My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COWACT INFO <br />PHIL KERNPI5 <br />PhIlkerriftV5.0orn <br />Project Engineer <br />... . .... .......... . ....... <br />EXPERIENCE <br />... ......... .. ...... ..... . ..... . .......... .. . .......... .... .. <br />Phil has more than 10 Yftt&of experloncedeSiOnIngand PrOOftingpUblio works <br />Morethan30years <br />Projects. he has Performed Inthecapeoltyrof Frojeotmarlageronp wide vadelyof civil <br />EDUCATION <br />engineering projeots Involving transportation facilities, utility repairs and upgrades, <br />US Civil Englneering�Son <br />and site work..He has been directly responsible for the preparation of grading plans, <br />Infrastructure Improvement planstapecliketione, traffic contro Vphaalng Plans, and <br />Diego $rate University <br />. <br />censUuctirM administration for numerous -complex civil engineering projects, in addition <br />(1983) <br />to having special technical emphasisin the are" of hydrology, hydraulic&. Site and <br />OertilicateCeIEMAftfiety <br />transportation design, NJ,$ capabilities smenhOnc6d by his M for detail and skills in <br />Assessment Program <br />OrgAvilzatl0n, Project Planning, slid written communipatign. <br />Evaluator - #68105 <br />P�qleot Experience <br />LICENSES <br />PWassional Engineer -CA <br />I ... . ........ . ...... ............ . . ...... . ....... ... . ... <br />East Valley Parkway Widening I City Of Escondido <br />#40831 <br />PrOJect Managerfor design of one haff-mile widening of East Valley parkway and Vpiltey <br />Professional Engineer - NV <br />center Road to Prime aderiej Standard% between, Beven Drive and the northbrly city <br />limits where Itiolned Imbrovoinants pwicusly, cDrmtructed by the County. TN& $13M <br />OW4 <br />project will allminate 0 traffic I)ORIOne0k and features 0 bridge Widening, trafflo signal <br />Modificaflonsi StresWcape design, and-preparstion of light of way docume ntsand <br />environmental services, The design ars %Dolispecal care duringthe gporretricapprpyol <br />Phase Of the Project to ensure that the impyovarnsy" were no mom than needed. to <br />accommodate future traftopnWentlens, saying the City capital funds that cotild be <br />SOP1106 to other needls� <br />Melrose Drive Extension I City Of Oceanside <br />QV00-officer for the design of the NesM9 link of Melrose Drive between Spur Avenue, <br />located about one-half mile south OfStPte Route 76, and North Santa Fe Avenue, 300 <br />feet north of 011owbtook Drive'. This 3,000-fouLroadway- extension includes thedesign <br />of a proposed bridge crogallngoM'r Guajome Wke Read and I Som . a Wetland habitat. <br />Additionally, Melrose Drive will be widened for:LW feet between North Santa Fe <br />Avenue and Sagewood Drive. <br />College Boulevard Widening I City of Oceanside <br />Project Manager for Preliminary design of widening of College Boulevard from four <br />to Six lane$ between Olive Avenue and Camino cis is Plate Iry the City Of Oceanside. <br />Efforts included geftebrii; deWgh, detailed field surveying of constraints, slung water <br />quality OMP9 and environmental coordination, <br />San Diego County Women's Detention Facility I County of Son Diego <br />Project manager for preliminary and final civil engirloWing of a design -build project <br />to replace the existing women's detention facility with a state-of-the-art, $ 221 <br />million, 478,OWsq uare-foot facility on a 454acra site. Design challenges Inol ude <br />maintaining operations at the existing Los Golines facility during construction of phase <br />1, stormwater compliance at the riverside site, and obtaining approvals by the local <br />municipality and utilities. <br />25E-529 <br />
The URL can be used to link to this page
Your browser does not support the video tag.