Laserfiche WebLink
The Commons at Quartz Hili, City of Lancaster, Project Engineer, 2015 -Present <br />Served as the Senior Project Manager forlhis retail center that Includes an k <br />185,000 SF Walmart Supercenter and 14 outparcels and Is located at the NWC of <br />Avenue L and 60th Street West in the City of Lancaster, The project Includes <br />approximately one mile of roadway Improvements, construction of two new "w <br />traffic signals and modification to one existing traffic signal, construction of 1500 <br />LP of City master pian 60 -Inch storm drain system, approximately 1,5 miles on <br />new LACWD water lines Improvements and grading, paving and stens drain <br />iI TAIT Appendix I Page 3 , u <br />TAIT & Associates, Inc. <br />,. <br />On -Call Engineering Services <br />Fa � <br />Todd Schmieder, PE <br />QA-QCMANAGER1SR, PROJECTMANAGER <br />nI <br />I <br />Mr, Schmieder has worked on numerous public infrastructure and private <br />development projects ranging from small residential and commercial projects to <br />c <br />a 30 -mile long toll road, a 40 -acre commercial center, and 1000 -home master" <br />i <br />- <br />planned communities. His project experience Includes plan check services, <br />2 <br />Education <br />preparation of feasibility, and site assessment studies, site planning studies and <br />o <br />6.5. —Civil Engineering <br />preliminary and final design plans, tentative and final maps, and environmental <br />i <br />Ohio state University, 1080 <br />studios and reports, Mr, Schmieder's technical experience also includes <br />C <br />Year of TAIT Team <br />conducting design reviews, development of traffic signing and striping plans,^ <br />Enlistment <br />preparation of traffic control and construction staging plans, preparation of <br />s <br />2005 <br />construction specifications and cost estimates, and providing construction <br />management and Inspection, His project management experience Includes <br />Total Experience <br />utility coordination, master planning, and project scheduling, <br />f <br />38 <br />Orange County Animal Care Facility, County of Orange, Sr, Project Manager, <br />ut: <br />Certifications <br />2016- present <br />�r <br />Profeolonal Engineer <br />Oversaw the preparation of rough and precise grading plans, street plans, sewer <br />u <br />California No, C37167 <br />and water plans, fire water protection plans, Water Quality Management Plan <br />Certificate program In light <br />(WQMP) and Storm Water Pollution Prevention Plan (SWPPP) for a 10 -acre site <br />construction and <br />on the former USMC Tustin Air Station forthe new Orange County Animal Care <br />development manag©ment <br />Facility, This project Is the first Design -Build project being implemented in by the <br />County. TAIT & Assodates, Inc: Is the Civh Engineering Consultant to Snyder <br />. <br />University of California-- <br />Langston, the County's Design -Build Contractor, The contract was award in the <br />s <br />Irvine Extension, 2004 <br />spring of 2016 and a Rough Grading Permit was Issued by the City of Tustin In <br />n <br />Affiliations <br />July 2016 while the County Animal Care and the Design -Build Contractor <br />r <br />E <br />American Society of Civil <br />finalized the building and kennel Improvements, Construction of the $28 million <br />Engineers, Member <br />facility Isscheduledtpbecompleted byAugust201.6.When completed the <br />X <br />foclllty will include a 2 -story 40,000 SF administration building with state ofthe <br />Building Industry <br />art veterinary facilities, six dog kennels, special cat housing quarters and a snnalk <br />Association of orange <br />corral, Separate parking lots are provide for the public and staff with the staff <br />parking lot repurposing nearly 1 -acre of existing concrete tarmac, The project <br />also Includes eight storm water bio-flitratkon basins to treat storm water runoff <br />s <br />from the site before It enters the public storm drain system, <br />4 <br />The Commons at Quartz Hili, City of Lancaster, Project Engineer, 2015 -Present <br />Served as the Senior Project Manager forlhis retail center that Includes an k <br />185,000 SF Walmart Supercenter and 14 outparcels and Is located at the NWC of <br />Avenue L and 60th Street West in the City of Lancaster, The project Includes <br />approximately one mile of roadway Improvements, construction of two new "w <br />traffic signals and modification to one existing traffic signal, construction of 1500 <br />LP of City master pian 60 -Inch storm drain system, approximately 1,5 miles on <br />new LACWD water lines Improvements and grading, paving and stens drain <br />iI TAIT Appendix I Page 3 , u <br />