My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 11:11:31 AM
Creation date
7/24/2018 10:46:34 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2018-159-07
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OM.cAI_t. t NGINrENINc St-r2VIOTs, <br />PROPOSAL <br />WT NO : 17,003 <br />City of Santa Ana <br />t4: <br />Task 8-12. Final Design (PS&E) <br />Preparation of Pians: <br />t <br />Mark Thomas will prepare 60%, 961/9 and 100% level design plane, specifications and estimates based on <br />the approved concept design. The PS&E packages will Include, at minimum; <br />f , <br />Titie Sheet <br />a <br />- Typical Sections <br />o Street Plans'+ <br />Construction Details <br />Intersection Grading Plans' <br />Drainage Improvements plans <br />Soundwall Plans <br />tl;. <br />o Signing and Striping <br />• ErosionControl Pians <br />s Street Lighting <br />4 Utility Disposition <br />Irrigation and Landscaping <br />Traffic Control & Staging Plans <br />Final cross sections at every 26 -feet will be provided at the submittal of the 100% level design plans. <br />Special Provisions: <br />Mark Thomas will prepare specifications using the City's boilorplate and the latest version of the Greenbook. <br />The specifications will be submitted along with the draft plans to the City at all submittals for approval. Mark <br />Thomas will also prepare any special provisions relating to the design plans, as needed. <br />Cost Estimate: <br />Mark Thomas will prepare (In MS Excel) an Engineer's Estimate of Construction Costs based on estimated <br />quantities and available construction cost utilizing Caltrans Contract Cost Data, RS Means and/or readily <br />available data from similar past projects. Backup of all quantities and unit cost will be provided prior to <br />construction. Mark Thomas will utilize contingency values based on industry standards, however, City to <br />agree upon these values, <br />Task 8, Design Concept Plan <br />Immediately after the kick-off meeting and review of any existing data files, Mark Thomas will continue the <br />Geometric. Design. Refinement of the project, The plans will Include horizontal and vertical design and design <br />calculations for the roadway realignment. <br />A draft Engineer's Estimate of Construction Cost will be prepared at this level to begin the value engineering <br />analysis.The City will review the Concept Design Plan and after resolution of any geometric design <br />comments, the PS&E can be started. <br />Task 9,60% PS&E <br />Mark Thomas will prepare the 60% plans once the geometric design has been approved. Estimate of Cost <br />will be updated and the first draft of the technical specification will be prepared. The draft Drainage Report <br />and the draft Geotechnical Report will be submitted for review, <br />
The URL can be used to link to this page
Your browser does not support the video tag.