Laserfiche WebLink
PAGPOSA! <br />Civic [enter5tormwaterLijtStationRenovation Design 5ervides <br />L. OSHA and/or Other Reouired Safety Traininas & PPEs. Michael Baker will identify and <br />obtain tralnings and Personal Protection Equipment (PPE) required for staff encroaching <br />Into the work area. Training events will be coordinated with the City's staff for joint <br />participation at no cost to the City. It is assumed that confined space entry into the wet <br />wells is not desired by the City, if this is desired, the PPE and training can be provided for <br />an additional fee. <br />Permits / Compliance / O&M Phase Deliverables <br />• O&M manual —electronic copy <br />• Documents required for permit compliance will be provided to the respective agencies. <br />The City will be copied on all correspondence. <br />Task 4 — Bid and Construction Support Services <br />M. Bid & Construction Support. Michael Baker will perform bid support and construction <br />services, as follows: <br />Bid Support. Michael baker will answer questions regarding interpretation of the bid <br />documents and will prepare and issue addenda when required. <br />MeaffngAttendance: Michael Baker will attend construction meetings, as requested by the <br />City. It is assumed the preconstruction meeting will be attended by the Project Manager <br />and the Project Engineer, and two (2) additional construction meetings will be attended by <br />the Project Engineer. <br />Answer Requests for Information (RFls): Michael Baker will provide technical guidance <br />and exhibitstsketches as needed to the City in responding to RFis during construction. <br />Michael Baker will log and track RFIs. Michael Baker is assuming ten (10) RFls for this <br />project. <br />Review Shop Submittals: Michael Baker will review the Contractor's submittals and shop <br />drawings for design intent and general compliance with the Contract Documents. Michael <br />Baker has estimated that the Contractor will submit up to twenty (20) submittals with ten <br />(10) additional resubmittals. <br />As-Builts: Michael Baker will compile all field construction notes, and deviations from the <br />final plan set that occurred during construction into a final full-size set of record drawings. <br />Task 5 — Optional Services <br />N. Field Survey. Michael Baker will conduct a field survey of the Flower PS to provide data for <br />re -grading and addition of CDS Stormwater Treatment Unit. <br />Project Control <br />Horizontal and vertical control will be established at the site sufficient to support final design. <br />Unless otherwise directed by the Client, the basis of horizontal control will be California <br />Coordinate System of 1983 (CCS 83), Zone 6, Epoch 2007.00. Coordinates will be <br />expressed as grid values in terms of the U.S. survey foot. Coordinates will be based on the <br />published values from the National geodetic survey (NGS). Vertical control will be provided <br />Ip TYAM�TIOpLL 22 <br />25B-73 <br />