Laserfiche WebLink
PROPOSAL <br />AR` URO VIVAR, PE <br />ON,CALL ENGINSERINC SERVICES <br />F FP NO.: 17-083 <br />City of Santa Ana <br />Arturo brings more then 16 years of experience delivering transportation design projects within Southern <br />California, He has extensive experience providing civil and transportation design for roadway widenings, <br />intersection modifications, pavement rehabilitation, and multimodal.enhancements. Arturo is experlenced <br />In transportation and civil engineering projects for public agenoles, His projects -have Involved roadway <br />widenings, highway Interchange Improvements, street rehabilitation and drainage improvements, In <br />accordance to the Caltrans HDM, AASHTO, and local agency requirements, <br />REPRESENTATIVE PROJECTS <br />Proj ct <br />Project Manager <br />ma ager <br />BAYSiDE DRIVE IMPROVEMENTS PROJECT, NEWPORT BEACH, CA <br />Deputy project manager for this improvement project in Newport Beach.. <br />EDUCATION <br />Mark Thomas was recently selected to provide engineering, geometric and <br />BS in CIViI <br />transportation design services to Complete this this roadway project -that will <br />EnginearCng; . <br />greatly improve pedestrian safety, bicycle connectivity, and overall vehicular <br />Caiifornla State <br />and multimodal operations, Key services include Caltrans approval and <br />University, Fullerton <br />permitting, pavement rehabilitation, complete streets/urban design, and bike/ped <br />REGISTRATION <br />Improvements. <br />CA C700761 <br />MULTIPLE. PAVEMENT REHABILITATIONS, ,FULLERTON„CA <br />Mark Thomas Is providing on-call civil engineering: services for the City of <br />Fullerton, Services include roadway pavement design, drainage study, storm <br />drain and sanitary sewer systems, storm water management practices and <br />other miscellaneous civil engineering and maintenance work, The following task <br />orders are currently in progress or recently completed and are representative of <br />the sample projects to be completed as ,part of the on-call contract: Chapman <br />Avenue, Yorba Linda Boulevard Pavement Rehabilitation, Commonwealth <br />Avenue Reconstruction Project, Berkeley Avenue Pavement Rehabilitation, and <br />Sunny Crest Drive Reconstruction Project, <br />WARNER AVENUE WIDENING AND IMPROVEMENTS, SANTA ANA, CA <br />Project manager for the final PS&E to widen over 1,600 linear feet of Warner <br />Avenue from Main Street to Oak Street. The project converts the roadway from a <br />four lane undivided arterial to a six -lane divided arterial to conform to the City & <br />County arterials master plan. The six lane arterial includes curb separated Type <br />IV bike lane which will serve to connect two Type I bike lane facilities. <br />SR 60 (ROSEDALE HiGHWAY) WIDENING AND IMPROVEMENTS <br />PROJECT, BAKERSFIELD, CA <br />Project manager responsible for internal and external technical design <br />coordination and the roadway design engineer of record for widening <br />approximately 5.5 miles of SR 58/Rosedale Highway from SR 99 to Alien Road. <br />The project adds one lane in each direction, median Improvements, and tum <br />lanes at specific intersections. <br />US 101 HOV & REHABILITATION PROjECTS,,9ANTA BARBARA, CA <br />Project support for the the preliminary design services to evaluate geometrics <br />for $300M, 4,5 -mile HOV widening and pavement rehabilitation projects. The <br />project involves the preparation of 36% "Decision -Point Documents” for highway <br />and Interchange improvements along US 101 from Cabrillo Boulevard to Padaro <br />Lane, Project elements include reconstruction of two Interchanges with left -lane <br />off -ramps, replacement of three bridges of FEMA -regulated creeks, retaining <br />walls along the sea cliff, sound walls, and pavement rehabilitation. <br />IWM <br />'jM <br />