Laserfiche WebLink
CONTACT IN*O <br />DEREK WIESKEI, PE <br />derekwisakeenv5,com <br />949.685.0477 <br />Quality Assurance/Quillitty control <br />................ .. ........ <br />EXPERIENCE <br />--, . ...... ............... - ........ I . ...... <br />Mr. WiDike has more than 15 Mrs of hands-on okpodlehoe In the development, <br />�6 years <br />design and construction of capital improvement Projects for public agencle H <br />a, is <br />EDUCATION <br />vast catalog of projects Includes roadways and pedestrian Improvementei parks and <br />M,13A, <br />landscaping, water and sewer Infrastructure, and buildings. Mr, Wieske has served In a <br />M4 Civil Engineering <br />variety of roles from City Engineer to Director of Public Works for agencies throughout <br />Southern California Includingthe cities of Long Beach, Laguna Beach, and Lake Forest, <br />8.8� Civil. Engineering <br />Prolect Experience <br />pcmsts.... <br />. ........ . ............ ....... --- . . .. ............ <br />Civil Engineer (CAI <br />he. 4987-2 <br />. ....... . ..... . ....... <br />Downtown Area Resurfacing <br />CITY OF LAGUNA BEACH I LACUNA BEACH, 'CA <br />AFFIUA'nONS <br />Pf0100t Menage'. Mr Weeks oversaw the design and construction of the resuffsping <br />Member, American society <br />of the downtown area of witins Reach. and coWinated with local b'UsIfiesse$ to <br />of CIVII.Engineers <br />minimiza.amnomfo'Impects of constructionJnvidditiontp streetraguriecing, the <br />Member (1091341994), <br />mleot Included, Installation of various traffloolm[rig features, such as bulbouts, <br />StandardsSaiting <br />Mr. Weeks Introduced a bbnmi clause InWtha specifications, which significantly- <br />CDimy"tteeforthe <br />accelerated Project 0009rue0ton, resulting In praise from [Dail shop owners for a <br />successful project. <br />of Regstratlon for <br />PrOesslonal EnfAnadrs <br />Stormwater Diversion SystOrns Installation <br />and ��Dd Surveyors <br />CITY OF LAGUNA BEACH I LAGUNA BEACH CA <br />Member(2002), <br />Project Manager. Mr. Mask& was I�aa';Onslbla for the design and construction of <br />. <br />Countrywide New <br />sto rmwoter separators (Cos Units) to divert urban rune ff from roddway% and the City <br />Developmentand <br />stortndrain system to the municipal sewer cotlection system. C Ifenge i lud <br />he a no ad <br />constrVa"on water Quality <br />working with sewer systems without 6i sruptmg service, and the design of a system that <br />Task Fares <br />can be maintained with relative am. <br />Lexington Drive Road Improvenl6rits <br />CITY OF LOS ALAMMOS I LOS ALAM11M CA <br />Project Manager. Mr. Wieske was responsible fbr the Installation of a half4hile <br />seetion of arterial highway from Wells Avenue to Cerritos Avenue, He reviewed <br />and approved Plans and speolfloatont; and oversaw gill construation managemeryl/ <br />Inspection activities for this project. The Project Involved close coordination With the <br />representatives firom the City of Cypress and an adjacent community ch urch that was <br />funding the roadway improvements. <br />BsIl Road and Sloornfield Street Intersection and Drainage IMProvernents <br />CITY OF LOS ALAMITOS I LOS ALAMITOB, CA <br />P(Q)Oat Manager, Mr. Wieske, served as the project manager for the installation of <br />1,400 LF of storm drain and roadway rebabilitotion. The design alignment of the <br />storm dra In confli cled with multiple utilities, Including sewer, water, gas, electric, <br />and ol I PIP811,163. He oversaw the design of the project, Including 819nifice nt Val Ve <br />Plan <br />engineering, and specification quality control, bidding process, and coordination <br />with partn6ring funding agency, The project required extensive coordination with utility <br />N <br />V15 <br />agencies to either relocate oracjust conflictiag utilities. <br />25E-528 <br />