Laserfiche WebLink
PROPOSAL <br />�W <br />ON-CALL ENGINEERING SERVICES <br />RFP NO.: 17.083 <br />City of Santa Ana <br />Jared has more then 7 years of experience in municipal and transportation engineering, Over the course .of <br />his career at Mark Thomss, he has been involved in the utility coordination and utility mapping, preparation of <br />trafrio control plans, right of way acquisition, project design, striping, and preparation of plans, project reports <br />and estimates for a variety of projects for public agencies' throughout California. <br />1-710 UTILITY RELOCATION STUDY, LOS ANGELES COUNTY, CA <br />Design engineer responsible for preparation of a utility relocation study along <br />the central segment of the 1-710 Corridor, between the 1.405 interchange and <br />the Los Angeles Riven The project requires extensive coordination with utility, <br />companies and other agencies as utility relocation would impact underground <br />major gas, oil, sewer, communication, and waterlines, and the relocation of <br />Southern California Edison's 220-kv transmission corridor and 66-kv lines. <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer for this $800M, 4.5 -mile HOV widening and pavement <br />rehabilitation project. Project elements Include reconstruction of two <br />interchanges with left -lane off -ramps, pavement rehabilitation, replacement of <br />three bridges of FEMA -regulated creeks, retaining walls along the sea cliff, and <br />sound walls, <br />BROADWAY STREETSCAPE IMPROVEMENT&, FRESNO, CA <br />Design engineer responsible for plan preparation and design. Project design <br />includes grading, drainage, utility mapping, and bulb -out design. The purpose <br />of the project was to create a pedestrian friendly corridor, beautification of <br />community and revitalization of downtown. <br />REPRESENTATIVE PROJECTS <br />PROJECT RlnOtlor <br />Coortlinati <br />SR 60 (ROSEDALE HIGHWAY) WID.ENINGIIMPROVEMENT a, <br />.Utilities <br />BAKERSFiELD, CA <br />41),l TILfN . <br />Design., engineer responsible for project staging, utility mapping, traffic Handling, <br />8$ In Civil <br />and utility coordination, There are, extensive utility relocations involved, <br />En lneering, <br />requiring extensive coordination. The five mile roadway widening project <br />California Stata <br />crosses two boundary lines and is coordinatedwiththree governing agencies, <br />University, Fresno <br />Improvements inolude an ADA corridor, widened roadway, reduced medians, <br />11 I8TRATION <br />new curb, gutter, and sidewalk. <br />EIT 136985 <br />WARNER AVENUE WIDENING AND IMPROVEMENTS, SANTA ANA, CA <br />Design support for the final PS&E to wipen over 1,000 linear feet of Warner <br />Avenue from Main Street to Oak Street. The project converts the roadway from. <br />a four lane undivided arterial to a six -lane divided arterial to conform to ,City and <br />County arterials master plan. The arterial IncludeCs curb separated Type IV bike <br />lane which will serve to connect two Type I bike lane facilities. Responsibilities <br />Include development of cross section alternatives, roadway design, and. <br />drainage improvements. <br />1-710 UTILITY RELOCATION STUDY, LOS ANGELES COUNTY, CA <br />Design engineer responsible for preparation of a utility relocation study along <br />the central segment of the 1-710 Corridor, between the 1.405 interchange and <br />the Los Angeles Riven The project requires extensive coordination with utility, <br />companies and other agencies as utility relocation would impact underground <br />major gas, oil, sewer, communication, and waterlines, and the relocation of <br />Southern California Edison's 220-kv transmission corridor and 66-kv lines. <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer for this $800M, 4.5 -mile HOV widening and pavement <br />rehabilitation project. Project elements Include reconstruction of two <br />interchanges with left -lane off -ramps, pavement rehabilitation, replacement of <br />three bridges of FEMA -regulated creeks, retaining walls along the sea cliff, and <br />sound walls, <br />BROADWAY STREETSCAPE IMPROVEMENT&, FRESNO, CA <br />Design engineer responsible for plan preparation and design. Project design <br />includes grading, drainage, utility mapping, and bulb -out design. The purpose <br />of the project was to create a pedestrian friendly corridor, beautification of <br />community and revitalization of downtown. <br />