Laserfiche WebLink
CsGPnopowya SAam ANA <br />MILE ONE PROJecT <br />Rehabilitation 0 Crack sealing end repair a Rubberixed HMA (RHMA) <br />• Base r#palr patch digouts overlay <br />• upa, chip, scrub, fog & slurry seals # Nvemont fabric <br />• Mictosurfacing 0 Mill and fills <br />• Rubberized chip seals 0 Cold in-Oloc&recycling (Clk) <br />• Hot MIX asphalt (Hlvl�) overlay 4, Full depth <br />recytilng/rehablittation (FDR) <br />0 $treat reconstruction <br />Traffic signal modifications will ba,made to accommodate bicycle dotgWon, and w4J <br />Ircluderthefallowing: <br />It. S180011-UPOrAdO06? a Qpgraclostquistlog traffic signal lacillos Victso.detection far bicyclists <br />Ploydo A01vollarl Ww traffic signal Oates, if needed and vehicles <br />hom�vejef existing inouttion <br />104psi as needed <br />Our staff Is expIarlepced providing project delivery of federally funded projects, and will <br />assist the City In developing and submitting the following to the! Caltrans: Loca[Assistance <br />Division: <br />4. Federal Aid Ptolect Flild Review JLAPM forms) <br />Requirement$ NEPA/CEQA Environmental Clearance <br />Right of WAY.Cortifitation <br />Utility Cortificm1oh <br />E7�i �ReqUost for Authorization to Pireceedwith Construction <br />.csci staff are khowlediledlatoln bikeway and sireetscapedesign, and take into <br />S. lilkewatrond <br />Streascape Design transit users. CSG Will draw upon poallsheci blkaway daloo (6SQUA;0_0 Such asthe <br />AA514TO ",buldle for the Development af fficycrafactiltite, the NAAcrO Design <br />Guide I <br />., It I* California MUTCD,. and FHWA and Caltrana Guidance. <br />CsG will design ADA upgrades at Intersections when triggered by pavement resiiffacifig <br />6. ADAUpgr4das; - beyond normal mointenante (e.g. Vindarid Inloy): <br />o Curb hamps crosswalks <br />0 Island Passageways <br />00 will Work With the City to, provide Outreach to project stakeholders. <br />4 Preparing exhibits for public meetings <br />7. Stakeholder 0 Lead.yig public meetings to.discuss proposed Improvements <br />Involvament/PublI4 * Attendance at Bicycle and Pedestrian,AdVitory Committee and City C.00rid(Meetings <br />Outreach 4 Notifications prior to construction <br />& Providing access during construction <br />* UrrIted disruption duration <br />Design Approach Checklist <br />C5G hasidentifled a check list for our general design approach for Individual roadway design projecushown <br />below. We make sure to address all of these Items with the agencies we work with to ensure a well managed <br />and designed proliect, <br />• Design kIck off meeting with the City. and record and distribute minutes <br />• Identify permits required andprepare documentation <br />• Right of way research and mapping <br />• Coordination with affected property owners <br />• Povoment Investigations and reporting <br />* Coring and deflection testing (Optional Scope Addition) <br />* Develop Pavement Design Memo providing rehabilitation alternatives and a preferred <br />treatments for design <br />25E-333 <br />