Laserfiche WebLink
24 of Lm ma Ana <br />Field exploration including coring, drilling, and sampling at three locations to the maximum drilled depth of 10 <br />feet below ground surface within the limits of the project site, Upon reosipt of notice to proceed, a site visit <br />j <br />will be performed to markthe core/boring locations and evaluate access conditions for drilling equipment, <br />Willdan will call USAfor underground utility locating at least 46 hours before any field work Is performed, <br />However, all available subsurface utility Information should be provided/ Identified prlorto initiating field ex• <br />ploratlon to reduce the potential for damaging existing utilities, Traffic control will be provided during drilling <br />Borings/cares will be measured and visually logged in the field by an experienced representative. The log will <br />include pavement sections thlokresses and subgrade conditions. The samples will be transported to Will - <br />clan's gaotechnicai laboratory for testing, <br />Laboratory testing of collected representative subgrade soils will determine their index and engineering prop. <br />ertles, <br />Option A; Gootechnloal Investigation will be used to identify the soil properties for the trenching and backfill of <br />proposed utilities, <br />M Option B: Providing recommendations for alternative now pavement sections. <br />■ Option B: Performing a percolation test within a boring Subtask 4.03 Dellversbles <br />drilled to a depth between 5 and 10 feet for BMP and green . Three hard D les ra draft eotechnicai <br />streets Implementation (If needed), p g <br />Providing a draft report and presenting our findings, conclu- report and one electronic PDP copy <br />sions, and recommendations for review by the City. After Three hard copies of final geotechnical <br />i receiving the City's comments, a final report Incorporating report and one electronic PDF copy <br />the comments will be provided to the City, The report will be supported with a map Illustrating boring/oore to - <br />cations and a summary of laboratory test results, <br />Subtask 4,04 — Preliminary Design Report Willdan will compile a Preliminary Design Report (PDR) for <br />review and approval by the City. The report will contain a summary of 9 Subtask 4.04 Dellverablas <br />the initial reconnaissance notes, utility provided information, field survey Preliminary Design Report <br />I findings, any photographs of conditions for discussion, and the base de- <br />sign concept with preliminary construction cost estimate. The report will be disoussed with City representa- <br />tives to make reliable, cost effective decisions about the proposed street Improvements, water and sower re- <br />habllitation/replacement methods. <br />During preparation of the PDR, Willdan will review existing information, such as the pavement management <br />report, city sewer and water documents and field review of the street to make recommendations regarding <br />the construction needs, including the location and extend of missing or damaged sidewalk, curbs and gutter, <br />access ramps, driveways, sewer and water repairs, in addition, the report will address the disposition of <br />existing utilities and coordination, and anticipated requirements, <br />! Task 5 — Plans, Specifications, and Engineer's Estimate - Option A and Option Q <br />Subtask 5.01 — Construction Plans. <br />! Willdan will prepare conceptual plans for City review, corn- ® Task 5,01 Deliverables <br />ment and approval, Upon approval of the concept plans, w Three hard copies of full-size conceptual plan <br />the final design phase will be Initiated. Willdan will submit layout and one electronic PDF format <br />plans at the 30-, 60-, and 100 -percent levels of comple- " Three hard copies of full-size and half-size plan <br />! tion. The City will provide review comments at all design submittals at 80-, 60-, and 100 -percent comple- <br />stages, Willdan will address comments received from the tion milestones, one electronic PDF copy, and <br />submittal reviews, including comments received from one electronic Microstatfon copy in V6i format, <br />other affected agencies and utilities. Wlllclan will submit one, original, signed set of full-sized plans, a signed, un- <br />bound, set of final specifications, and a copy of the final enginser's opinion of construction cost to the City. One <br />set of Mylars will be produced after 100% plans are approved by the City (upon request), Plans will conform to <br />City standard plans and CARD standards and be prepared utilizing Mld"rostation V81 software, <br />Option A: The plans be prepared In sufficient detail to bid the rehabilitation of the Identified well -- method to be <br />determined by the City after review of the assessment report — and the proposed sewer and water facilities. Util- <br />Ity plans will be drafted at 40 -scale and plans will display all referenced standard plans Including trenching de - <br />tells. <br />Option B: The plans will consist of a Title Sheet/ Typical notes, Roadway Plans, Construction Details, Signing <br />and Striping, Landscape, and Storm Water Biofiltration (if required In complete streets), The Roadway Plans will <br />k"', Proposal for On-call Engineering, 28 <br />(I t A Comprehensive. Innovative,Trustod, RFP No, 17-088 <br />—i <br />