My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 (2)
Clerk
>
Contracts / Agreements
>
N
>
NV5 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:51:09 AM
Creation date
7/24/2018 11:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-159-05
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Rehabilitation and Reconstruction Study <br />CITY OF COMPTON I COMPTON, CA <br />ProJOct ehglneer. Work consisted of hydraulic and physical evaluations -of the City's major sewers (apprci ttnately 4e 00 <br />feet of 8m to 12-fnch pipe). The objective was to evaluate segments for replacement, repair, or rOhabilitatlon (lining). Sewer <br />CCTV date was reviewed, and Interviews were conducted with operations end melMenahce personnel. Spreadsheets were <br />developed to prioritize the Improvements for a multiyear program, Finally, opinions of probable costs were provided, and <br />the work was presented in a Project Study Report, <br />Wastewater Collection System Upgrade. Program. <br />CITY OF TORRANCE I TORRANCE, CA <br />PraJeet Maupger. Work, consisted of the completion of several protects to upgrade the City's sewer systei'n, The program <br />included sewer rehabilitation initiated by a system-wlde video program; preparation of sewer feplaeemant and extension <br />designs, and development of a concept design for allay sewers. A grease control ordinance was also developed for the pity <br />Code, <br />i <br />F'iilmore SOWel' lhterceptofs <br />CITY OF FILLMORE I FILLMORE, CA <br />Protect Engtdaor, Mr. McKinley was responsible for the conceptual design of newaewer interceptors to routs all flow to a <br />new waatewotertreatment plant site, Associated divetsionfacilities and roadway infrastructure for the new alignment ware <br />also designed as part of this project. <br />Mentone Boulevard Sewer <br />CITY OF'REDLANDS I REDLANDS; CA <br />PrOtOct Manager, As project iinahoger, Mr. McKinley lead file planning and design of a sewer extension on Mentone <br />Boulevard ($R-38), whioPl is a malormoess route to Arrowhead/Big Bear. Utility coordination and traffic control Were key <br />challenges addressed. As a separate project, he also completed the design of 5,000 feet of sewer extension. Project <br />components included the Sewer Master Plan Update, Preliminary Design Report, and plans; specifications, and estimates. <br />Susherd Trunk Sewer <br />ORANGE COUNTY SANITATION DISTRICT I FOUNTAIN VALLEY, CA <br />PrOJeet Manager. Work consisted of the design and canstructlon management of replacing the existing 54-Inch pipeline <br />with approximately 22,000 LF of new 108•Inch concrete -reinforced pipe, The project included geotechnical and structural <br />Pipe design, and coordination with involved cities for traffic control. <br />University of Connecticut WWTP Upgrade and Sewer System Facilities Plan <br />UNIVERSITY OF CONNECTICUT I STORRS. CT <br />PrOJOct lxnglneer. Completion of a sewer system evaluation survey to identify reaches with excessive Inflow and infiltration <br />In the University collection system. An analysis of flows at the treatment plant was completed, as well as a projection of <br />future flows within the study period, A treatment plaint upgrade conceptual plan was also developed. <br />Lakewood Boulevard Recycled Water pipeline <br />CITY OF DOWNEY I DOWNY, CA <br />Proloct Manager. Installation of a recycled water main, potable water meter adjustments, and other miseellaneQus utility <br />relocations and adjustments associated with the design and construction of street improvements and enhancements <br />along Lakewood Boulevard from Florence Avenue to Telegraph Road, Project was divided into two segments; Lakewood <br />Boulevard between Florence Avenue and Gallatin Road (2,800 feet); and Lakewood Boulevard between Gallatin Road and <br />Telegraph Road (2,700 feet), <br />
The URL can be used to link to this page
Your browser does not support the video tag.