My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 3:56:55 PM
Creation date
7/17/2018 2:52:30 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC.
Contract #
A-2018-159-06
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc, <br />100 -Call Engineering Services <br />Improvements for a 363 -acre retail center. Because of downstream storm water concernsthe site was <br />design to capture and Infiltration over 95% of the project's onsite storm water runoff with multiple <br />small baslns along the perimeter, a 1'000 -foot long linear basin along the project's western boundary <br />and a 3 -acre basin capable of detaining and infiltrating a 100 -year storm event, The Site Improvements <br />also Included a half -mile of dry utlllty distribution servlces undergrounding and now Installation along <br />the project's perimeter, The Project's Parcel Map also Included the dedication of roadway right of way <br />for the widening of Avenue L and 670th Street west and the construction of Avenue K-12 (a new public <br />street). <br />Harbor Boulevard Street Reconfiguration, Water Main Replacement & Utility Relocations, City of <br />Garden Grove, Senior Project Manager, 2013 <br />Project Manager of the work being conducted by all TAIT staff to provide Design Eroglneerind Service for <br />then $500 K water main replacement and utility relocation project and the `$ 1 M Street Reconfiguratlon . <br />Project In the City of Garden Grove. Primary responsibilities were to review and stamp the plans, <br />supervlse engineering team, and attend and coordinate project meetings with City staff and other <br />stakeholders,. Project Included Providing Plans Specifications and Cost estimate for City Improvements to <br />Harbor Boulevard that will accommodate the future, redevelopment of several city -owned parcels. This <br />project Included reconfiguration of Harbor Boulevard from Palm Streetto Lampson Avenue <br />(approximately 1/3 -mile total length), Improvements to an existing raised median, abandonment of <br />existing 8 -Inch ACP and 1.2 -Inch DIP City water lines, Installation of a 800 LF of new 16 -Inch water line, <br />relocation of SCE and AT&T main distribution service Ilnes, and the installation of new public storm <br />drains, sewer and water services. <br />A -Town Street Widening, and Sewer Capacity Improvements, City of Anaheim, Sr, Project Manager, 2007 <br />Engineering design.services Included the design of sewer capacity enhancements for over 2 miles on <br />new 15 -Inch and 21 -Inch sewer lines in Katella Ave„ Gene Autry Way and Santa Crux Rd, in the City's <br />Platinum Triangle area. Enereachment permits were obtained from the Orange County Sanitation <br />District for connections to a district sewer line and with Caltrans District 12 (Orange County) for work <br />within Interstate 1.5 rlght of way, The engineering doslgn services also Included the preparation street <br />widening plans for Katella Avenue, State College Boulevard and Gene Autry Way (approximately one - <br />mile) that included a new raised landscape median in Katella Avenue, and the reconstruction of a City <br />Changeable Message Sign, <br />Abridged List of Additional Project Experience by Todd: <br />A Quadrant III Water Line Replacements, City of Chlno, QA/QC Manager <br />A Tustin Metrolink Station Redevelopment, City of Tustin/OCTA, Sr. Project Manager <br />ID iced 14111 Median & Streatscape Feasibility Study, City of Tustin, Sr, Project Manager <br />Y County Regional Park, OC Parks, City of Tustin, Sr. Project Manager <br />F Yorba Linda Water District Sewer Main Replacement, Yorba Linda, CA <br />A Normandie Avenue Water Lino Replacement project, Golden State Water Company <br />Y Antonio Parkway Widening Improvements, County of Orange <br />I111 <br />TAIT' 1 <br />Appendix I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.