CONTACTINFO
<br />derek.wlesko@nv$.com
<br />9494815;0477
<br />i
<br />EXPERIENCE
<br />25 years
<br />EDUCATION
<br />M.B.A.
<br />MS. Civil Engineering
<br />B.S. Civil Engineering
<br />LICENSES
<br />Civil Enlilneer(CA)
<br />Nm 49572
<br />AFFILIATIONS
<br />Member, American'Scelety
<br />of Civil; Engineers
<br />Member (1993.1994),
<br />Standards'Setting
<br />Committee iorthe
<br />California Ste a Board
<br />of Registration for
<br />Professional )engineers
<br />and Land Surveyors
<br />Member (2002),
<br />Countrywide New
<br />Developmentand
<br />Constructicn Water Quality
<br />-- Task Force
<br />DEREK WIESKE, PE
<br />Quality Assurance/Quality control
<br />,., rri,i♦ .. 4. A ........... F . .. '1�rry... n..n.r.....ne.vru..v... n.ps....Yn(
<br />Mr, Wieake has more than 25 years ofhpAGIS nn experience in the development,
<br />design and construction of capital Improvement projects for public, agencies. His
<br />vast Catalog of projects Includes roadways and pedestrian improvements) parks and
<br />landscaping, water and sewer Infrastructure, and buildings, Mr. Wie$ke has served in a
<br />variety Of roles from City Engineer to Director of Public, Works for agencies throughout
<br />Southern Callfornia including theCiti'e$ Of Long Beach, Laguna Beach, and Lake Forest,
<br />Project Experience
<br />Downtown Area Resurfacing
<br />CITY OF LAGUNA BEACH I LAGUNA BEACH, CA
<br />PrOJect Nlaneger, Mr, Weeks oversaw the design and construction of the resurfacing
<br />of the downtown area of. aguna Beach and Coordinated with local busihesses to.
<br />m'Ini,mize acirnolnio Impacts of construction. In addition to streetresurfecing, the
<br />Project included installation of various traffio-oalmingfeatures, suoh.as bulbouts,
<br />Mr. W.aske introduced a bonus clause into the specifications, which s.gniticantly
<br />accelerated project Construcklon, resulting In praise from local shop owners for a
<br />successful project.
<br />Stormwater Diversion Systems Installation
<br />CITYOF LAGUNA BEACH I LAGUNA BFACH,CA
<br />Prpjeot Manager, Mr. Wieske was responsible for the design and construction of
<br />stormwater separators (CDS Units) to divert urban runoff from roadways, and the City
<br />stormdrain system tC VIC municipal sewer collection system, Challenges Included
<br />working with sewer systems without disrupting service, and the design of a systern that
<br />can be maintained with relative ease.
<br />Lexington Drive Road improvements
<br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA
<br />Project Manager, Mr. Wleske was responsible for the Installation of a half -mile
<br />section of arterial highway from Katella Avenue to Cerritos Avenue. He reviewed
<br />and approved plans and specifications and oversaw all construction management/
<br />inspection activities for this project. The project Involved close coordination with trJe
<br />representatives from the City of Cypress and an adjacent community church that was
<br />funding the roadway Improvements,
<br />Ball Road and Bloomfield Street Intersection and Drainage Improvements
<br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA
<br />PfOiect Manager, Mr, Wieske served as the project manager for the installation of
<br />1,400 LF of storm drain and roadway rehabilitation. The design alignment of the
<br />storm drain conflicted with multiple utilities, including sewer, water, gas, electric,
<br />and oil pipelines. He oversaw the design of the project, including significant value
<br />engineering, plan and specification quality control, bldding process, and coordination
<br />with partnering funding agency. The project required extensive coordination with utility
<br />agencies to either relocate or adjust conflicting utilities,
<br />
|