Laserfiche WebLink
2. SCOPE OF SERVICES AND SCHEDULE <br />Scope of Services <br />The tasks below are Intended to demonstrate the work to be Implemented and the deliverables.to be provided as pad, <br />of the On-Qell services..Addiilonal items not in the Soope of Services may be required to complete the On -Cell project. <br />Design plane and reports indicated will follow the CKVs standard format, unless required otherwise, Tasks are marked per <br />options A and 9 as outlined in the RFP. <br />Task 9: Project Management and Coordination (Options A and B) <br />..,...., ......................................, ...1..... ......., .. ..... ......- ............ J. <br />Kimley-Horn team members Will attend an initial klok-off meeting to confirm project elements, objeotives,.scope, and <br />schedule; and attend monthly PDT coordination meetings'with the City. We will conduct'meelings and conference calls and <br />provide pertinent meeting minutes with action Items and will prepare monthly progress reports, as part of the invoice package <br />As part of this task, a Gantt Chart Format Terget.Schedule will be provided showing primary tasks and review perlodsl <br />processing, in agreement with the City Kimley-Horn will maintain a Progress Schedule showing actual progress versus <br />target and provide to the City one monthly basis, <br />Dellvaroblesr Meeting agendas, meeting minutes, action items, progress reports, Invoicing, draft target schedule, <br />monthly updated schedule. <br />Task 2: record Research and .Utility Coordination (Options A and B) <br />... ............................................................................................................................................................... <br />Kimley-Horn will obtain readily available record drawings and data pertinent to the scope of services, such as GIS <br />mapping, as-bullt plans, and utility atlases. We will maintain a utility agency tracking list to indicate the status of <br />communtcation and add a contact list for substructure.and utility owner -operators that will also carry over to the <br />specifications. We will assist the City with utility notification letters. These letters will notify the utility agency of the project, <br />describe anticipated impacts, and Identify action required. <br />Dellyarablesr Utility agcncytracking list, utility notification totters. <br />Task 3: Geotechnical Study (Options A and B) <br />...................................................................................................................................... <br />Pavement Evaluation: We will use Citys provided traffic Index for pavement design.. Pavement evaluation will consist of <br />the following services: <br />Subsurface exploration consisting of the excavation, <br />sampling, and logging <br />Evaluate the R-valuo and in -place moisture content of <br />subsurface soils <br />Excavation and compaction requirements <br />Evaluate Expansion Index and Corrosion potential of <br />subsurface soils <br />Analysis and design of new pavement and pavement <br />rehabilitation alternatives <br />Provide recommendation for sidewalk improvement <br />Infiltration Test: Our team will conduct a geotechnieal field review and will provide recommendations as follows: <br />• Percolation rate test to the depth of elght feet Grain Size Distribution and Atterberg l.ImitsiPlasticity <br />• Agronomyisoll fertility laboratory testing Index <br />. Obtain bulk soil samples at selected depths <br />• Percolation rate characteristics of the soils <br />City of Santa Ma I MOf.T7=17 <br />Moisture content <br />Suitability of the on -site soils for landscape <br />Improvements <br />15 Kimley>>>Horn <br />