Laserfiche WebLink
We will prepare a report presenting the results of fl&ld exploration, geotachnical laboiratorylesting, and enlilne6ring <br />analyses, as well as conclusions and Nbdmm#odallon� relative to the project, <br />Deliverobles., Draft Pavement and Wl Material Report, Final Pavement Report and W Material Report, <br />Task 4. Sumpy (Options A and B) <br />............ ....... <br />The mlaylllilo� team will provide aerial mspplqg with supplemental ground surVeys at 0 ocalo of 10 = 20, With 50 foot <br />Interval cross sections Along, stroots as well As too, project Arad forpump stations, This ondompasses tuNey record <br />collection,, establishment of horizontal And Vertical controls, monumorl and.00ntortloo tle presowation; and establishment <br />Of temporary benchmarks, Existing features such as utility covors, pavement, limit&, private property Improvernants, curb <br />rernp,s dAvoways, curb ohd.guiters, v1doWAlks, street lights nod poles, trid Vallic signs and striping will I be surveyed <br />whoro'n;W�ed forthe proposed, d"Ign nod eddieflo the bass maps, Existing rIght-of-way, will be Input per readily <br />available records, <br />Doliverables., microstaffon Val F#a$ of Topognaphic Survey, XML Point File, 0 TM of existing surface features. <br />Task,5: Hydraultallilydrology Analysis (Option 8) <br />Our team will prepare a Drainage Report to address hydrology and hydraulics for the site par Orange County <br />Hydrology Manual. and Orange County Local Drainage Manual reqQlraments:and will provide design recommendations, <br />ModIlloations are Intended to maintain exIstIng drainage patterns and flows. Calculations will consist of comparing the <br />pre. and post -project conditions at the ellt4, Catch basins; Will be Incorporated Into design, where necessary, Ia. to lifialt <br />flooded Width, and at low points. <br />Dolivorables. Draft hydrology and hydraulic analysis and drainage report, Final hydrology end hydraulic analris and <br />drainage repoit. <br />7as,k 6: Water Quality (Optlo4s A and B) <br />I(Imlay-Hom will develop a WOMP for the project In compliance with, and meeting the requirements of Order.No. <br />R8-2009-003DINPi)ES No, CAS618030, of the Santa Ana Regional Water Quality Control Board, The WQMP will <br />Incorporate kJW IMP901 dMIOProSht best Management practices to the maxlmom extent practical. For example, thel Use <br />of 61oreterition facilities within landscaped parkway areas will be In accordance with the United States Environmental <br />ProtactIon Agency Green $treat standards. If proprietary Items are needed, these will be Indicated In compliance with (he <br />Clty�s adopted poblIG contracting coda. <br />Doliverables. Dreft WOUR, Final WOMP <br />Task 7: Envitimmental Sttidles (Options A and B) <br />Klmlay-Hom Scope of Services assumes that an Initial Study leading to a Mitigated Negative Deolaratlon (IS/ MUD) Is <br />the appropriate CEQA documentation for the proposed project. The 18 will provide the necessary background. Each of <br />the topics contained In the Environmental Checklist wIII beevaluated to document the nature And extent of any potential <br />environmental consequences and the need for mitigation, During the preparation of the IS should It be determined that <br />the project could have significant Impacts that cannot be folly Mitigated, we will work with the City to Identify modlfloatlons <br />to the project that could reduce anticipated Impacts. Using the Clty`8 Initial Study Checklist, Kimlay-Horn will respond to <br />each checklist question. The analysis will use the following technical studios nod data prepared by our team: Traffic Impact <br />Study, Air Quality and Greenhouse Gas Study, Nolan Study, Utilities/ Infrastructure, GootechnIcal Study, Drainage, Concept <br />WOMP, and a Phase I Environmental Site Assessment., All other environmental topics would be studied qualitatively. <br />Defiverables., Initial Study leading to a Mitigated Negative Declaration (ISIMND). <br />Kimley*Horn <br />Ia TROG77025.171 01ty of ftto Ana <br />25E-1 06 <br />0 <br />Ck <br />Cp <br />