City of Sang Ana ........
<br />John Hidalgo, RLA
<br />Landscape Architecture Task Leader
<br />Profile Summary
<br />Education. BS, Landscape Architecture, California State Polytechnic University, Pomona
<br />European Study Tour, Callfarnla Polytechnic State University, School of Architecture, Pomona
<br />Reglstratlow Landscape Architect, California No. 36511
<br />Licensed Contractor, California C-27 No, 713513 i
<br />Affiliations; American Society of Landscape Architects
<br />California Parke and Recreation Society
<br />Califomia Landscape Contractors Association
<br />Experience: 24 Years
<br />Mr. John Hidalgo possesses In-depth expertise in landscape architecture design development, preparation
<br />of plans and specifications, plan reviews, and construction observation. Mr. Hidalgo Is familiar with various
<br />local, state, and federal codes, regulations, procedures, and standards relating to conatruction, safety, park
<br />and facility planning, and other landscape and Irrigation amenities. He has successfully completed projects
<br />In compliance with these various standards. Mr. Hidalgo has experience representing project owners during
<br />the plan review process. He possesses comprehensive experience in both field observation and construc-
<br />tion. Mr. Hidalgo responsibilities Include managing park and street beautification design, low -Impact devel-
<br />opments, plan reviews, and construction observation.
<br />L.,
<br />Relevant Project Experience
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Landscape Architecture
<br />Task Leader responsible for providing and overseeing all landscape and irrigation design required for the
<br />expertise and knowledge in current landscape design Ideas for drought -adaptive landscape and Irrigation
<br />r+
<br />technology. The Improvements involved roadway widening from four to six lanes; pavement rehabilitation;
<br />`
<br />landscape and hardsoaps medians; median lighting; sidewalk, curb and gutter, and driveway approach re-
<br />construction; ADA-oompllant ramps; parkway trees; artistic elements, corridor entrance monument; bus
<br />shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic, pavement,
<br />and drainage engineering; landscape architecture, survey and right-of-way engineering; and utility reloaa-
<br />u
<br />tion,
<br />Orange Line Extension, Brutoco Engineering & Construction, InoJLos Angeles County Metropolitan
<br />j
<br />Transportation Authority, Los Angeles, California, Landscape Architecture Task Leader responsible for
<br />providing and overseeing all landscape and irrigation design required for the design/build of the MCL exten-
<br />y
<br />sion from the Chatsworth Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Per-
<br />formance of these responsibilities required expertise and knowledge In working with the City of Los Angeles
<br />and the Metropolitan Transportation Authority guidelines and procedures. Wllldan prepared plans, specifics-
<br />.q
<br />tions, and estimate for street widening, raised landscaped medians, irrigation system, ADA access cur b
<br />ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication
<br />conduits, and signing and striping,
<br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Landscape Architec.
<br />•- h
<br />4
<br />ture Task Leader responsible for providing and overseeing all landscape and Irrigation design — along with
<br />Illustrative graphic concept presentations to the City Council — required for the improvements between Cerri-
<br />tos Avenue and Katella Avenue, Performance of these responsibilities required expertise and knowledge in
<br />graphic design and photographic view simulations of before -and -after scenarios. Improvements involved
<br />raised median, pavement delineation, landscape and Irrigation improvements, street lighting and traffic slg-
<br />nal improvements at Intersections with Florists Street and Sausalito Street,
<br />_+
<br />M
<br />4,
<br />Proposal forOn•Gall Englneering,
<br />Comprehensive. Innovollve. Trusted, RFP No. 17-083
<br />
|