ON-CALL ENGINEERING SERVICES PROPOSAL
<br />RPP NO.: 17-083.
<br />City aPSenta Ana
<br />KEN DOTY, PE, QSD
<br />Ken has more than 30 years of experience in municipal and transportation engineering with Mark Thomas. He
<br />Is experienced in all aspects of the preparation of PS&E specializing in transportation improvement projects for
<br />public agencies, Including Cities, Counties, and Caltrans facilities. He is experienced In the preparation of the
<br />hydrology and hydraulic reports, and. has led the design of drainage, storm drain Improvements, temporary
<br />drainage and water line during construction, and water and sewer relocations for a variety of projects including
<br />complete streets, roadway rehabilitations, highway/Interchange widenings and improvements, and grade
<br />separations.
<br />REPRESENTATIVE PROJECTS
<br />PROJECT.RQLE US 101 NOV & REHABILITATION PROJECTS, SANTA BARBARA, CA
<br />Loadalnags(Hydraulics
<br />LeProject engineering support for the $300M, 4.6-mile NOV widening and
<br />pavement rehabilitation projects. Project elements include reconstruction of two
<br />EDUCATION interchanges with left-lane off-ramps, replacement of three bridges of FEMA-
<br />BS In CIA1 regulated creeks, retaining walls along the sea cliff, sound walls, and pavement
<br />Engineering, Oregon rehabilitation.
<br />Stat®University YORBA LINDA BOULEVARD PAVEMENT REHABILITATION PROJECT
<br />REGISTRATION PS&E, FULLERTON, CA
<br />GA P4722B Project manager responsible for preparing geotechnical report and final design
<br />OSD 4722& plans, specification and estimate for the reconstruction of Yorba Linda Boulevard
<br />from Placentia Avenue to Bradford Avenue. The project is approximately 2,600
<br />feet in length and will include the reconstruction of curb, gutter, sidewalk, cross
<br />gutters and various curb ramps to meet current ADA standards.
<br />NORTH BERKELEY AVENUE PAVEMENT RECONSTRUCTION AND
<br />f
<br />REHABILITATION, FULLERTON, CA
<br />Project manager responsible for preparing geotechnical report and final design
<br />plans, specification and estimate for the reconstruction of North-Berkeley
<br />Avenue between Harbor Boulevard and Valley View Drive; The project is
<br />approximately 1,530 feet in length and will include the reconstruction of curb,
<br />gutter, sidewalk, cross gutters and various curb ramps to meet current ADA:
<br />standards.
<br />STATE COLLEGE BOULEVARD RAILROAD GRADE SEPARATION
<br />PROJECT, FULLERTON, CA
<br />Project manager responsible for storm drainage, sanitary sewer and water
<br />phases, and construction support services for this grade separation project. The
<br />sanitary sewer pians were split into the City of Fullerton sewer and the Orange
<br />t
<br />County Sanitation District sewer lines. The water line belonged to the City of
<br />Fullerton. The project Includes a railroad bridge, special design retaining walls;
<br />pump station, signal and lighting modifications, parking lot site improvements,
<br />water and sewer relocations, utility coordination, and survey and right of way
<br />support.
<br />l
<br />SR 405/SR 605 NOV CONNECTOR, ORANGE COUNTY, CA
<br />Project manager responsible for drainage, quality control, and utilities for this
<br />$102M project to add NOV connectors. Design tasks include the development of
<br />X
<br />typical cross sections and design and layout of the temporary drainage systems
<br />for each construction stage, and evaluation of utility protection and relocations.
<br />Project responsibilities also included the detailed review of the soundwall
<br />design for all the project soundwalls, as well as review of the stage construction
<br />including the development of 100 cross sections,
<br />CP
<br />k:_
<br />IL"
<br />
|