Laserfiche WebLink
AA ?trr� TAIT & Associates, Inc, <br />u; On -Call Engineering Services <br />Glendale for Glendale Water and Power, Primary responsibilities were to review and stamp plans and <br />specifications, supervise design engineers and coordinate with client and contractor through the design <br />and constructlon phases. <br />Monterey Parlc Plaza, Monterey Park, CA, Project Manager, 2015 — present <br />The design of the development includes slope stabi9zaten, retaining wall design, street Improvement <br />design, utility Installation, overall site development, and over 400,000 cubic yards of dirt removal and <br />regrading. The project Involves three geotechnical analysis, The geotechnical analysts Included <br />.recommendations for the design on and near the landfill; for the slope stabilization throughout the site; <br />and for the overall sato development and construction, The project utlIIzed detaligd retaining wall <br />designs and in some areas, pile designs, These retalning walls and pile designs were specially designed <br />near SCE.facilities and towers. Unique construction equipment has been detailed out end coordinated <br />for this construction, <br />Oh -Call Engineering Services, Orange County Public Works, Principal -In -Charge, 2010: Present <br />PrInclpal-in-charge of the work being conducted by all TAIT staff and sub -consultants to provide Plan <br />Check and On -Call Engineering Services for the County of Orange Planned Communities, Primary <br />responsibilities were to ensure the project Is properly staffed and that the work is completed to the <br />satisfaction of both TAIT & Associates as well asthe County of Orange. <br />100 Acre Parcel Development El Toro Marine. Base, Orange County Public Works, Irvine, CA, Project <br />Director, 2009 — Present <br />Prepared Infrastructure assessment of the existing Marine corps base facilities on the southerly 100. <br />acres that had been closed in recent years, Reviewed existing record documents, met with utility <br />purveyors, Inspected existing structures and roadways, and prepared executive summary for <br />presentation to the County of orange for potential reuse of the facilities. <br />Fel Training Coster, Orange County Public Works, Irvine, CA, Principal-In•Charge and Structural <br />Engineer, 2007 -2008 <br />Provided structural design for a 1,,480 square foot masonry block structure to he constructed at new FBI <br />training facility on the former EI Toro Marine Rase, The site Improvements were to include the <br />construction of a new classroom and a covered training area adjacent to an existing structure. 'the site <br />was a former USMC shooting range and was being upgraded by the. FBI. To help minlmize the overall <br />construction cost and to speed up construction, the use of a pre manufactured roof truss for the <br />structure was proposed. The deslgn/build construction of the facility was completed M August 2008, <br />Abridged List of Additional Project Experience by Jake; <br />Y City Nall Underground Fuel Storage Tank Removal and Replacement, City of Irvine, Principal -In - <br />Charge <br />Y Foothill Crossing, City of Rancho Cucamonga (Principal -In -Charge) <br />A Columbus Square Infrastructure Improvements, City of Tustin, (Principal-In•Charge) <br />Entertainment Park, City of Anaheim (Senior Project Manager) <br />I14 TTAITAppendix I Page 2 <br />