Laserfiche WebLink
Task 8, Street Improvement Plans (q�tloq B) <br />- .. .... ..... '— "' " - ""' " . .... * ' "'—' ' " ...... .. ... . .. ... . -- ........ <br />Amley-H - orn , will . do . v . cio . p . a .*�ire'et*l*mp'ro've'mon't�pi'an fDrt*h'e'c'on'o'tmctio'n*of"r'oadw'ay' I m'p'r'ov*em*e'nts.'Th�e'p'lan's'wll'l*s'how... <br />horizontal and vortlosidesIgn Information, Roadway plans will be prepared at a scale of V m20'horlzontal and V=4� <br />vertical for profiles. We will use the surveying from Task 4 for base mapping. Vertical d6sigin Information for construction of <br />new medians and ourbs will be Indicated on the ploftewith profiles. Details and typical sections *111 be added as needed. <br />we will prepare details for items that deviate from published standards. <br />Doliverables:,30%, 66%, and Final Plans, electronic files In Microgtation V81 and PDF (finalplans will be sealed and <br />signed), tird responsos to provIo us, revio w comments Imm the City. <br />Task 9: System Modeling to Connect Well Directly to Water System (Option A) <br />c-t'e*J-'t*o* 'a"n'a— - * "('h"o ... ... c'o* n— I I .... * ............. *"**"* ....... <br />lyze , Alonsfrointhoexistingolroct <br />discharge too reservoir, to a droctconneollon to the Clift distribution systernA pow. system curve Will be developed <br />and analyzed with the existing well pump curve to determine the now operating conditions ofthe pump, along with any <br />Improvements necessary for the now connection point The model Will also be used to.anslyze Impacts to other system <br />facillffeawlthla the CitY.s distribution system, and recommend a revised operations and control strategy. <br />Delivorables; I)mft water system modeling report, Final visteraystom modeling topol. <br />Task 10: Water Improvement Plans (Option A) <br />.............. I ... I ... ............... ...' ...... .............. ........ ........................ .............. - ....... <br />KJmfey-Hom Will develop a Water Improvement plan for rehabilitation of the existing water well and proposed water <br />Maine construction. The plans will show horizontal and vertical design Information, Plans will be prepared at a scale <br />of 10 � 20'horizontal and 1 " = 4'vettloal for profiles, We will use the turveying from Task 4 for base Mapping, Vertical <br />design Information I I br water main will show proposed water main proffle and Will Identify potential conflicts with existing <br />4ndorpround utilities. Details and typical sections Will be added as needed. We will prepare details for Items that deviate <br />from published standards, <br />Deliverablos: 30%, 60%, and Final Plans, electronic riles In Microstallon Val and PDF (final plans will be sealed and <br />signed), and responses to previous review comments from the City. <br />.��sk. 11: Signing. and Striping Plans (Options A.and B) <br />"" ................. ­' ' .... ­ ....... ­* ......... ' ........... * ................ . ­­­ .... ..... ** .... * ............ .......... * ........ <br />we will prepare striping and signing plons. at a scale of I"= 40'for the proposed Improvements within the limits of the <br />project. Striping and signing plans will comply with the City's standards, Caltmns, and the California MUTCD, Flashing <br />beacon Installation and parking meter details, If required. Vill be shown on the striping and signing plans, <br />Deliverables. 30%, 60%, and Final Plans, electronic files In Microstation VOI and PDF (final plans will be sealed and <br />signed), and responses to previous mviow comments from the City <br />rask 12., Landscape and Irrigation Plans (Option B) <br />ie- *K"1m"'1e"y--'H-o'm- 't'e'a-m- o-r'e-a 'n' s" ib-r' 'the" *p' 'ro" p-o' s-e' 'd ... 'a-n'd- p'a'r'k"w"a'y-s ... w' Iiiiii, the" <br />project limits. These plans will be consistent will) the Uty's Standards and Goneral Plan, the Citys Sconlc Corridor <br />Elements, the Cltys Urban Design Elements, and California's Water Efficient Landscape Ordinance, We will consider City <br />maintenance when developing the design. Landscape and Irrigation plans will be prepared at a scale of IR = 20'horizontal, <br />Dellverables., 30%, 00%, and Final Plans, ofectronto flea In M10fostation V81 and PD� (final plans will IV sealed and <br />signed), and responses to previous review comments train the Cify. <br />Ofty Of SEHAA Ana I TROCM45.17 17 KimleyAMorn <br />25E-1 07 <br />