Laserfiche WebLink
ON -CALL ENGINEERING SERVICES ' ` <br />Waldo Flesourga5— Opllo,rA � <br />pumping redevelopment and pumping tests on a part-time basis; preparation of the <br />recommended new pumping rate and depth setting for the new pump; observe the final well <br />video survey;, and prepare a summary of well rehabilitation operations report, <br />Task 6, Basis of Deslgn - Tetra Tech will prepare a Basis of Design Report summarizing the <br />findings of the well assessment, necessary well modifications, the pipeline design requirements, <br />and the pipeline alignment selection. The Basis of Design Report will include the following <br />issues: <br />• Overall evaluation of the existing well based on current operation and City standards. <br />• Recommended well rehabilitation. <br />• Recommended well modifications required to pump water directly into distribution system <br />instead of into adjacent reservoir: size of pump/motor; pump to waste; etc. <br />• evaluation of chlorination facilities and any recommended modifications. <br />• Evaluation of site layout, access issues, piping modifications, etc, <br />• Evaluation of existing electrical facilities and recommended upgrades. <br />• evaluation of existing communications and controls. Recommend upgrades. <br />• Identify any hydraulic issues for the change in well operation. <br />• Update the well Operational Functional Specification for the well (an Optional Task), <br />• Summarize the alignment analysis and the recommended alignment selection. <br />• Determine pipeline material: PVC for water main (unless restrained Joints are required and <br />DIP is recommended); fend PVC (SDR-35) for the sewer main (unless depth is greater than <br />10 to 12 feet and extra -strength VCP is recommended). <br />• Summarize the preliminary staging for construction and traffic management plan. <br />• Identify all permits and time frames for processing said permits. <br />• Prepare preliminary estimate of probable construction costs. <br />Tetra Tech will prepare preliminary drawings (30% milestone) for both the pipelines and well <br />rehabilitation as part of the Basis of Design Report, <br />Task 6; CEQA Documentation - Tetra Tech will prepare documentation required to fulfill the <br />California Environmental Quality Act (CEQA) requirements. We have assumed an Initial Study <br />(IS)/Proposed Mitigated Negative Declaration (MND) will be required as was in the RFP for both <br />Well No. 32 and Well No. 29 Rehabilitation Projects. However, on similar past projects where <br />the rehabilitation of the well was minor and no building modifications were required, a Notice of <br />Exception was only required as the project was only replacing an existing facility with no <br />appreciable upsize in capacity, "rho following Is a brief summary of the anticipated scope of <br />work for the IS/MND: <br />• Technical studies for air quality/greenhouse gas and noise are Included, as well as <br />biological resources letter report. <br />• Perform project initiation and organization, <br />• Prepare project description. <br />• Prepare and submit administrative Draft IS/MND using the CEQA checklist. <br />• Prepare revisions, produce and circulate Draft IS/MND• <br />• Prepare draft responses to public comments, and compile and submit final IS/MND. <br />Task 7, 60% Construction Document (P5&E) Submittal - Tetra Tech will prepare 60% <br />design plans, specifications and estimate of probable construction costs (PS&E's) in <br />accordance with the approved criteria as outlined in the Final Basis of Design. Two (2) hard <br />copies of full size plan sets, four (4) hard copies of half-size plan sets and one electronic pdf <br />City of Santa Ana -14• - TETRA TECH <br />