Laserfiche WebLink
CONTACTINFO CHARLIE WKINLEY, PE <br />oharl lo;m0klnleyQnv5.com <br />949585O477 Project Manager <br />EXPERIENCE <br />SO years <br />................ <br />Me. McKinley has more than 30 years of experience as a professional engineer . <br />for <br />both large-scale capital Improvement projects and small Infrastructure Improvement <br />EDUCATION <br />projects, He has a broad range of project experience with a focus on pipelines, pump <br />04, 131omedleal <br />:Engineering <br />stations; reservoirs, and treatment, Mr. McKinley brings an enthusiastio approach to <br />planning, regulatory permitting, detailed design and <br />operations reviewto facilitate civil <br />and environmental engineering projects, <br />LIGEN5E6. <br />0101 Engineer (CA) <br />Project Experience <br />No 038484 <br />AFFIVATIONs <br />Goronado'.Cays.sewage LlftStation <br />Member,board of <br />017Y OF CORONADO I CORONADO, CA <br />01raotors, society <br />Task Leader, Mr. McKinley Was the task leader for the design of a complete overhaul <br />of American Military <br />Engineers, Orange County <br />of an $70 gpm submersible pump station, Pumps, controls; wstWsll configuration; And <br />various facility elements were replaced with current technology <br />Post <br />a$ part dithe project, <br />Member, American public <br />Back Basin Storm Water Pump Station <br />. <br />WorksAssoclation - <br />ELISINORE VALLEY MUNICIPAL WATER bISTRICT I LAKE ELSINORE, CA <br />Inland Empire Chapter <br />ProJact Manager, This projectconalsted of the preliminary and final design of 2,500 <br />a <br />gpm stormwater pump station to accommodate the evacuation <br />President,Watekouse <br />of stormwater from the <br />back, basin wetlands durin gattoverflow event train Lake Elsinore, <br />Association <br />Mountain Belle Pump Station and Water Main <br />VISTA IRRIGATION DISTRI01` I VISTA, CA <br />Protect Engineer, As project engineer, Mr. McKinley was responsible forthe design <br />of an inter -zone transmission main. Challenging terrain allgnments and steep slope <br />installations were evaluated, as well is surge and hydraulics. <br />Fullerton Road Grade Separation Stormwater and Groundwater Pump <br />Stations <br />ROWLAND WATER DISTRICT I INDUSTRY, CA <br />PrOJact Manager, Responsible for the design of a 20,500 gpm stormwater putnp <br />station and a 200 gpm groundwater pump station forthe depression of Fullerton Road <br />Linder UPRR railroad tracks. The project included a hydrauli0analyze$ of storm and <br />groundwater Inflow conditions to match with outflow hydrpgrephs, and mechanical, <br />electrical, and structural design. Main pump station Was permitted by the LAC'DRW, <br />Dudley sewer Colmmission Consulting <br />TOWN OF DUDLEY I DUDLEY, MA <br />Protect Manager. Development of design plans and specifications for three separate <br />sewer extension projects Involving approximately 18,000 feet of gravlly sewer, 7,000 <br />feet of force main, and four duplex submersible pump stations emergency <br />with power, <br />control, and several low-pressure Service areas with Individual grinder pumps and <br />diameter <br />small force mains. Also completed a town -wide Comprehensive Wastewater <br />Management Plan, including obtalri ng State Revolving Fund loans and performance of <br />NIV15odor <br />hydraulic modeling of the sewer system, as well as an on4te system survey. <br />