Laserfiche WebLink
CONTACTINFO <br />derek.wlesko@nv$.com <br />9494815;0477 <br />i <br />EXPERIENCE <br />25 years <br />EDUCATION <br />M.B.A. <br />MS. Civil Engineering <br />B.S. Civil Engineering <br />LICENSES <br />Civil Enlilneer(CA) <br />Nm 49572 <br />AFFILIATIONS <br />Member, American'Scelety <br />of Civil; Engineers <br />Member (1993.1994), <br />Standards'Setting <br />Committee iorthe <br />California Ste a Board <br />of Registration for <br />Professional )engineers <br />and Land Surveyors <br />Member (2002), <br />Countrywide New <br />Developmentand <br />Constructicn Water Quality <br />-- Task Force <br />DEREK WIESKE, PE <br />Quality Assurance/Quality control <br />,., rri,i♦ .. 4. A ........... F . .. '1�rry... n..n.r.....ne.vru..v... n.ps....Yn( <br />Mr, Wieake has more than 25 years ofhpAGIS nn experience in the development, <br />design and construction of capital Improvement projects for public, agencies. His <br />vast Catalog of projects Includes roadways and pedestrian improvements) parks and <br />landscaping, water and sewer Infrastructure, and buildings, Mr. Wie$ke has served in a <br />variety Of roles from City Engineer to Director of Public, Works for agencies throughout <br />Southern Callfornia including theCiti'e$ Of Long Beach, Laguna Beach, and Lake Forest, <br />Project Experience <br />Downtown Area Resurfacing <br />CITY OF LAGUNA BEACH I LAGUNA BEACH, CA <br />PrOJect Nlaneger, Mr, Weeks oversaw the design and construction of the resurfacing <br />of the downtown area of. aguna Beach and Coordinated with local busihesses to. <br />m'Ini,mize acirnolnio Impacts of construction. In addition to streetresurfecing, the <br />Project included installation of various traffio-oalmingfeatures, suoh.as bulbouts, <br />Mr. W.aske introduced a bonus clause into the specifications, which s.gniticantly <br />accelerated project Construcklon, resulting In praise from local shop owners for a <br />successful project. <br />Stormwater Diversion Systems Installation <br />CITYOF LAGUNA BEACH I LAGUNA BFACH,CA <br />Prpjeot Manager, Mr. Wieske was responsible for the design and construction of <br />stormwater separators (CDS Units) to divert urban runoff from roadways, and the City <br />stormdrain system tC VIC municipal sewer collection system, Challenges Included <br />working with sewer systems without disrupting service, and the design of a systern that <br />can be maintained with relative ease. <br />Lexington Drive Road improvements <br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA <br />Project Manager, Mr. Wleske was responsible for the Installation of a half -mile <br />section of arterial highway from Katella Avenue to Cerritos Avenue. He reviewed <br />and approved plans and specifications and oversaw all construction management/ <br />inspection activities for this project. The project Involved close coordination with trJe <br />representatives from the City of Cypress and an adjacent community church that was <br />funding the roadway Improvements, <br />Ball Road and Bloomfield Street Intersection and Drainage Improvements <br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA <br />PfOiect Manager, Mr, Wieske served as the project manager for the installation of <br />1,400 LF of storm drain and roadway rehabilitation. The design alignment of the <br />storm drain conflicted with multiple utilities, including sewer, water, gas, electric, <br />and oil pipelines. He oversaw the design of the project, including significant value <br />engineering, plan and specification quality control, bldding process, and coordination <br />with partnering funding agency. The project required extensive coordination with utility <br />agencies to either relocate or adjust conflicting utilities, <br />