Laserfiche WebLink
Sewer Rehabilitation and Reconstruction Study <br />-Y OF COMPTON I COMPTON, CA <br />On <br />Project Enginier. Work consisted or hydraulic and Physical evaluations of the elty's major sewers (approxftttety46,000 <br />feet of 8,tD 124noh plpe)� The objective we joevOOStOliggmOntsthrrsPlacOmentrOP4[rOrrehoblliteitlon(linlrig).Smer <br />CGTV data was reviewed, and Interviews Were conducted with operations sod maintenance Personnel. Spreadsheets were <br />developed to prioritize the improvements for a multiyear program, Finally, opinions of probable costs were Provided, and <br />the work was presented in a Project Study Report, <br />Wastewater Collection System Upgrade pm To <br />gra <br />CITY OF TORRANCE I TORRANM CA <br />PrOloat Manager. Work consisted -of the completion of several WoJects to upgrade -the City's sower eygtom. The program <br />Included sewer rehabilitation toltimted by a system -Wide video PrQgrsm�. PreParatign of ewer replacement and extension <br />designst end development of q conoePt design for allW ewers. A grease control ordinance was 8180 developed for th.e C <br />Code. ity <br />Fifinnore Sewer interceptors <br />CITY. OF FILLMORE, I FILLMORE. CA <br />E"9100r. Mr, MOKINIRY Was responsible for 1:110004ceptuall design of ne.w sewer Jnterceotbr4to mute 811 flow to a <br />new Waste -water treatment plantafte, Associated diversiOn'taollitles and roadway Infrestruoture for the now alignment were <br />also designed as part of this project <br />Mentorle Boulevard Sower <br />CITY. OF RFDLAN6� I REDLANDS, CA <br />Project Manager. As PIrciect Mainager. Mr. MONlriley lead the planning and design Of 8 SSWer extension on Mentono <br />Boulevard (Aft-SIS), which Is a *major access route 6 Anowhoad/Sig Sea r. Utility coordination And traffic control Were key <br />challenges addreps6d. As a SOPerate project, he alsO completed the design of 5,000186t of sewer dxtenslQn. PNeot <br />components included thaSswer Master PlOhUpdots, Preliminary Design Report, and plans, speolftations, And astiroste& <br />Bushard Trunk Sewer <br />ORANGE OOuNTY SANrrATiON DISTRICT I FOUNTAIN VALLEY, CA <br />Project Manager. Work consisted of the design and construction management of replacing the existing 544nch pipeline <br />with approximately 22,000 LF Of now 2.08-inoh cOncrete-reiriforced Pipe. Tile project Included geotachnical and s1ruotural <br />Pipe design, and coordination with Involved cities for traffic control. <br />University of Connecticut WWTP Upgrade and Sewer System FaCilitles Plan <br />UNIVERSITY OF CONNECTICUT I STORRS, CT <br />PrQJO*t E"91111001. Completion of a sewer system evaluation Survey to Identify reaches with excessive Inflow and Infiltration <br />In the University collection system, An analysis Of flows aithe treatment Plant was completed, as well as a projection of <br />future flows within the study period. A treatment plant upgrade conceptual plan was also developed. <br />Lakewood Boulevard Recycled Water Pipeline <br />CITY Or DOWNEY I DOWNEY, CA <br />Project Manager. installation of a reopled water Main, potable water meter adjustments, and other miscellaneous utility <br />relocations and <br />adjustments associated with the design and construction of.5treat improvements and enhancements <br />along Lakewood Boulevard from Florence Avenue to Telegraph Road. Project was divided Into two 609mants: Lakewood <br />Boulevard between Florence Avenue and Gallatin Road (2,800 fast); and Lakewood Boulevard between Gallatin Road and <br />Telegraph Road (2,700 feet), <br />25E-527 <br />