Laserfiche WebLink
NTETRATECi-p Kyle Bohn, PIE <br />design Engineer <br />Mr. Bohn has provided design engineering in various water and <br />Education: <br />wastewater projects including domestic and reclaimed Water <br />B.S., Civil Engineering, <br />pipelines, water main replacements, gravity sewer mains, CIPP <br />university of California, Irvine, <br />sewer lining, pump stations, lift stations, reinforced concrete <br />2p06 <br />reservoirs, flow control facilities, and pressure reducing valve vaults. <br />Rogistrationsrne,,rtifioationet <br />Responsibilities have Included preparation of construction plans, <br />specifications, and design calculations; assisted supervisors in <br />Registered Civil Engineer, <br />preparing project memorandums; organized office technical library. , <br />2011, California No. 77984 <br />Emtelle flberflow, Design and <br />EXPERIENCE <br />Engineering Certification <br />Newport Boulevard Water Main Rehabilitation, City of Newport <br />Office: <br />Beath, 'CA— Provided engineering support for the <br />Irvine, California <br />replacement/rehabilitation of the existing 20/16-inch cast iron pipeline <br />constructed in the mid-1920s within Newport/Balboo Boulevard from <br />Years of Experience: <br />the Intersection of Via Oporto and Central Avenue to the intersection <br />12 <br />of Balboa Boulevard and 411 Street. This pipeline is vital as It <br />provides water and fire flow protection to the businesses and <br />Years with Tetra Tacit: <br />residents in the Newport Bay and Peninsula area. <br />12 <br />GSWC Waterline Replacement Projects 2010, Golden State <br />Water Company, City of Hawthorne and County of Los Angeles, <br />CA — As Design Engineer, assisted with completing design plans for <br />several water main replacement projects throughout the GSWC <br />service areas primarily the Southwest District, The work was completed as part of a design -build <br />contract teamed with Precision Pipeline. Work included; existing utility research and base map <br />preparation, determining abandonment required, alignment selection and field check surveys, <br />interaction with GSWC project manager with plan check comments, and obtained permit conditions <br />for construction for various affected cities. Project locations included City of Hawthorne and County <br />of Los Angeles. Streets Included; Budiong Avenue, Kornblum Avenue, 132nd Street, and Doty <br />Avenue: Total water main footage was approximately 6,000 feet of 12- through 16-inoh pipe. <br />Water Line Replacement Projects, City of Lakewood, Lakewood, CA .- Design Engineer for the <br />preparation of plans and specifications of multiple water line replacement projects for the City of <br />Lakewood, Projects included preparation of plans, specifications, and cost estimates for over 60,000 <br />linear feet of 6- to 12-inch pipeline, <br />Centennial Park Neighborhood Water Main Improvements, City of Santa Ana, Santa Ana, CA -- <br />Design Engineer for approximately 20,000 linear feet of B-Inch PVC water main to replace existing <br />water mains, <br />Central City Water Main Improvements, City of Santa Ana, Santa Ana, CA -- Design Engineer for <br />approximately 6,600 linear feet of 8-inch PVC water main to replace existing water prams. <br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA — <br />Design Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water <br />District's - Recycled Water Distribution System Expansion Project The pipelines ranged in size <br />from 4-inch to 20-Inch In diameter, and convey up to 775 acre-feet of tertiary treated recycled <br />water per year. The major customer being served recycled water is the Laguna Woods Village <br />Home Owners Association (formerly Leisure World), <br />Well No. 27, City of Orange, Orange, CA — Design Engineer for the drilling and equipping of <br />Well No. 27, a new potable water well (930 feet deep). The project Involved the partial <br />