Laserfiche WebLink
City of Sang Ana ........ <br />John Hidalgo, RLA <br />Landscape Architecture Task Leader <br />Profile Summary <br />Education. BS, Landscape Architecture, California State Polytechnic University, Pomona <br />European Study Tour, Callfarnla Polytechnic State University, School of Architecture, Pomona <br />Reglstratlow Landscape Architect, California No. 36511 <br />Licensed Contractor, California C-27 No, 713513 i <br />Affiliations; American Society of Landscape Architects <br />California Parke and Recreation Society <br />Califomia Landscape Contractors Association <br />Experience: 24 Years <br />Mr. John Hidalgo possesses In-depth expertise in landscape architecture design development, preparation <br />of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo Is familiar with various <br />local, state, and federal codes, regulations, procedures, and standards relating to conatruction, safety, park <br />and facility planning, and other landscape and Irrigation amenities. He has successfully completed projects <br />In compliance with these various standards. Mr. Hidalgo has experience representing project owners during <br />the plan review process. He possesses comprehensive experience in both field observation and construc- <br />tion. Mr. Hidalgo responsibilities Include managing park and street beautification design, low -Impact devel- <br />opments, plan reviews, and construction observation. <br />L., <br />Relevant Project Experience <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Landscape Architecture <br />Task Leader responsible for providing and overseeing all landscape and irrigation design required for the <br />expertise and knowledge in current landscape design Ideas for drought -adaptive landscape and Irrigation <br />r+ <br />technology. The Improvements involved roadway widening from four to six lanes; pavement rehabilitation; <br />` <br />landscape and hardsoaps medians; median lighting; sidewalk, curb and gutter, and driveway approach re- <br />construction; ADA-oompllant ramps; parkway trees; artistic elements, corridor entrance monument; bus <br />shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic, pavement, <br />and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility reloaa- <br />u <br />tion, <br />Orange Line Extension, Brutoco Engineering & Construction, InoJLos Angeles County Metropolitan <br />j <br />Transportation Authority, Los Angeles, California, Landscape Architecture Task Leader responsible for <br />providing and overseeing all landscape and irrigation design required for the design/build of the MCL exten- <br />y <br />sion from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Per- <br />formance of these responsibilities required expertise and knowledge In working with the City of Los Angeles <br />and the Metropolitan Transportation Authority guidelines and procedures. Wllldan prepared plans, specifics- <br />.q <br />tions, and estimate for street widening, raised landscaped medians, irrigation system, ADA access cur b <br />ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication <br />conduits, and signing and striping, <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Landscape Architec. <br />•- h <br />4 <br />ture Task Leader responsible for providing and overseeing all landscape and Irrigation design — along with <br />Illustrative graphic concept presentations to the City Council — required for the improvements between Cerri- <br />tos Avenue and Katella Avenue, Performance of these responsibilities required expertise and knowledge in <br />graphic design and photographic view simulations of before -and -after scenarios. Improvements involved <br />raised median, pavement delineation, landscape and Irrigation improvements, street lighting and traffic slg- <br />nal improvements at Intersections with Florists Street and Sausalito Street, <br />_+ <br />M <br />4, <br />Proposal forOn•Gall Englneering, <br />Comprehensive. Innovollve. Trusted, RFP No. 17-083 <br />