My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILLDAN ENGINEERING (3)
Clerk
>
Contracts / Agreements
>
W
>
WILLDAN ENGINEERING (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 11:42:21 AM
Creation date
7/17/2018 3:57:35 PM
Metadata
Fields
Template:
Contracts
Company Name
WILLDAN ENGINEERING
Contract #
A-2018-160-05
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
11/9/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cit ofSanta Ana ^ <br />consist of two sheets and will be drafted at 20 -scale. The Roadway Improvement Plane will Include the topo. <br />graphic survey and utility bass plan information, limits of removal, and limits of repairs for pavement, curb and <br />gutter, driveway configuration, ADA curb ramps, sto. All other Improvement plan sheets will be drafted at 40 - <br />scale. <br />Subtask 5.02 — Specifications. <br />Wilidan will prepare technical special provisions for bid. Task 5.02 Etelfverables <br />ding per City standards, The City will provide boilerplate ' One electronic PDF copy and one electronic <br />specifications. Special provisions will be prepared utilizing Word copy of technical and special provisions <br />Qreenbook and Caltrans formats (latest editions), at 60- and 100 -percent completion milestones <br />9ubtask 5.03 — Enginear's Construction Cost Estimate. <br />Willdan will prepare a construction cost estimate to accompany Task 5.03 Deliverables <br />the 30-, 60-, and 100 -percent plan deliverables. Quantity calcula- • One electronic PDF copy and one elec- <br />Ilons and final construction coat estimates will be prepared In ac- tronlc Excel copy of engineer's cost est]- l <br />cordance with Olty requirements to establish the project budget, mats at concept and 30-, 60-, and 100 - <br />percent completion milestones a <br />Task 6 _ Construction Bidding Phase Services - Option and Option B <br />Willdan will prepare a construction bid package per City <br />standards, Wilidan will advise the City of the appropriate ® Task 6 Deliverables <br />responses to bidders'technloai questions. If an adden- • Constructlon bid package <br />dum Is determined appropriate by the City, Willdan will • Addenda, as necessary <br />prepare revised plans, specifications, and/or quantity es- • Log of bidder Inquiries I <br />timates. WUldan will provide support during construction bidding phase services and advertising period by; <br />• Attending pre-bld meeting rq <br />• Assisting In analysis of olds, as necessary <br />• Logging questions and responses to blddem' qusstions regarding the bid documents L <br />• issue a dbftu mrto-btd-dwanTentsi smswer-qusstlrrrrs-ralse&lf-required <br />Task 7 — Pr6construotlon and Job Sita Meetings - Option A and Option B P } <br />Willdan will attend the preconstructlon meeting; job <br />walk, and job -site meetings, as required, over the ® Task 7 Deliverables <br />course of construction, Willdan assumes one precon- • Meeting minutes <br />struction meeting and three job site meetings, LJ <br />Task 6 - Respond to Requests for Information,and Submittals'- Option A and Option B' <br />Wilidan will provide responses to contractor's requests <br />STask 6 Deliverablea <br />for information about the plans and specifications, This <br />• Log requests for Information and provide responses <br />task Includes conferring with the City's construction <br />. Field design recommendations <br />i <br />manager, as appropriate, regarding the requests to ad- <br />• Field meeting minutes <br />dress unforeseen site conditions and/or provide field de- <br />• Design details <br />a <br />slgn recommendations. Regularly scheduled construction observation is specifically excluded from this scope of <br />work. Up to 10 responses to requests for Information are Included In the scope. <br />• <br />Task 9 -- Prbpare Record Drawings/As-Bullts - Option A and Option.B <br />J <br />Within 60 days following completion and acceptance of <br />Task 9 Deliverables <br />p <br />the project, Wilidan will furnlsh the City with a complete <br />set of revised original tracings showing as-bullt conditions <br />One complete set of orlginal record drawings on <br />vl <br />on Mylar. Revisions will be solely based upon as -bulli in- <br />Mylar, one electronic PDF copy, and one MI - <br />orostadon VBI <br />formation provided by the Oity's construction manager and <br />1 <br />the contractor. <br />J <br />4, J <br />wal' ComprehensiveInnovative,Proposal forOn-CallEnglneering, ?•" <br />c .l'rusked. RFP No,17.083 LJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.