<br />Field exploration including coring, drilling, and sampling at three locations to the maximum drilled depth of 10
<br />feet below ground surface within the limits of the project site, Upon reosipt of notice to proceed, a site visit
<br />j
<br />will be performed to markthe core/boring locations and evaluate access conditions for drilling equipment,
<br />Willdan will call USAfor underground utility locating at least 46 hours before any field work Is performed,
<br />However, all available subsurface utility Information should be provided/ Identified prlorto initiating field ex•
<br />ploratlon to reduce the potential for damaging existing utilities, Traffic control will be provided during drilling
<br />Borings/cares will be measured and visually logged in the field by an experienced representative. The log will
<br />include pavement sections thlokresses and subgrade conditions. The samples will be transported to Will -
<br />clan's gaotechnicai laboratory for testing,
<br />Laboratory testing of collected representative subgrade soils will determine their index and engineering prop.
<br />ertles,
<br />Option A; Gootechnloal Investigation will be used to identify the soil properties for the trenching and backfill of
<br />proposed utilities,
<br />M Option B: Providing recommendations for alternative now pavement sections.
<br />■ Option B: Performing a percolation test within a boring Subtask 4.03 Dellversbles
<br />drilled to a depth between 5 and 10 feet for BMP and green . Three hard D les ra draft eotechnicai
<br />streets Implementation (If needed), p g
<br />Providing a draft report and presenting our findings, conclu- report and one electronic PDP copy
<br />sions, and recommendations for review by the City. After Three hard copies of final geotechnical
<br />i receiving the City's comments, a final report Incorporating report and one electronic PDF copy
<br />the comments will be provided to the City, The report will be supported with a map Illustrating boring/oore to -
<br />cations and a summary of laboratory test results,
<br />Subtask 4,04 — Preliminary Design Report Willdan will compile a Preliminary Design Report (PDR) for
<br />review and approval by the City. The report will contain a summary of 9 Subtask 4.04 Dellverablas
<br />the initial reconnaissance notes, utility provided information, field survey Preliminary Design Report
<br />I findings, any photographs of conditions for discussion, and the base de-
<br />sign concept with preliminary construction cost estimate. The report will be disoussed with City representa-
<br />tives to make reliable, cost effective decisions about the proposed street Improvements, water and sower re-
<br />habllitation/replacement methods.
<br />During preparation of the PDR, Willdan will review existing information, such as the pavement management
<br />report, city sewer and water documents and field review of the street to make recommendations regarding
<br />the construction needs, including the location and extend of missing or damaged sidewalk, curbs and gutter,
<br />access ramps, driveways, sewer and water repairs, in addition, the report will address the disposition of
<br />existing utilities and coordination, and anticipated requirements,
<br />! Task 5 — Plans, Specifications, and Engineer's Estimate - Option A and Option Q
<br />Subtask 5.01 — Construction Plans.
<br />! Willdan will prepare conceptual plans for City review, corn- ® Task 5,01 Deliverables
<br />ment and approval, Upon approval of the concept plans, w Three hard copies of full-size conceptual plan
<br />the final design phase will be Initiated. Willdan will submit layout and one electronic PDF format
<br />plans at the 30-, 60-, and 100 -percent levels of comple- " Three hard copies of full-size and half-size plan
<br />! tion. The City will provide review comments at all design submittals at 80-, 60-, and 100 -percent comple-
<br />stages, Willdan will address comments received from the tion milestones, one electronic PDF copy, and
<br />submittal reviews, including comments received from one electronic Microstatfon copy in V6i format,
<br />other affected agencies and utilities. Wlllclan will submit one, original, signed set of full-sized plans, a signed, un-
<br />bound, set of final specifications, and a copy of the final enginser's opinion of construction cost to the City. One
<br />set of Mylars will be produced after 100% plans are approved by the City (upon request), Plans will conform to
<br />City standard plans and CARD standards and be prepared utilizing Mld"rostation V81 software,
<br />Option A: The plans be prepared In sufficient detail to bid the rehabilitation of the Identified well -- method to be
<br />determined by the City after review of the assessment report — and the proposed sewer and water facilities. Util-
<br />Ity plans will be drafted at 40 -scale and plans will display all referenced standard plans Including trenching de -
<br />tells.
<br />Option B: The plans will consist of a Title Sheet/ Typical notes, Roadway Plans, Construction Details, Signing
<br />and Striping, Landscape, and Storm Water Biofiltration (if required In complete streets), The Roadway Plans will
<br />k"', Proposal for On-call Engineering, 28
<br />(I t A Comprehensive. Innovative,Trustod, RFP No, 17-088
<br />—i
<br />
|