PROPOSAL ON-CALL ENGINEERING SERVICES My.
<br />REP NO.: 17-083
<br />City of Santa An
<br />RAVI SHAM, PI=, Q8D1P
<br />Ravi has.more than 10 years of experience providing project management expertise in the design of highway
<br />and local Infrostructure Improvements. Mansging numerous simultaneous projects, leading teams and building
<br />consensus are a few of the many strengths Ravi has developed as a project engineer. Ravi Is well versed at
<br />managing fast -paced, multi-agancy/dlscipiine projects.
<br />PROJECT ROLE
<br />C1viURoadway Lead
<br />EDUCATION
<br />135, in ovli
<br />15ngl6aering, cal Poly
<br />Pomona
<br />REGISTRATION
<br />CA CM 83
<br />`GISDIP 25658
<br />REPRESENTATIVE PROJECT'S
<br />BAYSIDE DRIVE IMPROVEMENTS PROJECT, NEWPORT BEACH, CA
<br />Roadway/Drainage design engineer for this Improvement project in Newport
<br />Beach. Mark Thomas is providing anglneering, goo metrlo'and transportation
<br />, and overall vehicular and iririltimodal
<br />ahs approval and permitting, pavement
<br />design, and bike/ped improvements,
<br />WARNER AVENUE WIDENING AND IMPROVEMENTS, BANTA ANA, CA
<br />Project engineer for the final Piz&E to widen over 1,600 linear tot of Warner
<br />Avenue from Main Street to Oak Street. The project will convert the roadway
<br />from a four lane undivided arterial to a six -lane divided arterial to conform to
<br />the City and County arterials master plan. The six lane arterial includes curb
<br />separated Type iV bike lane which will serve to connect two Type I bike lane
<br />facilities including the Pacific Electric Bicycle Trail, Responsibilities include
<br />development of cross Section alternatives, roadway design, and drainage
<br />improvements.
<br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA
<br />Project engineer responsible for preliminary design services to evaluate
<br />geometrics for $300M, 4.6 -mile I -10V widening and pavement rehabilitation
<br />projects. Project elements also includereconstruction of -two interchanges with
<br />left -lane off -ramps, replacement of three bridges of FEMA -regulated creeks,
<br />retaining walls along the sea cliff, sound walls, and pavement rehabilitation,
<br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS
<br />PROJECT, BAKERSFIELD, CA
<br />Project engineer responsible for overseeing the coordination and relocation of
<br />impacted utilities and the design of stage construction plan sheets for widening
<br />approximately 5,5 miles of SR 58lRosedele Highway from SR 99 to Allen Road,
<br />The project will add one lane in each direction, median improvements, and turn
<br />lanes at certain intersections.
<br />STATE COLLEGE BOULEVARD RAILROAD GRADE SEPARATION
<br />PROJECT, FULLERTON, CA
<br />Construction support for the development of the grade separation design,
<br />preparation of final PS&E for construction, drainage design, drainage plans
<br />and profiles, and hydrology and hydraulic calculations, The project includes a
<br />railroad bridge, special design retaining wails, pump station, signal and lighting
<br />modifications, parking lot site Improvements, water and sender relocations, utility
<br />coordination, and survey and right of way support.
<br />
|