My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN (2)
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 4:01:57 PM
Creation date
7/20/2018 12:19:18 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN
Contract #
A-2018-160-01
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
4/1/2022
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 8: Street Improvement Plans (Option B) <br />........... ................ <br />Kimley-Hom will develop a street Improvement plan for the construction of roadway Improvements. The plans will show <br />horizontal and vertical design Information. Roadway plans will be prepared at a scale of 1" = 20' horizontal and 1" = 4' <br />vertical for profiles. We will use the surveying from Task 4 for base mapping. Vertical design informatlonfor construction of <br />new medians and curbs will be Indicated on the plans with profiles. Details and typical sections will be added as needed. <br />We will prepare details for items that deviate from published standards. <br />Deliverables: 30%, Mo, and Final Plans, electronic files In Mlorostation V81 and PLY (Final plans will be sealed and <br />signed), and responses to pro. vlous..review commenis front tia City. <br />Task g: System Modeling fo Connect Well ptrectly fo Water System (Option A) <br />Ahydraulic modeling analysis will be conducted to analyze the changed operating conditions from the existing direct <br />discharge to a reservoir, to a dlreot:conneotiop to the City's distribution system Anew system curve will be developed <br />and analyzed with the existing well pump curve to determine the new operating conditions of the pump, along with any <br />Improvements necessary for the new connection Pont. The model will also be used to.analyze Impacts to other system <br />facilities within the City's distribution system, and recommend a revised operations and control strategy, <br />Deliverables: Draft watersystem modeing report, Final water system modeling report <br />Task 10: Water improvement Plans (Option A) <br />............................. ............................... <br />Kimley-Horn will develop a water improvement plan for rehabilitation of the existing water well and proposed water <br />mains construction, The plans Will show horizontal and vertical design Information. Plans will be prepared at scale <br />of V = 20' horizontal and 1" = 4'vertical for profiles. We will use the surveying from Task 4 for base mapping. Vertical <br />design information for water main will show proposed water main profile and will Identify potential conflicts with existing <br />underground utilities, Details and typical sections will be added as needed. We will prepare details for items that deviate <br />from published standards, <br />Deliverables: 30%, 60%, and Final Plans, electronic riles In Microstatfon V81 and PDF (final plans will be sealed and <br />signed), and responses to previous review comments from the City. <br />Task 11: Signing and Striping Plans (Options A and B) <br />............................................................................... <br />............................................................. <br />..... <br />We will prepare striping and Signing pians.at a scale of 1"= 40' for the proposed improvements within the limits of the <br />project. Striping and signing plans will oomply with the City's standards, Caltrans, and the California MUTCD, Flashing <br />beacon Installation and parking meter details; if required, will be shown on the striping and signing plans. <br />Deliverables: 30%, 60, and Final Plans, electronlc files in Microstatfon V81 and PDF (gnat plans will be sealed and <br />signed), and responses to previous review comments from the City. <br />Task 12: Landscape and Irrigation Plans (Option B) <br />..................................................................................... <br />............................................................................... <br />The Kimley-Horn team will prepare landscape and irrigation plans for the proposed medians and parkways within the <br />project limits. These plans will be consistent with the City's Standards and General Plan, the City's Scenic Corridor <br />Elements, the City's Urban Design Elements, and California's Water Efficient Landscape Ordinance. We will consider City <br />maintenance when developing the design. Landscape and Irrigation plans will be prepared at a scale of i" = 20' horizontal, <br />Deliverables; 30%, 00%, and Final Plans, electronic files in Microstatfon V81 and PDP (final plans will be sealed and <br />signed), and responses to previous review comments from the City. <br />City of Santa Ana I TROC77oz5.17 17 Kimley> Horn <br />
The URL can be used to link to this page
Your browser does not support the video tag.