Laserfiche WebLink
TASK 0: 4100toebritcal StUdles/Fleports/liqrIng — Review existing geotachnicall report and prepare 4 comprehensive gootechnical investigation <br />Including adequate borings; for proper design of proposed work. Obtain required permits to conduct gootecholcall Investigations and perform <br />applicable lob test to provIdle Information necessary for a comprehensive design, A draft copy of thogootoolmital report will be provided to rev' <br />r raw <br />and comment. Traffic control in accordance with WAJ.D.H. Manual. <br />W-lesk Pavement ftaloation— Excluded but maybe rpqviied.for Option B <br />UA-laskesAl Pbut I —Deferred: Acquisition Sorvi* Task <br />W-TatUth Ploso 1. — Deferred. Aquitiflop $0rujues1ask <br />TASK <br />TAS K F: EnvironmentallADECIA) — Fxclushms forbath Options, <br />TASK G: 0111doolVay Acquisition and lampormry.�orstrmrtloa fasoments (TCEs) - Right -of Way4eqWsIftoA Is excludei flZ will Incorporatefire <br />preferred preclso alignment Into the V18 CADD Files. Plans will be evaluated andTCE's would be proVided, If necessary. <br />TASK H: Draluarge - Hultt-Zotlars proposes to imPhlorlobtithe recommendations from the dtaffellywido FLO49D model that accounts for backwater <br />affect$ on the storm 4rain Infrastructure, Sizing ol[thp Infrastructure will be based on both hydrology and hydraulic computations to InT prepared <br />as pad of the drainage report. A pralimioa�* almage toport will be created along With the SO% submittal, Afloat drh inggerhopai Awill treprovided <br />I with the final submittal, <br />TAS K 1: Water Quality Management Plan (WQRP) <br />$uA-bs Ar 1.1 - The design will accoulat for the 50% rule In 00009 MS4 Permit Which requires tivatr0ont,for 50%.Of added or reiplood <br />IMOBIV16US 406C It Will 1101010MOnt 900 street principles to the maximum extent practicable, 11-the underlying sail dose noVinfiftrite we <br />anticipate usingthe parWayto provide blo-filtratloo. HNII[prepare a FrellmoaryWCIMP atthe 30% stagetitat Identify potential locations for <br />LID BMPs and their Interactions with the onsite si . torm0dintietworli. HZ Will develop the Preliminary WOMP Into a Final WOMPtonsistindwfth <br />the Clouoty!s leelmloal guidance MarrualloaccompanytNe final anbrolftal; This -will include an o4ginoWs-ostilmote of probable costs inclusive <br />of material, freight, and maintenance for the selected omps. <br />80-lask UAW— Dderred; Construction Bid Task <br />TASK J.- Plans, Specifications, and Estimates (PSW � HZ will adhere to citycriteria, policies, procedure, and. standards. PS&E Includes three <br />milestone doliverables — 30%, 60%, and Final. Each milostono-will commence after HZ has received review comments from the previous milestone <br />submittal. HZ will meet with the Citiiiffor comments have been reviewed to resolve questions, All plan sheets will be prepared at.20 scale unless <br />otherwise approved and noted, <br />i Saii-rask,41 Street Improvements — HZ will match tire proolso alignment of the constructed street. Plans will Include record information <br />regarding utilities, obstructions, and appurtenant data, <br />$Uh - ro$k 12 Trfiffic 083/9V <br />Street Signals — Excluded <br />tharmolization Plan & Details — Plant will be completed to meet California MOTOD standard, slipago will be evaluated and updated for proposed <br />lone configuration, <br />Temporary Traffic Control Plans — Deferred: Construction Bid Task <br />$#�-Toskl,38tmm Drain Design - Drainage Improvement plans will be prepared at the different milestones. Backbone storm drain profiles will <br />bopmvided along with the 30% submittal. Profiles for lateral storm drains and storm drain dotail sheets will be provided at the 60% and ties[ <br />submittels, <br />Sph-losk.).4 Wall Posign —Deshin of m asonry wall beight as specified by sound report or City but not to exceed 12'feet <br />Sound Report.— Provided by City <br />$0-WA14Stroattightlair &Electrical Vaslin—Typloally existing street lights are owned by SCE. If the proposed improvements 'relocate more <br />than three street lights the proposed lights will be owned by the City of Santa Ana, Street lighting design standards Will be coordinated with the <br />City of Santa Ana prior to commencing th6 design. the design will be per City of Santa Ana lighting standards and cooshloratiorf will be Oven <br />to salvaging the existing light fixtures. <br />iloslga— Conceptual landscape and irrigation plans will be prepared In conformance with City of Santa <br />Angstandards. Ou r landscape designers will work closely with our engineers to plan, design, and coordinate gateway features, public art� traffic, <br />and pedestrian lighting, signage, and site amenities, Our teem will coordinate With the City to responsibly design landscape and Irrigation <br />systems, Planting and Irrigation will be mindful of wgtorconservation standards. <br />HUMMLM City of Santa Ann Civil Engineering Services: RrP 17-083 17 <br />25E-287 <br />