Laserfiche WebLink
ON-CALL ENGINEERING SERVICES PROPOSAL <br />RPP NO.: 17-083. <br />City aPSenta Ana <br />KEN DOTY, PE, QSD <br />Ken has more than 30 years of experience in municipal and transportation engineering with Mark Thomas. He <br />Is experienced in all aspects of the preparation of PS&E specializing in transportation improvement projects for <br />public agencies, Including Cities, Counties, and Caltrans facilities. He is experienced In the preparation of the <br />hydrology and hydraulic reports, and. has led the design of drainage, storm drain Improvements, temporary <br />drainage and water line during construction, and water and sewer relocations for a variety of projects including <br />complete streets, roadway rehabilitations, highway/Interchange widenings and improvements, and grade <br />separations. <br />REPRESENTATIVE PROJECTS <br />PROJECT.RQLE US 101 NOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Loadalnags(Hydraulics <br />LeProject engineering support for the $300M, 4.6-mile NOV widening and <br />pavement rehabilitation projects. Project elements include reconstruction of two <br />EDUCATION interchanges with left-lane off-ramps, replacement of three bridges of FEMA- <br />BS In CIA1 regulated creeks, retaining walls along the sea cliff, sound walls, and pavement <br />Engineering, Oregon rehabilitation. <br />Stat®University YORBA LINDA BOULEVARD PAVEMENT REHABILITATION PROJECT <br />REGISTRATION PS&E, FULLERTON, CA <br />GA P4722B Project manager responsible for preparing geotechnical report and final design <br />OSD 4722& plans, specification and estimate for the reconstruction of Yorba Linda Boulevard <br />from Placentia Avenue to Bradford Avenue. The project is approximately 2,600 <br />feet in length and will include the reconstruction of curb, gutter, sidewalk, cross <br />gutters and various curb ramps to meet current ADA standards. <br />NORTH BERKELEY AVENUE PAVEMENT RECONSTRUCTION AND <br />f <br />REHABILITATION, FULLERTON, CA <br />Project manager responsible for preparing geotechnical report and final design <br />plans, specification and estimate for the reconstruction of North-Berkeley <br />Avenue between Harbor Boulevard and Valley View Drive; The project is <br />approximately 1,530 feet in length and will include the reconstruction of curb, <br />gutter, sidewalk, cross gutters and various curb ramps to meet current ADA: <br />standards. <br />STATE COLLEGE BOULEVARD RAILROAD GRADE SEPARATION <br />PROJECT, FULLERTON, CA <br />Project manager responsible for storm drainage, sanitary sewer and water <br />phases, and construction support services for this grade separation project. The <br />sanitary sewer pians were split into the City of Fullerton sewer and the Orange <br />t <br />County Sanitation District sewer lines. The water line belonged to the City of <br />Fullerton. The project Includes a railroad bridge, special design retaining walls; <br />pump station, signal and lighting modifications, parking lot site improvements, <br />water and sewer relocations, utility coordination, and survey and right of way <br />support. <br />l <br />SR 405/SR 605 NOV CONNECTOR, ORANGE COUNTY, CA <br />Project manager responsible for drainage, quality control, and utilities for this <br />$102M project to add NOV connectors. Design tasks include the development of <br />X <br />typical cross sections and design and layout of the temporary drainage systems <br />for each construction stage, and evaluation of utility protection and relocations. <br />Project responsibilities also included the detailed review of the soundwall <br />design for all the project soundwalls, as well as review of the stage construction <br />including the development of 100 cross sections, <br />CP <br />k:_ <br />IL" <br />