My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTINFO <br />CHARLIE WKINLEY, PE <br />charIle�vrokInIsy@nvS.com <br />949.585,0477 <br />Project Mansor <br />........ . ........... .. — <br />EXPERIENCIF <br />.. . ........... ... . .... .. ........ . ........................ -- ............. ......... <br />Mt McKinley has more then So years of experience as a Professional engineer for <br />80 years <br />both larg"cale Capital Improvement projects and small Infrastructure Improvement <br />EDUCATION <br />Pitleots. He has 0 broad range Of Project <br />experience With 0 *us on pipelines, pump <br />0s. 1310modical <br />stations, ropervotmand treatment Mr. <br />McKinley brings ari enthusiastic approach to <br />Engineering <br />Planning, (%uWrY Permitting detailed design and operations review to facilitate civil <br />LICIENSES <br />and envImninartal eirginoarIng Projects. <br />Civil EnginderICA) <br />Project Experience <br />1`10.08484 <br />I ...... .......... ............. ... ........ .. <br />i <br />AFFILIATIONS <br />. ...... !",- ....... <br />Coronado Coys.Sawage Lift Station <br />Member, Board of <br />CITY Of CORONADO I CORONADO, CA <br />Directors,.SoWty <br />Task Leader. Mr; McKinley was the task leader for the design of a complete overhaul <br />of American Military <br />of an 870 gpm 60MOrsibta PumPolation. Pumps, oont�qk;, wety.mll tdMfIguiation, and <br />trigineeirai Orange County <br />various facility elements wake replaced with current tachnology as part Of the project, <br />-Post <br />R"mbar, American Public <br />Back Basin Storm Wator Pump Statloor <br />Works Association <br />ELISINORE VALLEY MUNICIPAL WATER WSMICT I LAKE EL$INORt, CA <br />. <br />Proloot Manager. This prqact consisted of the pralliTrinary and final design of a 2,$Oo <br />kiland Empire Chai <br />. pter <br />gPm sWrmwater PumP station to accommodate the evacuation Of stotmweiter from the <br />President <br />,, WateRquse, <br />back basin wetlands during an overflow $vent from Lake Elsinore. <br />Association <br />Mountain Belle PUMP Station and Water Main <br />VISU IRRIGATION DISTRICT I VISrA. CA <br />Project En9l"60f. As Project engineer, Mr. McKinley was responsible for the design <br />of an Int0r-zone transmission moln. Challenging terrain. alignments and steep slope <br />Installations were evaluated, a$ well 88 surge and.fiydiaullos, <br />Fullerton Road Grade Separation.Stormwater and Groundwater Pump <br />Stations <br />ROWLAND WATER DISTPJCT I INDUSTRY, CA <br />Prele0t; Manager. Responsible for the design of &120,500 gpm StDrmwater pump <br />station and a 200 Spin groundwater pump station for the depression of Fullerton Road <br />under UPRR Is 11 mad tinoks. The project Included a hydre ullo onalyaOs of storm and <br />groundwater inflow conditions to. match with outflow hydrographs, and mechanical, <br />electrical, and structural design, Main Pump station Was Permitted by the LACDPW <br />Dudley Sewer Commission Consulting <br />TOWN OF DUDLEY I DUDLEY, MA <br />Proll0crt Manager. Development of design Plans and specifications for three separate <br />sewer extension projects Involving approximately J8,000 feet of gravity sewer, 7,000 <br />feet of force main, and four duplex submersible Pump stations with emergency power, <br />odor control, and several low-pressure service areas with Individual grinder pumps and <br />small diameter force Maine. Mao completed a tow"Ido Comprehensive Wastewater <br />Management Plan, IncludIngobteining State. Revolving Fund loans and performance of <br />hydraulic modeling of the sewer eystani, as well as an on -site system surVe <br />�y <br />25E-526 <br />
The URL can be used to link to this page
Your browser does not support the video tag.