My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 3:56:55 PM
Creation date
7/17/2018 2:52:30 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC.
Contract #
A-2018-159-06
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 TAIT & Assoclates, Inc. <br />011-CSII Engineering Services <br />A typical TAIT QAlQC program includes the following steps: <br />• Project Manager (PM) Transmits Design Documents to the'QA/QC Manager • PM Initiates the <br />QC prooess at agreed upon project milestones. <br />• QA/QC Manager conducts initlal revlew- The QA/QC Manager reviews the submlttsl with the <br />PM to obtain project Information and conducts a limited review on the submittal's <br />completeness, <br />• Review of the Submittal –The submittal Is reviewed using TAIT's Internal checklists. Necessary <br />corrections are Identified on the submittal which is returned to the PM. <br />• PM to Addresses QC Comments - The QA/QC Manager and PM review the QC comments to set <br />a course of action. Any proposed Value Engineering (VE) measures are reviowed to determine <br />the appropriate next step (I,e,t Implement the VE measure, review the VE measure with the City, <br />or conduct additional analysis to determine the feasibility and potential cost savings), The <br />reviewed submitted Is then returned to the design team. <br />• PM finalizes' Design Documents for Submittal to the Agency - The PM meets with the design <br />team to monitor progress and Verify Incorporation of the QC comments into the design <br />documents, Deviations from the QC comment are reviewed for acceptance, <br />RELEVANT PROTECT EXPERIENCE <br />On -Call Engineering Contracts <br />IIK' QMNGR COUNTY PUBIAC WORICS�O,&CALL LA -ND <br />PLANNING AND EUGINFim1mq,%qLvLcr,,s <br />County ofOrange, CA <br />TAIT & Assoclates, Inc, (TAIT)was retained by the County of Orange to <br />provide on-call hand Planningand.Engineering Services, TAIT also assists <br />OCPW - OC Planned Communities In the review of development <br />applications for new planned communities In South County, and in the <br />evaluation of County.owned properties for redevelopment opportunitlo6, <br />Qt'H HON^CAtt,,ENGENr�l'RJNC"CON'T C"S <br />• On -Call Engineering, City, County, & Port of <br />San Dlego <br />• On -Call Engineering, City of Newport Beach <br />• On -Call Engineering, City of lake Forest <br />• On -Call Engineering, City of Irvine <br />• <br />On -Call Engineering, Port of Long Beach <br />• <br />On -Call Engineering, Orange County <br />Sanitation District <br />Reference; <br />James Campbell <br />(714)567.7742 <br />Key Staff: <br />PIC; Jacob Vandervls <br />PM: Todd Schmleder <br />PEChris Engelbach <br />client; <br />OC Public Works <br />Costs; Various <br />On -Call project Dates <br />Surveying, 2tl11•Prasent <br />SOCCCD-�--—� <br />On -Gall Engineering, City of Lake Elsinore <br />on -Coil Engineering, City of Mission Viejo <br />Portola Parkway Resurfacing Project <br />Lake Forest, CA <br />TAIT was selected by the City of Lake Forest to provide civil engineering, surveying, geotechnical <br />englncering and federal funding assistance services on the Portola Parkway Resurfacing Projectfrom Alton <br />Parkway to EI Toro Road. The project limits Include a total of 2 miles of artarlal roadway rehabilitation on <br />Portola Parkway which a 6lane arterial roadway with bike lanes extending through the City of Lake Forest. <br />�I1 TAIT, Page 19 <br />., b <br />
The URL can be used to link to this page
Your browser does not support the video tag.