Laserfiche WebLink
PROPOSAL ON-CALL ENGINEERING SERVICES My. <br />REP NO.: 17-083 <br />City of Santa An <br />RAVI SHAM, PI=, Q8D1P <br />Ravi has.more than 10 years of experience providing project management expertise in the design of highway <br />and local Infrostructure Improvements. Mansging numerous simultaneous projects, leading teams and building <br />consensus are a few of the many strengths Ravi has developed as a project engineer. Ravi Is well versed at <br />managing fast -paced, multi-agancy/dlscipiine projects. <br />PROJECT ROLE <br />C1viURoadway Lead <br />EDUCATION <br />135, in ovli <br />15ngl6aering, cal Poly <br />Pomona <br />REGISTRATION <br />CA CM 83 <br />`GISDIP 25658 <br />REPRESENTATIVE PROJECT'S <br />BAYSIDE DRIVE IMPROVEMENTS PROJECT, NEWPORT BEACH, CA <br />Roadway/Drainage design engineer for this Improvement project in Newport <br />Beach. Mark Thomas is providing anglneering, goo metrlo'and transportation <br />, and overall vehicular and iririltimodal <br />ahs approval and permitting, pavement <br />design, and bike/ped improvements, <br />WARNER AVENUE WIDENING AND IMPROVEMENTS, BANTA ANA, CA <br />Project engineer for the final Piz&E to widen over 1,600 linear tot of Warner <br />Avenue from Main Street to Oak Street. The project will convert the roadway <br />from a four lane undivided arterial to a six -lane divided arterial to conform to <br />the City and County arterials master plan. The six lane arterial includes curb <br />separated Type iV bike lane which will serve to connect two Type I bike lane <br />facilities including the Pacific Electric Bicycle Trail, Responsibilities include <br />development of cross Section alternatives, roadway design, and drainage <br />improvements. <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer responsible for preliminary design services to evaluate <br />geometrics for $300M, 4.6 -mile I -10V widening and pavement rehabilitation <br />projects. Project elements also includereconstruction of -two interchanges with <br />left -lane off -ramps, replacement of three bridges of FEMA -regulated creeks, <br />retaining walls along the sea cliff, sound walls, and pavement rehabilitation, <br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />PROJECT, BAKERSFIELD, CA <br />Project engineer responsible for overseeing the coordination and relocation of <br />impacted utilities and the design of stage construction plan sheets for widening <br />approximately 5,5 miles of SR 58lRosedele Highway from SR 99 to Allen Road, <br />The project will add one lane in each direction, median improvements, and turn <br />lanes at certain intersections. <br />STATE COLLEGE BOULEVARD RAILROAD GRADE SEPARATION <br />PROJECT, FULLERTON, CA <br />Construction support for the development of the grade separation design, <br />preparation of final PS&E for construction, drainage design, drainage plans <br />and profiles, and hydrology and hydraulic calculations, The project includes a <br />railroad bridge, special design retaining wails, pump station, signal and lighting <br />modifications, parking lot site Improvements, water and sender relocations, utility <br />coordination, and survey and right of way support. <br />