Laserfiche WebLink
xy TAIT & Associates, Inc, <br />" II'llj On -Call Engineering Services <br />Project Schedule <br />The fallowing represents a preliminary project schedule for the development of construction documents <br />for the Mlle One project, This preliminary schedule will be reviewed with the City at the project's Kick <br />Off meeting and a final project schedule will be Issued based on those discussions. <br />The project schedule will be made available to all design team members and will monitored on a <br />continuous basis through the project's design life. Any changes to the Schedule will be reviewed with <br />the City and action plans, If necessary, will be developed to prevent schedule delays. The following <br />schedule has been developed based on previous project experiences; <br />Project SchedWp <br />City of Santa Alla • Mlle One Street Projed <br />Preliminary Sahedula <br />10 Talk Name IWraUotxnn finish 811 212018 �ql,A Iola iglr 4,1 <br />..�._......... ..� 1111. 1111.... _,.._,...__..., t <br />1 Awgrd AY CpnkYaet 0doys Mon 4/2/7}1 Mon 4/2jI0 A/Zl_.AtaM..i_./alA_ <br />2 kickoff Meeting Odays Thu 4/5/AS Thu4/5/10 4/S <br />3 NTP Is Issued Oddys Man A/1W1R Mand/16/18 4/AO <br />4 Prepare & Issue Old Documents 124 dayMon 4/16/18 The 1014120 <br />S Records Re llre Initial Design Field is Mon 4/10110 Prl 5/4/10 taxa <br />Walk days <br />_ _G Field Dodge SUMOy Satirical 6dnys Mono/90/38 pA 8/4/18 - <br />7 Prepare 8060 Map 10 days Mon 4/80/18 Fri 5/11/1B 4 <br />....8 Utility Rosearck,Coordlnatlon & Notices 119 day Mon 4/16/18 Thu 0/27/18 <br />9 V11111y Contact list& Notice Preparation Sdays M004/16/18 Pull 4/20/18 t <br />..10 <br />...I Send 1st Utility Notice Oday$ Pr14/20/18 Fri 4/20118 b/ 9 <br />...i�_..I Send 2nd utility Notices Odays 1U07/8/10 Tue7131ul 47/8 <br />ii Send 3rd Utility Notice (AS Needed) Plays Tilu O/27/18 T1109/27/18 09/27 <br />13 Prokolivey badger 17 tiny$Moo 3/14/18 Trio 6/3/10 <br />Id PropOrp pmlimburr/ Layout Plan 10 days Mon 5/14/38 WI 5/25/18 <br />10 City Review Prollminary Layout Plan 5 days Mun 5/28/18 Frl O/1/18 ;- - <br />So Crelen Review Maenng Odgy T-6/ 5/18 T'ue6/s/I8 14/5 <br />a]plena, Spedllwllons; & Eslimalds - e7 days Wad 8/6/18 Thu 30/A/18 <br />l8 . proper. GS%PS&E 20 days Wad 6/6/18 Tee 7/3118 Int <br />18 Conduct Ooeschnlcai Investigations 20 days Wad 5/13/18 Tea 7/10/18 eldSGriIF- <br />20 City Reclow 659PS&E TO days Wad 7/4/18 Too 7/17/18 4 <br />ai- <br />65% poster, Review Meeting O days rhu 7/10/18 Thu 7/19/18 7/1 <br />22 Prepare 100% PAF 30 days Wad 7/18/18 Tea 8/28130 -.Y aTd:k <br />23 iaal interpolatr 060t0<1 5 days Fri 7/20/18 Thu 7/26118 <br />R¢com <br />mendadans <br />City Review 100%PS&E 10 days Wed 8/29/18 Tuo 9/11118 <br />25 100% beslgn Review Meeting Odays 1'Isu O/13/18 Thu P/13/30 4y+j9 b <br />26 Prepare Final PS&E 10 days Fri 0/14/18 Thu 9/27/14 6dl'W <br />2I City Rtivlaw & Approve Final PS&6 Bid 6 days Fr19/28/18 Thu 10/0/18 <br />Documents <br />XS_entai vleftnt bowmontalion 11 days FA 7/27/18 Fri 8110119 1 <br />29 Conduct Environmental Kick Off Meeting Iday Fr1'//27/18 Frl'/%C%/18 <br />.._........ I <br />30 Prepare 88vlrnnmuntol DOCUm¢ntntmn 10 tlays Man 7/30/36 FYI B/10/18 nl <br />312121 Submlt envlr.Dacumentatlan to City Odayc Frl9/10113 Prig/10/18 4b aIle <br />_11 Fedami Funding Aulstence(Optional 110 Mon 4/16/10 Fri 9/14/18 <br />service) days <br />31 <br />Prepare & Submit PES W days Mon 4/I0110 6214/17/18 c r <br />19Celiransllnview&Approve DFB 40 days Mon 4/30/10 Fri 6/27/18 <br />35 prepare &Submit R/W Cort 10 days Man 0/13/'18 Fri 6/29/18 I$5 <br />36 Cpitrans Raview& Approve RJW Cart 40 days Mon 7/2/18 PA 8/24/18 <br />37 prepare & Submit RFA/E46 Application 10 days Mon B)70/18 Fri8/31/18 ,,11 <br />]8 Caltrans R¢vlow & Approve RFAR-76 10 dogs Man 9/9/18 Fri 9/14/18 f:'J <br />'oil y4am'ata kn1e114na O -- <br />LIIYYuk xammvg r" -------I <br />Caluwn rack RS:?il':.Sl:: I:`_vA1 <br />�I <br />TA IT Page 120 <br />