PROPOSAL
<br />AR` URO VIVAR, PE
<br />ON,CALL ENGINSERINC SERVICES
<br />F FP NO.: 17-083
<br />City of Santa Ana
<br />Arturo brings more then 16 years of experience delivering transportation design projects within Southern
<br />California, He has extensive experience providing civil and transportation design for roadway widenings,
<br />intersection modifications, pavement rehabilitation, and multimodal.enhancements. Arturo is experlenced
<br />In transportation and civil engineering projects for public agenoles, His projects -have Involved roadway
<br />widenings, highway Interchange Improvements, street rehabilitation and drainage improvements, In
<br />accordance to the Caltrans HDM, AASHTO, and local agency requirements,
<br />REPRESENTATIVE PROJECTS
<br />Proj ct
<br />Project Manager
<br />ma ager
<br />BAYSiDE DRIVE IMPROVEMENTS PROJECT, NEWPORT BEACH, CA
<br />Deputy project manager for this improvement project in Newport Beach..
<br />EDUCATION
<br />Mark Thomas was recently selected to provide engineering, geometric and
<br />BS in CIViI
<br />transportation design services to Complete this this roadway project -that will
<br />EnginearCng; .
<br />greatly improve pedestrian safety, bicycle connectivity, and overall vehicular
<br />Caiifornla State
<br />and multimodal operations, Key services include Caltrans approval and
<br />University, Fullerton
<br />permitting, pavement rehabilitation, complete streets/urban design, and bike/ped
<br />REGISTRATION
<br />Improvements.
<br />CA C700761
<br />MULTIPLE. PAVEMENT REHABILITATIONS, ,FULLERTON„CA
<br />Mark Thomas Is providing on-call civil engineering: services for the City of
<br />Fullerton, Services include roadway pavement design, drainage study, storm
<br />drain and sanitary sewer systems, storm water management practices and
<br />other miscellaneous civil engineering and maintenance work, The following task
<br />orders are currently in progress or recently completed and are representative of
<br />the sample projects to be completed as ,part of the on-call contract: Chapman
<br />Avenue, Yorba Linda Boulevard Pavement Rehabilitation, Commonwealth
<br />Avenue Reconstruction Project, Berkeley Avenue Pavement Rehabilitation, and
<br />Sunny Crest Drive Reconstruction Project,
<br />WARNER AVENUE WIDENING AND IMPROVEMENTS, SANTA ANA, CA
<br />Project manager for the final PS&E to widen over 1,600 linear feet of Warner
<br />Avenue from Main Street to Oak Street. The project converts the roadway from a
<br />four lane undivided arterial to a six -lane divided arterial to conform to the City &
<br />County arterials master plan. The six lane arterial includes curb separated Type
<br />IV bike lane which will serve to connect two Type I bike lane facilities.
<br />SR 60 (ROSEDALE HiGHWAY) WIDENING AND IMPROVEMENTS
<br />PROJECT, BAKERSFIELD, CA
<br />Project manager responsible for internal and external technical design
<br />coordination and the roadway design engineer of record for widening
<br />approximately 5.5 miles of SR 58/Rosedale Highway from SR 99 to Alien Road.
<br />The project adds one lane in each direction, median Improvements, and tum
<br />lanes at specific intersections.
<br />US 101 HOV & REHABILITATION PROjECTS,,9ANTA BARBARA, CA
<br />Project support for the the preliminary design services to evaluate geometrics
<br />for $300M, 4,5 -mile HOV widening and pavement rehabilitation projects. The
<br />project involves the preparation of 36% "Decision -Point Documents” for highway
<br />and Interchange improvements along US 101 from Cabrillo Boulevard to Padaro
<br />Lane, Project elements include reconstruction of two Interchanges with left -lane
<br />off -ramps, replacement of three bridges of FEMA -regulated creeks, retaining
<br />walls along the sea cliff, sound walls, and pavement rehabilitation.
<br />IWM
<br />'jM
<br />
|