APPENDIX
<br />Resumes
<br />Education
<br />B.S.. civil Engineering
<br />California State University,
<br />Long beach
<br />Year of TAIT Team
<br />Enlistment
<br />1997
<br />Total Experience
<br />32
<br />Certifications
<br />Registered Professlonel
<br />Engineer, Civil V California,
<br />Oregon, Arizona, Utah,
<br />Nevada, North Dakota,
<br />Washington, Hawaii, and
<br />Alaska.
<br />Professional Engineer
<br />California No, C46301
<br />TAIT & Associates, Inc,
<br />On -Call Engineering Services
<br />Jacob Vandervis, PE
<br />PRINCIPAL•IN-CHAP66IPROJECrMANAGER
<br />Mr. Vandervis currently serves as a Vice President/Chief Operations Officer In
<br />TAIT's Corporate Office In Santa Ana. in addition to his management dutlas, he
<br />acts as the primary point of contact for several national retail and residential
<br />developers, Mr, Vandervis is a licensed civil engineer with over 32 years of
<br />experience with land development projects in the western United States, He
<br />has been a member of the TAIT team for the past 21 years, His areas of
<br />expertise Include site design, grading design, drainage studies, water pollution
<br />control plans, erosion & sediment control plans, as well as street Improvement
<br />plans, He Is experienced in site design of all sizes for commercial development,
<br />Involved In preliminary design to develop cost estimates & duo diligence
<br />packages, as well, as experienced In the entltlement phase of projects, HIs
<br />surveying experlence Includes the proparation of ALTA.and topographic surveys,
<br />parcel maps, record of survey and legal descriptions. lie Is a certified Qualified
<br />SWPP Developer (QSD), Certified Development, Design & Construction
<br />Professional (CDP) and Certified Retail Property Executive (CRX)
<br />Harbor Blvd, Reeonfiguratlon, Woter.Main Replace Ment & Utility Relocations,
<br />City of Garden Grove, Princlpal-In•Charge, 2023
<br />Principal -in -Charge of the work being conducted by all TAIT staff to provide
<br />Design knglneoring Service for then $500 k water main replacement and utility
<br />relocation project and the $1 M Street Reconfiguration project In the City of
<br />Garden Grove. Primary responsibilities were to ensure the project was properly
<br />staffed and that the work was completed to the satisfactlon of both TAIT &
<br />Associates as well as the City of Garden Grove.
<br />Phase 1, 2 & 3 Water Main Replacement Design Build Project, Los Angeles
<br />County, Golden State Water Company, Project Manager, 2013
<br />Project Manager & Principal In Charge of the work being conducted by all TAIT
<br />staff to provide Design Engineering Service for then $2.5 M water main
<br />replacement project throughout six locations In Los Angeles County for Golden
<br />State Water, primary responsibilities were to review and stamp design PS&E,
<br />and supervise all staff, contract requirements, and construction coordination on
<br />project,
<br />BeaudryTerrace Water Main Design Build Project, Glendale Water & Power,
<br />Project Manager, 2014
<br />Princlpal-In-Charge to provide Design Engineering Service for then $1,5 M water
<br />main replacement project In the Beaudry Terrace Neighborhood in the City of
<br />�I TAIT Appendix I Page :I
<br />�fl
<br />s
<br />
|