Laserfiche WebLink
PROPOSAL <br />Civic CenterStormwawLiftStotion RenovatioaDeslgn5ervices <br />rs, inn RF.r � ':A i� T .AeGa <br />11 <br />M4 <br />I Mechanical Details <br />12 <br />S1 <br />I Structural Plan and Section — Santa Ana PS <br />13 <br />92 <br />Structural Plan and Section —Flower PS <br />14 <br />E1 <br />Electrical Symbols, Notes and Abbreviations <br />15 <br />E2 <br />Sin le Line Diagram <br />16 <br />E3 <br />Electrical Site/Power Plan — Santa Ana Pump station <br />17 <br />E4 <br />Electrical Site/Power Plan — Flower Pump Station <br />18 <br />E5 <br />Electrical Conduit and Cable Schedule <br />19 <br />E6 <br />PumD Control Schematic Diagram <br />20 <br />E7 <br />PLC Connection Diagram 1 <br />21 <br />E8 <br />PLC Connection Diagram 2 <br />22 <br />E9 <br />Electrical Details <br />23 <br />11 <br />P&ID Legend <br />24 <br />12 <br />P&ID Diagram 1 <br />25 <br />13 <br />PWD Diagram 2 <br />Design Phase Deliverables <br />• 90% plans — four (4) full size (24" x 36") sets of signed and sealed prints. <br />• 90% Special Provisions (SSPs) — Electronic copy of SSPs in MS Word showing <br />tracked changes. SSPs will include 90% level quantities and estimates, pay item list, <br />and design calculations. <br />• 90% technical specifications - electronic copy. <br />• 90% cost estimate and quantity calculations - electronic copy. <br />• 90% design calculations- electronic copy. <br />• 90% design check calculations- electronic copy. <br />• Final plans - electronic copy. <br />• Final technical specifications - electronic copy. <br />• Final cost estimate and quantity calculations - electronic copy. <br />• Final design calculations. <br />• Electronic files will be provided in their original format and in PDF for all plans, <br />specifications and estimates <br />Task 3 — Permits / Compliance / O&M <br />J. Operations and Maintenance (O&M) Plan/Report. Michael Baker will prepare an O&M <br />Pian that outlines best practices for each facility. It is assumed the Contractor will provide <br />detailed and complete O&M information for the supplied equipment. <br />K. Permits Compliance. Michael Baker will review and recommend which permits are <br />required. Since flow and discharge location of the pump stations will remain unchanged, it <br />is assumed that no permit will be required from the regional water quality control board. <br />Since no equipment that emits air contaminants is proposed in this project, it is assumed <br />that no permit air quality permit will be required. Michael Baker will work with the City to <br />perform the plan checks outlined in the RFP, and will work with other utility and regulatory <br />agencies, including Southern California Edison, to determine if there are any additional <br />plan checks or permits required. <br />mmm <br />INIINNA110NAL 21 <br />25B-72 <br />