Laserfiche WebLink
e; <br />�J TAIT.,Appendix I Page 5 <br />. <br />TAIT & Associates, Inc. <br />On -Call Engineering Services <br />i <br />David Sloan, P,E, <br />+ <br />u <br />PaturcrMANAo'a's <br />As a Project Manager, David Is responsible fo'r supervising staff at TAIT on the <br />j <br />preparation of public and private development projects. David has performed <br />R� <br />and coordinated detailed designs on federally funded arterial roadways, <br />conducted utipty coordination for major relocations on high profile projects and <br />P <br />Education <br />conducted project management efforts on multiple projects throughout the <br />�y <br />Bs Civil Engineering -Tau <br />Sothern California region. David has designed and managed the construction <br />Beta PI Honor Society & <br />for multiple projects In the southern California region and is,an ideal candidate <br />Ir <br />Chi Epsilon, University of <br />to manage this project for the City, David is an effective communicator and <br />k <br />Southern California <br />activelystays In contact with his clients throughout the life of his projects. <br />David has also managed multiple public works construction projects and <br />55 Physical Science, Blola <br />understands the methods and costs of construction. <br />Year of TAIT Team <br />Newport Height Alley & Sewer Reconstruction Project, City of Newport Beach, <br />Enlistmentj; <br />Project Manager, 2015 <br />2014 <br />David is currently acting as the Project Manager to the City of Newport peach <br />fq <br />Total Experience <br />for the Newport Heights Alley & Sewer Reconstruction Project. The project <br />11 <br />Includes the survey, design, and reconstruction of over three miles of residential <br />alleys. The project Is designed in three phases with phase 1 being sewer main <br />°? <br />certifications <br />replacements, and phase 2 & 3 being alley reconstructions within select <br />u s <br />Professional Engineer <br />neighborhoods. The alley replacement design included the geometric and <br />CAlifarnla No. 82505 <br />profile analysis of each alley along with the preparation of design plan and <br />profile sheets for each alley segment, The design also Included the preparation <br />and analysis of design cross sections (via use of Civil 3D corridors) to ensure <br />e <br />design crossfalis alongthe alley are appropriate, The project Is scheduled to <br />a <br />complete phase 1 design In April, 2016, and phase 2 & 3 design in July, 2016, <br />Portola Parkway Resurfacing Project, Project Manager, 2015 <br />a <br />David Is currently serving as the Project Manager to the City of Lake Forest on <br />this federally funded arterial pavement rehabilitation project which Included <br />design engineering, geotechnical engineering, surveying, and federal <br />documentation/ approvals. The project included the rehabilitation of the <br />arterial roadway as well as the identification and replacement of non -ADA <br />compliant or nonfunctional PCC sldewalk, curb ramp, curb and gutter and other <br />Improvements. The design also Included the replacement and updating of the <br />g <br />roadway and bike lane striping throughout the project limits, The project also <br />;b <br />Included the relocation and reconstruction of an existing median at Bake <br />parkway In order to construct an addltlonal'left turn pockot. <br />.0 <br />e; <br />�J TAIT.,Appendix I Page 5 <br />. <br />