Laserfiche WebLink
-.City of5antatAna C» <br />N Submit 30-, 60-, and 100 -portent plans to those utility companies with facilities In immediate project area for , <br />review and comment, <br />• Coordinate with utility companies to implement upgrade of facilities (upon request), as needed, within project <br />limit and Maintain contact log. I <br />• Determine any utility upgrades or installations that will be required to service existing and proposed Improve- <br />ments and coordinate installation of required upgrades with each affected utility company Id <br />• Lead efforts to identify ownership of unknown utility lines <br />Task 3 - Environmental Compliance and permits — Option A and Option S <br />it is anticipated that the projects will qualify for Categorical Exemption Section 16301 Class 1(c) under existing <br />highways and streets Improvements that allows for roadway Improvements for the purpose of public safety and <br />has no significant effects on the environment, Willdan will perform Its due diligence as part of this task to verify <br />exemptions criteria set by California Environmental Quality Act (CEQA) under Article 19 of Categorical Exemp- <br />tions and make necessary recommendations to the City. The Clty's Planning Division will make the final environ- <br />mental determination. To satisfy CEQA requirements for the project, Willdan will prepare a notice of exemption, <br />for the City's use, We will assist with posting of the notice and with tiling the Notice of Exemption with the County <br />Clerk, <br />If Willdan believes that further detailed environmental studies and reports are needed to comply with CEQA and i <br />or National Environmental Protection Act (NEPA), subject to confirmation by City Staff, Willdan will meet and dis- <br />cuss with the applicable resource/regulatory agencies to confirm the necessary work effort and Identify the cost <br />and schedule to prepare the environmental reports, applications for <br />permits and obtain clearance through all applicable agencies as addi- J Task 3 Deliverables <br />tional scope of work, As part of Olean Water Act, a NPDES permit CEQA Categorloal Exemption <br />may be required for alternate discharging during well rehabilitation. Form <br />r-� <br />Task 4 — Preliminary Enginoodrng — Option A and Option R <br />Subtask 4.01 — Site Visit and Evaluation. Visual Inspection is important for quality assurance and ensures a <br />site facilities and constraints. Willdan will catalog existing conditions and facllltles through photographs and field <br />r' <br />notes to be used as a reference during design. <br />l.i <br />An initial assessment will be performed to evaluate the existing condition of the water well, Based on the initial <br />evaluations, rehabilitation options will be proposed. The entire well will have to pulled and the casing will have to <br />be video inspected. Common causes of reduced well capacity could be sanding, rupture of casing, mineral build• <br />LJ <br />up, heavy encrustation, screen damage, screen clogging or mechanical failures of the pump. Depending on the <br />assessment, rehabilitation could include brushing and bailing casing, replacing ruptured casing, adding an elon- <br />r? <br />gated nozzle to bull to reduce sand flow, chemical treatment, remachine the pump and or rewind. Afterthe initial <br />LJ <br />evaluation, Willdan will work with City's current maintenance and repair contractorto rehabilitate the well or will <br />work with the City to bid out the project, <br />Subtask 4,02 — Field Survey and Right -of -Way. Wllidan will perform a field survey to ensure the accuracy <br />and constructability of the final construction plans, For this project the survey will: <br />Establish right-of-way through record research and/or survey, <br />r� <br />• Option A: Ground Survey to map the existing facilities and utility Subtask 4.02 Deliverables <br />j <br />alignment. The utility survey will include manholes, covers, and • One electronic copy of all field sur - <br />depth of cover when required, vey data In Mlorostation VBI format <br />n <br />• Option B: Topographic/ground survey will be required to deter- <br />mine existing grades and facilities. To ensure acceptable cross -slopes full street sections will be surveyed <br />ti <br />and analyzed at 25 -foot intervals, driveways, and at approaches. The topographic survey shall extend a minl- <br />mum of 200 feet beyond limits of oonstruotion within the public right-of-way, where possible. Full street sec- <br />! <br />tions include obtaining field data at all control or critical points, such as CL, BCR, ECR, and at any grade <br />r <br />breaks between lips of gutters, and/or edges of pavement, and flow lines; Where applicable to the project <br />scope, survey'of private property Improvements shall be Included. <br />Subtask 4.03 — Geotechnical Investigation and Pavement Rehabilitation Strategies. All geotechnlcal <br />Investigation and analysis shall be performed by a state -licensed geotechnical engineerwith expertise in pave- <br />ment design. Willdan will conduct geotechnical Investigations to measure the existing pavement sections and <br />r• <br />collect representative samples of subgrade soils for laboratory testing as described below. The taslc work In- <br />ti <br />cludes: <br />Proposal for on-call Engineoring, T^ <br />Comprehensivo, Innovative, nlusted. <br />RPP No. A7.083 4J <br />