Laserfiche WebLink
City of Santa Ana <br />Relevant Project Experience <br />Wilidan has chosen the following representative summaries for completed projects that exemplify Wllldan's <br />extensive expertise and relation to the Scope of Work detailed in the RFP, <br />Firestone Boulevard Capacity Enhancement <br />City of South .C3ate <br />6850 California Avenue <br />South Gate, CA 90860 <br />Client Contact.- Arturo Cervantes, Public Works olrec- <br />tor <br />(823) 568-85t e <br />Protect Dates. 2016 to 2017 (destgn completed; con- <br />structlon ongoing) <br />Project Team: Tyrone Peter, David Knell, John Hi- <br />dalgo, Vanessa Mutfoz, Mohssh Rahimlah, Salvador <br />Lopez, Alexis Escobar, Rose Khlabanl, Ray Wellington, <br />Michael Bustos, Kenneth Krieger, Randy Shadowen, Ber• <br />nardo Reyes, Susana Berrien'toe, Bryan Nguyen, $belle <br />McCracken, Robert Burch, Chris Stone, Edward Cox, <br />Christopher Kelley; Kevin; Custado,.Nicolle Spann, Robert <br />g p p Sun, Elroy Klepke, Ryan Moore <br />u <br />Ing drought�reslstarloe plants, Irrigation system, and lighting <br />system; reconstructing deficient sidewalk,. curb, gutter, <br />driveway approaches, and ADA -noncompliant curb ramps; <br />planting street parkway trees without irrigation, green <br />streets technologies, and complete streets <br />Wilidan is providing civil and traffic engineering de- <br />sign and other appurtenant services for street Im- <br />provements from Alameda Street to Hunt Avenue <br />funded through Metro and local funds. The project is <br />a complete rehabilitation of roadway improvements <br />that Involve widening the street from four to six; reha- <br />bilitating street pavement sections, Including local- <br />ized removal and repiacam.ent of failed roadway; In- <br />stallin landsca ad and hardsca ad medians incl d• <br />Artistic elements and gateway corridor entrance are in- <br />oluded in the design. Other irnprovements Include bus shel-• <br />ters and bus turnouts; traffic signal modifications with bat <br />tery backup, pedestrian Countdown heads, and upgrades to LED wherepossible. Signals will be.synchro- <br />nized to reduce traffic congestion .and improve bus speeds. <br />i.op Alamitos Boulevard Median Improvements <br />City of Los Alamllos <br />$.191 Katada.Avenue <br />Los Alamitos, CA 90720 <br />Willdan provided civil and traffic. engineering and <br />other appurtenant services for street improvements <br />between Cerritos Avenue and Katella Avenue. As <br />one of three Improvement segments, the project In- <br />volves raised medians With landscaping and Irriga- <br />tion, hardware, decorative street lights, electrical re- <br />ceptaoles for seasonal tree lighting, tree upiights and <br />monument signs. Median improvements were opti- <br />mized through traffic analysis and vehicle turning <br />movement modeling. <br />Crosswalks at four signalized intersections will be re- <br />moved and replaced with integral colored concrete. A <br />storm drain on Serpentine Drive will be modified. Por- <br />tions of the project limits will receive a 12 -Inch -thick <br />full -depth asphalt oonorete over S -Inch -thick com- <br />pacted subgrade. Wilidan assisted the City with public outreach to garner input through town hail meetings, <br />open houses, and publio hearings. <br />Client <br />Steven Mendoza, Community Development <br />Contact: <br />Director <br />(562) 43.1-3538 extension 300 <br />Project <br />2015 to2017(deslgncompleted, construc• <br />Dates;. <br />tion ongoing) <br />Project <br />Tyrone Peter,David Knell, John Hidalgo, <br />Team; <br />Mohsen Reh/mlan, Michael Bustos, Randy <br />Shadowen, Bernardo Peyes, Susena Bary <br />mentos, Bryan Nguyen, Sheila McCracken, <br />Robert Burch, Chms Stone, Edward Cox, <br />Kevin Custado, Elroy Klepke <br />WComprehensive. innovative, Trustoo. <br />Proposal for On -Call Engineering, <br />RFP No. 1.7-083 <br />25 <br />