The Commons at Quartz Hili, City of Lancaster, Project Engineer, 2015 -Present
<br />Served as the Senior Project Manager forlhis retail center that Includes an k
<br />185,000 SF Walmart Supercenter and 14 outparcels and Is located at the NWC of
<br />Avenue L and 60th Street West in the City of Lancaster, The project Includes
<br />approximately one mile of roadway Improvements, construction of two new "w
<br />traffic signals and modification to one existing traffic signal, construction of 1500
<br />LP of City master pian 60 -Inch storm drain system, approximately 1,5 miles on
<br />new LACWD water lines Improvements and grading, paving and stens drain
<br />iI TAIT Appendix I Page 3 , u
<br />TAIT & Associates, Inc.
<br />,.
<br />On -Call Engineering Services
<br />Fa �
<br />Todd Schmieder, PE
<br />QA-QCMANAGER1SR, PROJECTMANAGER
<br />nI
<br />I
<br />Mr, Schmieder has worked on numerous public infrastructure and private
<br />development projects ranging from small residential and commercial projects to
<br />c
<br />a 30 -mile long toll road, a 40 -acre commercial center, and 1000 -home master"
<br />i
<br />-
<br />planned communities. His project experience Includes plan check services,
<br />2
<br />Education
<br />preparation of feasibility, and site assessment studies, site planning studies and
<br />o
<br />6.5. —Civil Engineering
<br />preliminary and final design plans, tentative and final maps, and environmental
<br />i
<br />Ohio state University, 1080
<br />studios and reports, Mr, Schmieder's technical experience also includes
<br />C
<br />Year of TAIT Team
<br />conducting design reviews, development of traffic signing and striping plans,^
<br />Enlistment
<br />preparation of traffic control and construction staging plans, preparation of
<br />s
<br />2005
<br />construction specifications and cost estimates, and providing construction
<br />management and Inspection, His project management experience Includes
<br />Total Experience
<br />utility coordination, master planning, and project scheduling,
<br />f
<br />38
<br />Orange County Animal Care Facility, County of Orange, Sr, Project Manager,
<br />ut:
<br />Certifications
<br />2016- present
<br />�r
<br />Profeolonal Engineer
<br />Oversaw the preparation of rough and precise grading plans, street plans, sewer
<br />u
<br />California No, C37167
<br />and water plans, fire water protection plans, Water Quality Management Plan
<br />Certificate program In light
<br />(WQMP) and Storm Water Pollution Prevention Plan (SWPPP) for a 10 -acre site
<br />construction and
<br />on the former USMC Tustin Air Station forthe new Orange County Animal Care
<br />development manag©ment
<br />Facility, This project Is the first Design -Build project being implemented in by the
<br />County. TAIT & Assodates, Inc: Is the Civh Engineering Consultant to Snyder
<br />.
<br />University of California--
<br />Langston, the County's Design -Build Contractor, The contract was award in the
<br />s
<br />Irvine Extension, 2004
<br />spring of 2016 and a Rough Grading Permit was Issued by the City of Tustin In
<br />n
<br />Affiliations
<br />July 2016 while the County Animal Care and the Design -Build Contractor
<br />r
<br />E
<br />American Society of Civil
<br />finalized the building and kennel Improvements, Construction of the $28 million
<br />Engineers, Member
<br />facility Isscheduledtpbecompleted byAugust201.6.When completed the
<br />X
<br />foclllty will include a 2 -story 40,000 SF administration building with state ofthe
<br />Building Industry
<br />art veterinary facilities, six dog kennels, special cat housing quarters and a snnalk
<br />Association of orange
<br />corral, Separate parking lots are provide for the public and staff with the staff
<br />parking lot repurposing nearly 1 -acre of existing concrete tarmac, The project
<br />also Includes eight storm water bio-flitratkon basins to treat storm water runoff
<br />s
<br />from the site before It enters the public storm drain system,
<br />4
<br />The Commons at Quartz Hili, City of Lancaster, Project Engineer, 2015 -Present
<br />Served as the Senior Project Manager forlhis retail center that Includes an k
<br />185,000 SF Walmart Supercenter and 14 outparcels and Is located at the NWC of
<br />Avenue L and 60th Street West in the City of Lancaster, The project Includes
<br />approximately one mile of roadway Improvements, construction of two new "w
<br />traffic signals and modification to one existing traffic signal, construction of 1500
<br />LP of City master pian 60 -Inch storm drain system, approximately 1,5 miles on
<br />new LACWD water lines Improvements and grading, paving and stens drain
<br />iI TAIT Appendix I Page 3 , u
<br />
|