Laserfiche WebLink
(t <br />LA ON-CALL ENUINGEw NG SERVICES PROPOSAL <br />RFP NO.: 17-083 <br />City of Santa Ana <br />ROB HIME , PP <br />Rob has more than 31 years of experience In municipal and transportation engineering. He has worked with <br />mWnicipalitles, agencies and Caltrans to plan and design highway, roadway, bridge, and utility Infrastructure <br />-' <br />Improvements. Rob Is a Principal of the firm and specializes in all aspects of transportation ptojects ranging°y <br />from feasibility studies to final PS&E: He has a detailed understanding of the Caltrans HDM, AASHTQ "Green <br />Book", and other applicable design guidelines and criteria. His focus Is on client service, ensuring, the delivery <br />of accurate work that serves our client`s goals, while working within budget and targeted schedule, <br />REPRESENTATIVE PROJECTS <br />Ch�arrge7 <br />� <br />Prriincipal In GAYSIDE DRIVE IMPROVEMENTS PROJECT, NEWPORT BEACH, GA <br />Asscolatei4 Charge Principal in charge for this Improvement project in. Newport Beach. Mark <br />Thomas is providing engineering, geometric and transportation design services <br />t <br />EDUCATION to complete this this roadway project that will greatly improve pedestrian safety, <br />In Civil bicycle connectivity, and overall vehicular and multimodal operations. Key', <br />Engineering, services include Caltrans approval and permitting, pavement rehabilitation, <br />+ <br />University:of complete streets/urban design, and bikelped improvements. <br />California, Berkeley <br />MULTIPLE PAVEMENT REHABILITATIONS, FULLERTON, CA <br />REGISTRATION Mark Thomas is providing on-call civil enginearing services for the -City of <br />&..b <br />CA C4047 Fullerton. Services Include roadway pavement design, drainage study, storm <br />r. <br />" <br />drain and sanitary sewer systems, storm water, management practices and <br />other miscellaneous civil engineering and maintenance work, The following task <br />� t; <br />orders are currently In progress or recently completed and are representative of <br />the sample projects to be completed as part of the on -cal contract: Chapman <br />Avenue, Yorba Linda Boulevard Pavement Rehabilitation, Commonwealth <br />f <br />Avenue Reconstruction Project, Berkeley Avenue Pavement Rehabilitation, and <br />Sunny Crest Drive Reconstruction Project <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />` t <br />Principal in charge/project manager responsible for overseeing the preliminary <br />; <br />design services to evaluate geometries for the $300M, 4.5 -mile HOV widening <br />and pavement rehabilitation projects. The project involves the preparation of <br />35% "Decision -Point Documents" for highway and interchange improvements <br />; f <br />along U5 101 from Cabrillo Boulevard to Padaro Lane. Project elements include <br />reconstruction of two Interchanges with left -lane off -ramps, replacement of three <br />l <br />bridges of FEMA -regulated creeks, retaining wells along the sea cliff; sound <br />t <br />walls, and pavement rehabilitation. <br />p <br />SR 58 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />P <br />PROJECT, BAKERSFIELD, CA <br />Principal in charge for final design services for widening approximately 5.5 <br />t <br />miles of SR 58/Rosedale Highway from SR 99 to Alien Road. The project will <br />G <br />add one lane in each direction, median Improvements, and turn lanes at some <br />Intersections. <br />1.5/KATELLA AVENUE UNDERCROSSiNG; ANAHEIM, CA <br />6 <br />Principal in charge responsible for development and submittal of project <br />i <br />approval document, geometric alternatives and final design (with mandatory/ <br />advisory design exception approval), and contract documents. Project includes <br />utility investigation, Identification and coordination with utility owners for facility <br />relocation designs and review of traffic analysis, environmental, and water <br />quality documents. <br />a " <br />i <br />