Laserfiche WebLink
TAIT & Associates, Inc, <br />On -Call Engineering Services <br />OAyStreat Alley Roca nsttootIan Project (CD 6G) — City of Costa Mesa, Project Enginear, 2010 <br />David served as Project Engineer, providing design engineering and coordinating Topographic Survey <br />and Gootechnieal Investigation services forthis CDOG-funded alley reconstruction project, The project <br />spanned roughly 1,000I.P along Ray 5troat Alley and Ford Road Alley Pians Included plan and profile, <br />cross sections and special detalls. A cost analysis was conducted to provide the City of Costa Mesa with <br />cost -to -lifespan design alternatives, Including Asphalt Rubber Aggregate Membrane (ARAM), Asphalt <br />Rubber Hot Mix (ARHM), Cold -In -Place Recycling (CIR), Full Depth Reclamation & Sub -grade treatments, <br />Full -depth PCC reconstruction with mbar reinforcement was determined to be the most, cost effective <br />solution, <br />Jamboree Road Roadway Rehabilitation Project, City of Irvine, Project Engineer, 2013 <br />David served as Project Engineer forthe City of Irvine to ran abII]to to Jamboree Road, from MacArthur to <br />Camp. The project was located, In the City of Irvine as well as the City of. Newport Reach which required <br />extensive correspondence with both agencies during the design phase, Funding deadlines required an <br />expedited design, -end the design was modiflod cold -way through to eliminate anticipated median Island <br />Improvements on this 119-foot-w1de major arterial, The design Included grind and ARHM overlay, 2,232 <br />tons of 10 -inch FDR, upgrading 9 ramps to meet ADA compliance, loop Installation, and video detection <br />at 2 intersections. <br />FY13/14 Major Street Rehabilitation, City of Pomona, Project Manager, 2015 <br />David served as the Project Manager to the City of Pomona forthelr annual major street rehabilitation <br />project. The project includes the rohabilltatlon of elght arterial and collector segments of roadway <br />throughout the City. The project required analysis of the existing pavement conditions, <br />reeommendatlon of alternate rehabilitation methods by use of recycled pavement options, obtaining an <br />SCRRA'railroad encroachment permits, upgrading of 4 roadway segments In add new blke lanes and the <br />analysis and replacement of all curb ramps along the project limits. <br />Parking Lot Rehabilitation for the City of Diamond Oar, Project Manager, 2015 <br />David served as the Project Manager and Construction Manager to the City of Diamond Oar for <br />expansion and reconstruction of two public park parking lots. 'rho design Included the analysis of traffic <br />flow, preparation of a geotachnical Investigation, design of water quality management plan and <br />hydrology, and the preparatlon of detail PS&E for the construction of the proposed Improvements, <br />Culver Drive Pavement Rehabilitation Project --City of Irvine, Project Engineer, 2011 <br />David served as project Engineer, providing PS&E to the City of Irvine on the Culver Drive Rehabilitation <br />Project, The project spanned 1,800 LF along Culver Drive, from the north railroad tracks to Walnut <br />Avenue, Culver Drive Is a principal arterial roadway, providing northeast/southwest access through the <br />western portions of the City of Irvine, while also serving as a primary travel route through a Variety of <br />commercial, residential and institutional zoning areas. David designed localized pavement <br />reconstruction at the Northbound I13 lane and the southbound Jfi lane, where pavement conditions <br />were considerably worse than adjacent lanes; the length of the project was treated with full width 2 - <br />Inch grind, a 2 -Inch AC leveling course and 2 -Inch ARHM overlay, The project also entailed removing and <br />replacing the existing median shed gutter with a standard 8 -Inch median curb, median Island landscape <br />Improvements, and ensuring ramps throughout the project were ADA compliant, <br />�� TAIT Appendix I Page <br />