onta Ana, Pubfic Wks, Agency, Armando Fernandez, Project Manager 714.647.5680
<br />Well 29 Improvements Alternatives Analysis, Santa Ana, CA (Hazen and Sawyer)
<br />ThoCety of $anto Ana owns and o0srates Well 29, located at the southeast comer of Flower $treet old First Streeti
<br />adjacent to City owned tonrils ob Urts, W611 29 Oumps drottly to an existing. 8 MG reservoir, The existing well site Indudes
<br />the well head and discharge, piping assembly,, control equipment, a chlorination system In a building, end. an SCE
<br />transformer. An alternatives analysis Was.corducted W recommend, upgrades At the site including site Improvements,
<br />structural, mechanical, and electrical upgrades, Highlights of the study Include developing three altornallvos for the
<br />Improved site, providing 30 renderings for each site alternative, and developing a preliminary. opinion of probable
<br />cost for the design and construction of each alternative d1scussed. The Cllyls moving forward with ImplementIng the
<br />recommended alternative from this analysis.
<br />ClIont Reference: City of Sonta/lnp, Publib WorkgAgency -.Woler Resources UvWon, 13den Igo, Assistant Engineer
<br />714,6443386
<br />References
<br />We [love provided client references In the previous sectlon and below. We Invite you to contact these recent clients and
<br />ask them about our work history, qoallty of service,, and whotherthey would again select us for slmllar services.
<br />Me, Carlos Castellanos, City Engineer, City of Anaheim
<br />TEL� 714.765,5176 (On -Call Planning and Engineering projects)
<br />Mr. Keith Kramer, Public Works Manager. City of Fontana
<br />TEL: 909,350.6644 (On-CsII Pavement Rehabilltation/UtIllty Design Projects)
<br />Mr. Jason Lee, Project Manager, Orange County Transportation Agency
<br />TEL: 714.660.6282 (On -Call Transportation Engineering projects)
<br />KimlepMorn 14 M007W.171 Ofty of OontaAna
<br />25E-1 04
<br />
|