My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 3:56:55 PM
Creation date
7/17/2018 2:52:30 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC.
Contract #
A-2018-159-06
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GO <br />On•CoTAIT & Associates, <br />Inc, <br />ll Engineering Services <br />SUEZ SIGN: <br />TAITwill carefully reviewed the staffing needs and staff assignments for this project. Of notable <br />Importance In our approach to assignment a project -specific project Manager who will best meet the <br />City's needs for the particular project assignment. Secondly, TAIT will select sub -consultant team <br />members that we have successfully work with on other projects. As an example: LAE Associates could be <br />designated to provide federal funding assistance consultant to ensure the City's documents are <br />processed and approved in a timely manner by Caltrans. <br />4 LAN f, CORE Of W_()fl �' <br />Upon selection of the design team for the contract, TAIT Initiates the preparation of the detailed project <br />scope of work tailored to the needs of the specific project requirements, (see scope of services section) <br />STS 4 EXECUT <br />Upon Issue nce of the Notice to Proceed, TAIT will actively and effectively execute the scope of work for <br />this contract, Our assigned project manager will stay in constant contact with the City and will remain <br />available and responsive to the City's needs through the life of the project, At the heart of each <br />relationship and team member Is effective communication of the rglgs &respons�jallitlos, ttuallCV <br />LWyftrnq_ft ands edulin aedg, <br />Finally, TAIT has clearly defined the scheduling needs on this contract and will cpmmuni.catethe <br />deadlines and needs to each of the team members. <br />STf�P54OUALII'YASSLJBANCE/OUALII'YC TR l' ICRQ 9R[>& <br />An important feature of our design process is our Quality Assurance/Quality Control (QA/QC) Program, <br />TAIT has established clearly defined quality control and quality assurance protocols set In place In the <br />office. As part of our scope of services and fee proposal, we have set aside time to ensure that quality <br />control is Incorporated In to the contract, <br />TAIT assigns a QA/QC Manager to each project to ensure reviews occur prlorto making submittals to the <br />reviewing agency and the.City is provided a quality design. Mr. D, Todd Schmieder, P.F., has been <br />assigned to oversee TAIT's QA/QC Program for this,project, TAIT's QA/QC program focuses on the <br />following four primary objectives: <br />• To ensure that a quality design has been provided by following our In-house design checklists <br />• To verify that different design disciplines have been coordinated <br />• To verify that the proposed Improvements are constructible, and <br />• To verify that a cost effective analysts approach was followed in achieving the client's specific <br />project goals and objectives, <br />TAiT utt)lxes a Total Quality Management approach,-TAIT's philosophy Is that quality control begins at <br />day one and does not enol until the project Is constructed. <br />Quality Control is the respansiblilfy of each and every team member.. It includes the selection of <br />project team members who have demonstrated the ahilltyto understand and apply the project <br />objectives to achieve a specific goal, It requ(res continuous carnrnunications between all parties. <br />TAIT has developed fnternol design eheddists, , Design checldists are used by our design team members <br />as a component, of ourfhm's design process and not solely part of the QC process. <br />Timely Quality Control Reviews are provided. -Before plans are submitted to outside parties, TAIT's <br />QA/QC Manager or his designated QC team member conducts a thorough review to verify the quality, <br />constructabllity and completeness of the submittal. <br />TAIT Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.