Laserfiche WebLink
TAIT & Associates, Inc. <br />On -Call Engineering Services <br />each alley, prepare of design cross sections at 25' intervals for review of proposed cross falls, preparation <br />of sewer main replacement and lateral replacement plans, field review of all alley locatlonsto field locate <br />existing utIlitIos, conflicts, andjoin locations, Identification of sewer laterals that have been recently been <br />replaced for protection, and tate detalling of all alley approaches for ADA compliance. <br />Citywide Comprehensive Drainage <br />Analysis and CII' Design Projections <br />Diamond Bar, CA <br />TAIT was hired by the City of Diamond Barto analyze, design and recommend <br />pavement and drainage solutions for 11 locations throughout the City which <br />currently experience groundwater seepage problems, The analysis Included <br />field Investigations, geotechnical testing and reporting, pavement design, <br />and the preliminary design and cost estimating for multiple design scanorlos <br />at each project Iodation, The cost estimate Included estimation of the design <br />consultant fees as well as the construction costs for the ultimate design <br />scenarios, <br />Extensive coordination was required on this contract with City, Utility; <br />LACPCD Staff, and private rosldences In order to understand the existing <br />conditions and to project the required design and permitting efforts for the <br />design and construction phase, Upon completion of the report, the city will <br />utilize TAIT's recommendations for future CIP budget and project planning <br />efforts in order to justify the cost and importance of each location, <br />Harbor Boulevard Water & Street <br />Reconfiguration Project: - Garden Grove, CA <br />This project Included street reconfiguration (approximately 7,/3-mlie total <br />length), improvements to an existing raised median, a new traffic signal, <br />abandonment of existing 8•dnth ACP and 12 -Inch DIP City water lines, <br />Installation of a 800 LF of 16 -Inch water line, relocation of SCE and AT&T <br />main distribution service lines, and the installation of new public storm <br />drains and sewer and water services to accommodate a future <br />redevelopment project along Harbor Boulevard from Palm Street to <br />La mpson Avenue in the City of Garden Grove. Lng(neering services required <br />extensive research, review, and a potholing program for the Installation of <br />the new utilities and storm draln Improvements within the existing six -lane <br />Harbor Boulevard roadway, TAIT, working with City Water Department, <br />proposed the Installation of a cut -In valve to ensure continuous water <br />service to a medical facility during the construction of the water line <br />Improvements, The Construction Bid cost was approximately $1,400,000 <br />with a 2013 completion. <br />Reference: <br />Christian Maipica <br />Teh 909-939-7642 <br />Rey Stafft <br />PIC; Jacob Vandervis <br />PM: David Sloan <br />PE Michael Uelagarza <br />Client; <br />City of Diamond par <br />Construction Cost: <br />Approx, $1,5 M <br />Project Dates <br />.2014-2015 <br />Reference; <br />Bill Murray, P.[. <br />Tel: 714.741-5379 <br />Key Staff; <br />PIC: Jacob Vandervis <br />PM: Todd Schmieder <br />Client: <br />City of Garden Grove <br />Construction Cost: <br />$1,4 M <br />Project Dates <br />2012.2013 <br />u <br />ijeTAIT Page 11.1 <br />.,..,...,, I, <br />