PROPWAL f f t <br />Civic CenterStormwoterLifeStodanRenovadonDesignServices <br />The NOE will be filed with the County Clerk and State Clearinghouse upon approval by the <br />City. This task includes consultation with City staff at the onset of the project to verify the <br />approach and key Issues. This task assumes that a total of two (2) separate Categorical <br />Exemptions will be prepared (one for each lift station). <br />Pre -design Phase Deliverables <br />• Value Engineering Summary—a technical memo (pdf) identifying potential value <br />engineering opportunities. This memo will be used as a basis of agreement on <br />conceptual design. <br />• Progress reports, schedules and Invoices according to the City s requirements. <br />Task 2 — Desian Phase <br />F. Site Plan Design PS&E— Construction Documents. Michael Baker will provide a title sheet <br />and a site plan for each pump station. If adequate record information is not available for <br />the Flower PS, a field survey around the pump station may required for re -grading and <br />Installation of the CDS stormwater treatment unit. The field survey has been Included in <br />Task N under Optional Services. <br />G. Mechanical Design PS&E— Construction Documents. Michael Baker will provide <br />mechanical project design PS&E for both lift stations, including demolition plans, <br />mechanical plans, sections, specifications, and estimate. <br />H. Electrical Design PS&E — Construction Documents. Michael Baker will provide electrical <br />project design PS&E for both lift stations. The electrical design excludes coordination of an <br />Arc Flash Study. <br />SCADA Control Plan Design PS&E — Construction Documents. Michael Baker will provide <br />SCADA project design PS&E for the Flower PS, including design of a new RTU housed in <br />the proposed MCC. It is assumed that the existing RTU will remain at the Santa Ana PS, <br />and will only require minor modifications for the new Instrumentation. The radio path <br />survey recommended in the Preliminary Study is not included in this scope, however, it is <br />recommended this be included in the construction phase of the project. <br />Sheet Lis <br />1 <br />G1 <br />Title Sheet <br />2 <br />G2 <br />General Notes and List of Drawings <br />3 <br />C1 <br />Site Plan - Santa Ana PS <br />4 <br />C2 <br />Site Plan, Grading and Yard Piping - Flower PS <br />5 <br />C3 <br />Civil Details <br />6 <br />D1 <br />Demo Plan - Santa Ana PS <br />7 <br />D2 <br />Demo Plan - Flower PS <br />8 1 <br />1Mechanical Plan & Sections - Santa Ana PS <br />9M2 <br />Mechanical Plan & Sections -Flower PS <br />10 <br />M3 <br />Mechanical Details <br />cmsmzzr� <br />I RTRRRRTIYR AL 20 <br />25B-71 <br />