My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSG PROPOSAL RO SANTA ANA <br />MILCONEPROJECT <br />0 'Utility and other stakeholder coordination, mailing letters of Intent, and determination and <br />coordination of any required relocations or conflict resolutions <br />0 AutoCAD base map development, using AutoCAD Civil 3D 2013 <br />0 Field assessments of existing features (with potential field meetings with the City) <br />• Pavement reconstruction limits <br />• Base failure digout locating and marking <br />• Utility adjustment identification <br />• Striping and pavement marking Identification <br />• Concrete curb ramp condition survey <br />• Traffic signal detection locating and Identification <br />• Pedestrian & Bicycle safety and MUTCD compliance needs <br />0 Identification of applicable QV/County/Caltrans Standard Plan details or development of <br />customized construction details <br />0 Develop plans, specifications & estimates for construction (75%, 10D%, and Final Did Package) <br />* 7$% and 100% submittal files to be submitted electronically via email <br />* Final submittal Shall Include hard copies of all documents, plus a CD or US13 thumb drive <br />containing all electronic files. <br />* PS&E submittal review meetings With the City for the 6076 and 90% submittals <br />0 Utility coordination <br />10 Attend the City's Design group to Construction group "Hand-ofr meeting <br />0 Bid phase support <br />0 Construction phase support <br />0 Conduct a "Lessons Learned" meeting <br />Project Coordination and Review Meetings <br />On a weekly or bi-weekly basis throughout the entire project, CSG's Project Manager will act as the single <br />point of contact to coordinate the project with the City. Coordination efforts will consist of conference calls, <br />emails, and any necessary In -person meetings. <br />Effective Communication <br />In addition to the on-goIng coordination, CSG will meet In -person with City staff at the kick off meeting, the <br />30%,60%, and the final review meeting prior to bid document submittal. During these In -person meetings, <br />CSG will meet with the City to review the progress of the project, discuss any review comments provided by <br />the City and stakeholders, review the project schedule and budget, discuss any project Issues with design, <br />and identify action items for all parties. CSG will also be readily available to meet In -person during the <br />bidding and construction phases of the project. <br />Pavement Investigation <br />CSG Is familiar with several methods of pavement maintenance and rehabilitation and will identify the most <br />feasible pavement rehabilitation method that meets the City's needs and budget, <br />Digauts Crack Seallfiepatr PammentilabrIc <br />Starryseal Fog Seal <br />25E-334 <br />
The URL can be used to link to this page
Your browser does not support the video tag.