My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 (2)
Clerk
>
Contracts / Agreements
>
N
>
NV5 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:51:09 AM
Creation date
7/24/2018 11:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-159-05
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO PHIL KERN,. PE <br />phli«kern�nv5.00m <br />S49.565.0477 PYOjedt Ehglneer <br />.......... <br />EXPERIENCE Phil has rngre then 30 years of exparlence.designing and processing publlo works ..... <br />More than 30 years projects. He has performed In the capacity of Project Manager on a wide variety of civil <br />EDUCATION engineering projects InWolvingtransportaticn fadlifies, utilityrepaireand upgrades, <br />and site work..He has been dlrectiyresponslble for the preparation of grading plans, <br />BS Civil Engineering -.San Infrastructure Improvement plans,_ specifiostions, traffic control/phasing plans, and <br />Diego State University corigtruotfon administration for numerous complex olvil engineering proJ®ots. 16 addition. <br />,(loss) to having special technical emphasis in the areas of hydrology, hydraulics, site slid <br />CertiflcatgQajEMASafgty transportation design, Phil's capabllities areenhanoed by his eye for detail and skills in <br />Assessment Program organ'izaflon, protect planning, and writtdn communication.. <br />Evaluator-0KOB Project Experlence. <br />Prafosslonel`Engineer -CA East Valley Parkway Widening I City of Esoondido <br />040631 - Project Manager for design of one half Mile widening;ofEast Velcy,parkwayend Valley <br />Center Road to prime arterial standards betweon Seven Drive end the northerly qJ - <br />Professional Engineer- NV limits where itJohaed improvements previously constructed bythe County,T'h1sS5M <br />#9144 project will eliminate a traffic bottleneck and fealures a bridge widening, traffic signal <br />modifications, streetscape design, and.preparation of right of, way documents and <br />environmental services. The designers took special care during the geometric approval <br />phase of the project to ensure that the improvements were no more than nsQdod to. <br />accommodate future traffic prdjections, sating the City capital funds that could be <br />applied to other needs, <br />Melrose Drive EXtenston I City of Oceanside <br />QA/QCofficer for the design of the missing link of Melrose Drive between Spur Avenue; <br />located about one-half mile south of State Route 76, and North Santa Fe Avenue, 300 <br />feet north of Willowbrook Drive.. This 3,000-foot roadway extension Includes the design <br />Of a proposed bridge crossing over Guajome Lake Road and some wetland habitat. <br />Additionally, Melrose Drive will be widened for 1,900 feet between North Santa Fe <br />Avenue and Sagewood Drive, <br />College Boulevard Widening I City of Oceanside <br />Project manager for preliminary design of widening of College Boulevard from four <br />to six lanes between Clive Avenue end Camino de Is Plata in the City of Oceanside. <br />Efforts included geometric design, detailed field surveying of constraints, siting water <br />quality SMPs and environmental coordination, <br />San Diego County Women's Detention Facility l County of San Diego <br />Project manager for preliminary and final oivil engineering of a design-bulid project <br />to replace the existing.women's detention facility with a state-of-the-art, $221 <br />million, 475,000-square-foot facility on a 45-acre site. Design challenges include <br />maintaining operations at the existing Las Colinas facility during construction of Phase <br />1, stonnwater oomplianbe at the riverside site, and obtaining approvals by the local <br />municipallty and utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.