My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 11:11:31 AM
Creation date
7/24/2018 10:46:34 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2018-159-07
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL. raNXAL FNGINEMING SERVICES I t <br />RFP NO : 47.0£18 <br />City of Santa Aiia <br />flask 4 Dellyerables: <br />• Utility mapping shown on the basemapping <br />• Certified List of Utilities per USA <br />• Utility Company Correspondence Letters ("ABC" Letters) <br />• Pothole Data (20) <br />Task C Geotechnical Investigation <br />As required for the development of the final design pians, Mark Thomas' subconsultant, Diaz Yourman, <br />will review available information pertlnent to the site and collect subsurface information in order to develop <br />recommendations for the design and construction of the proposed Improvements. In addition to the <br />background review, the Geotechnical scope Includes: <br />• Pre -field activities <br />• Field explorations <br />• Laboratory testing <br />• Geotechnical Analysis and Report Preparation. <br />Task 6 Deliverables; <br />Final Geotechnical Report with pavement, wall design recommendations. soil infiltration rates, <br />Boring logs <br />Task 6. Water Quality Management Plan <br />Mark Thomas will prepare a Water Quality Management Plan (WQMP) for the proposed roadway in <br />accordance with the Santa Ana Regional Water Quality Control Board (Order No. R8-2009-0030/NPDES No. <br />CAS898030). Mark Thomas will Incorporate Low Impact Development Best Management Practices to the <br />maximum extent practicable, for example the use of similar existing infiltration faeilitles used elsewhere in <br />the City to maintain the aesthetics of recently constructed Improvements within the project limits and where <br />feasible per site specific conditions. The United States Environmental Protection Agency (USEPA) document <br />"Managing Wet Weather with Green Infrastructure: Green Streets" will be used to satisfy the compliance <br />requirements for this priority project. <br />Task 6 Delivorables: <br />• Draft and Final Water Quality Management Plans <br />Inclusion of chosen BMP's within the Construction documents. <br />Task 7, Hydrology/Hydraulic Analyses and Report <br />Mark Thomas will conduct hydrology analysis of the proposed roadway surface and hydraulic analysis of the <br />existing in order to verify the recommended storm drain upgrades as part of the City's Master Drainage Plan <br />(201 7j. The new roadway tributary areas will be analyzed In accordance with City and County of Orange <br />Hydrology manual for a 50 year storm event, The results from the hydrology analysis will be used to identify <br />additional Inlets and other necessary improvements. <br />Task 7 Deliverables <br />• Draft and Final Hydrology/Hydraulic Analyses Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.