Laserfiche WebLink
-a pttpfkAL c4+ AStG <br />Civic Canteratormavotert.iftStotionRenovation Design Services <br />Marek Prxywara, P.E. <br />Dead Electrical Engineer <br />Mr. Przywara has served as a project manager and/or <br />electrical/controls engineer on the numerous water/wastewater <br />facilities including wastewater treatment plants, pump stations, <br />sewer stations, reservoirs, solid waste facilities, desalt plants, <br />etc. Duties Included overall responsibility for engineering, <br />project management, development and design implementation, <br />supervision and approval of documentation and drawings, <br />calculations and analysis, schedules, specifications, cost <br />estimates, and coordination with vendors and clients. Mr. <br />Przywara has provided electrical and controls engineering and <br />project management services for water and wastewater districts, <br />municipalities, and utilities. <br />Project Experience <br />Civic Center Stormwater Lift Stations — Preliminary Study, <br />Santa Ana, California. City of Santa Ana. Electrical Engineer, <br />Michael Baker was retained by the City of Santa Ana to <br />perform a preliminary study of two stormwater pump stations <br />located within the Civic Center area. Both pump stations have <br />been experiencing leakage and flooding problems during the EI <br />Nino season of 2016 and the City intends to upgrade the lift <br />stations before the next large storm event. The preliminary <br />study included on-site inspections and visual assessments of <br />the structure, electrical equipment, mechanical equipment, and <br />general conditions of each facility and provided proposed <br />recommendations. <br />North Bank lift Station Upgrades, San Buenaventura, <br />California. City of San Buenaventura. Provided QAIQC for the <br />project design and evaluated project constructability. Michael <br />Baker developed a comprehensive PDR that considered' four <br />upgrade alternatives and corresponding cost estimates to <br />address both capacity limitations and operation and <br />maintenance issues. Michael Baker then completed final <br />design of the selected upgrades which consist of: <br />Removal of three (3) existing VFDs and installing four (4) <br />new PowerFlex 753 VFl <br />Installing new wiring between new VFDs and new motors. <br />Installing additional digital input and analog output card for <br />PLC. <br />Providing 1/0 connection Diagram for the SCADA <br />Integrator to program existing PLC. <br />Removal of existing in-line grinder electrical distribution <br />and control panel and wiring. <br />Years of Experience: 34 <br />Eciucakion/Training: <br />M.S., 1974, Electrical <br />Engineering, AGH University <br />of Science & Technology <br />B.S., 1972, Electrical <br />Engineering, ASH University <br />of Science & Technology <br />Li cen sea/Cortffloati o n s; <br />Professional Engineer - <br />Electrical, California, 1994, <br />14537 <br />Professional Engineer - <br />Electrical, Washington, 2009, <br />46104 <br />Additional Projects., iI <br />r• Whittier Pumping Plant No.2 <br />Replacement <br />> Mesa Water District, Uvell s <br />Automation and Rehabilltation z4 <br />Project, Costa Mesa <br />Sunflower Pump Station, <br />Fountain Valley, Orange <br />County Sanitation District 4: <br />San Vicente Pump Station, <br />San Diego County Water <br />Authority r <br />r Sevier Pump Station 35, City g° <br />of San Diego <br />/ B 649 Wastewater Pump <br />Station Rehabilitation at Naval fl <br />Air Station North Island, San <br />Diego <br />B 356 Wastewater Pump _ <br />Station Rehabilitation at Naval r <br />Air Station North Island hf <br />r 65th & Herrick Pump Station, <br />California. City of San Diego <br />Tract 5325 Warwick Pump <br />Station <br />i Couser Canyon Pump Station, -_ <br />Valley Center Municipal Water <br />District <br />N ran N AT 10 R A u Marek Przywara, P.E. <br />