<br />Firestone Boulevard Capacity Enhancement
<br />City of South .C3ate
<br />6850 California Avenue
<br />South Gate, CA 90860
<br />Client Contact.- Arturo Cervantes, Public Works olrec-
<br />tor
<br />(823) 568-85t e
<br />Protect Dates. 2016 to 2017 (destgn completed; con-
<br />structlon ongoing)
<br />Project Team: Tyrone Peter, David Knell, John Hi-
<br />dalgo, Vanessa Mutfoz, Mohssh Rahimlah, Salvador
<br />Lopez, Alexis Escobar, Rose Khlabanl, Ray Wellington,
<br />Michael Bustos, Kenneth Krieger, Randy Shadowen, Ber•
<br />nardo Reyes, Susana Berrien'toe, Bryan Nguyen, $belle
<br />McCracken, Robert Burch, Chris Stone, Edward Cox,
<br />Christopher Kelley; Kevin; Custado,.Nicolle Spann, Robert
<br />g p p Sun, Elroy Klepke, Ryan Moore
<br />u
<br />Ing drought�reslstarloe plants, Irrigation system, and lighting
<br />system; reconstructing deficient sidewalk,. curb, gutter,
<br />driveway approaches, and ADA -noncompliant curb ramps;
<br />planting street parkway trees without irrigation, green
<br />streets technologies, and complete streets
<br />Wilidan is providing civil and traffic engineering de-
<br />sign and other appurtenant services for street Im-
<br />provements from Alameda Street to Hunt Avenue
<br />funded through Metro and local funds. The project is
<br />a complete rehabilitation of roadway improvements
<br />that Involve widening the street from four to six; reha-
<br />bilitating street pavement sections, Including local-
<br />ized removal and repiacam.ent of failed roadway; In-
<br />stallin landsca ad and hardsca ad medians incl d•
<br />Artistic elements and gateway corridor entrance are in-
<br />oluded in the design. Other irnprovements Include bus shel-•
<br />ters and bus turnouts; traffic signal modifications with bat
<br />tery backup, pedestrian Countdown heads, and upgrades to LED wherepossible. Signals will be.synchro-
<br />nized to reduce traffic congestion .and improve bus speeds.
<br />i.op Alamitos Boulevard Median Improvements
<br />City of Los Alamllos
<br />$.191 Katada.Avenue
<br />Los Alamitos, CA 90720
<br />Willdan provided civil and traffic. engineering and
<br />other appurtenant services for street improvements
<br />between Cerritos Avenue and Katella Avenue. As
<br />one of three Improvement segments, the project In-
<br />volves raised medians With landscaping and Irriga-
<br />tion, hardware, decorative street lights, electrical re-
<br />ceptaoles for seasonal tree lighting, tree upiights and
<br />monument signs. Median improvements were opti-
<br />mized through traffic analysis and vehicle turning
<br />movement modeling.
<br />Crosswalks at four signalized intersections will be re-
<br />moved and replaced with integral colored concrete. A
<br />storm drain on Serpentine Drive will be modified. Por-
<br />tions of the project limits will receive a 12 -Inch -thick
<br />full -depth asphalt oonorete over S -Inch -thick com-
<br />pacted subgrade. Wilidan assisted the City with public outreach to garner input through town hail meetings,
<br />open houses, and publio hearings.
<br />Client
<br />Steven Mendoza, Community Development
<br />Contact:
<br />Director
<br />(562) 43.1-3538 extension 300
<br />Project
<br />2015 to2017(deslgncompleted, construc•
<br />Dates;.
<br />tion ongoing)
<br />Project
<br />Tyrone Peter,David Knell, John Hidalgo,
<br />Team;
<br />Mohsen Reh/mlan, Michael Bustos, Randy
<br />Shadowen, Bernardo Peyes, Susena Bary
<br />mentos, Bryan Nguyen, Sheila McCracken,
<br />Robert Burch, Chms Stone, Edward Cox,
<br />Kevin Custado, Elroy Klepke
<br />WComprehensive. innovative, Trustoo.
<br />Proposal for On -Call Engineering,
<br />RFP No. 1.7-083
<br />25
<br />
|