NTETRATECi-p Kyle Bohn, PIE
<br />design Engineer
<br />Mr. Bohn has provided design engineering in various water and
<br />Education:
<br />wastewater projects including domestic and reclaimed Water
<br />B.S., Civil Engineering,
<br />pipelines, water main replacements, gravity sewer mains, CIPP
<br />university of California, Irvine,
<br />sewer lining, pump stations, lift stations, reinforced concrete
<br />2p06
<br />reservoirs, flow control facilities, and pressure reducing valve vaults.
<br />Rogistrationsrne,,rtifioationet
<br />Responsibilities have Included preparation of construction plans,
<br />specifications, and design calculations; assisted supervisors in
<br />Registered Civil Engineer,
<br />preparing project memorandums; organized office technical library. ,
<br />2011, California No. 77984
<br />Emtelle flberflow, Design and
<br />EXPERIENCE
<br />Engineering Certification
<br />Newport Boulevard Water Main Rehabilitation, City of Newport
<br />Office:
<br />Beath, 'CA— Provided engineering support for the
<br />Irvine, California
<br />replacement/rehabilitation of the existing 20/16-inch cast iron pipeline
<br />constructed in the mid-1920s within Newport/Balboo Boulevard from
<br />Years of Experience:
<br />the Intersection of Via Oporto and Central Avenue to the intersection
<br />12
<br />of Balboa Boulevard and 411 Street. This pipeline is vital as It
<br />provides water and fire flow protection to the businesses and
<br />Years with Tetra Tacit:
<br />residents in the Newport Bay and Peninsula area.
<br />12
<br />GSWC Waterline Replacement Projects 2010, Golden State
<br />Water Company, City of Hawthorne and County of Los Angeles,
<br />CA — As Design Engineer, assisted with completing design plans for
<br />several water main replacement projects throughout the GSWC
<br />service areas primarily the Southwest District, The work was completed as part of a design -build
<br />contract teamed with Precision Pipeline. Work included; existing utility research and base map
<br />preparation, determining abandonment required, alignment selection and field check surveys,
<br />interaction with GSWC project manager with plan check comments, and obtained permit conditions
<br />for construction for various affected cities. Project locations included City of Hawthorne and County
<br />of Los Angeles. Streets Included; Budiong Avenue, Kornblum Avenue, 132nd Street, and Doty
<br />Avenue: Total water main footage was approximately 6,000 feet of 12- through 16-inoh pipe.
<br />Water Line Replacement Projects, City of Lakewood, Lakewood, CA .- Design Engineer for the
<br />preparation of plans and specifications of multiple water line replacement projects for the City of
<br />Lakewood, Projects included preparation of plans, specifications, and cost estimates for over 60,000
<br />linear feet of 6- to 12-inch pipeline,
<br />Centennial Park Neighborhood Water Main Improvements, City of Santa Ana, Santa Ana, CA --
<br />Design Engineer for approximately 20,000 linear feet of B-Inch PVC water main to replace existing
<br />water mains,
<br />Central City Water Main Improvements, City of Santa Ana, Santa Ana, CA -- Design Engineer for
<br />approximately 6,600 linear feet of 8-inch PVC water main to replace existing water prams.
<br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA —
<br />Design Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water
<br />District's - Recycled Water Distribution System Expansion Project The pipelines ranged in size
<br />from 4-inch to 20-Inch In diameter, and convey up to 775 acre-feet of tertiary treated recycled
<br />water per year. The major customer being served recycled water is the Laguna Woods Village
<br />Home Owners Association (formerly Leisure World),
<br />Well No. 27, City of Orange, Orange, CA — Design Engineer for the drilling and equipping of
<br />Well No. 27, a new potable water well (930 feet deep). The project Involved the partial
<br />
|